HousePrecheckCheck an address

1995 Yonge StSouth Eglinton-Davisville, Toronto · City records before you offer

Commercial residential · CR SS2 (x554)5.5 × 26.3 m139 m²on Yonge St

2 things to check before you offer, including building permit open since 2024
N10 m
5.5 m frontage26.3 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 1995 Yonge St

1995 Yonge St is on a 5.5 m by 26.3 m lot on Yonge St in South Eglinton-Davisville. The zoning is CR. A site-specific exception, 900.11.10(554), changes some of the usual rules for this address.

The City has 8 records on this lot since 1983. That is more than at 98% of Toronto houses. In 2026, a building permit was filed: "Rev 01 - change of use from a2 to c occupancy on 2nd floor, and interior alterations of an existing suite including architectural, hvac, plumbing, and…". Status: revision issued. In 2024, a building permit was filed: "Rev 01 - minor changes to ground & 2nd floor levels. no change of use - vacant restaurant use remains. storefront, 2 entrance doors & demising wall removed…". Status: revision issued. In 1998, a building permit was filed: "Alter 2nd floor window to make into door with no access to exterior. edc (applicant to bring in survey)". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 13 development applications are open (the tallest up to 48 storeys). Davisville station is a 5-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2024ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(554)Moderate
  • 1 by-law investigation closed in the last two yearsLow
  • 13 development applications open within 300 mLowFree check
  • Yonge-Eglinton Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2024
  • Work or applications in progress
  • 1 by-law investigation closed in the last two years

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2024

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 1 by-law investigation closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

City files on this lot

8 records on file, more than at 98% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-03-20Building permit
25 270433
Rev 01 - Change of Use from A2 to C occupancy on 2nd floor, and interior alterations of an existing suite including architectural, HVAC, plumbing, and electrical work.Proposal for interior alterations of existing suite.Revision Issued
2025-10-17By-law investigation
25 240975 PRS 00 IR
Property StandardsClosed
2024-10-21Building permit
23 202706
REV 01 - Minor changes to ground & 2nd floor levels. No change of use - vacant restaurant use remains. Storefront, 2 entrance doors & demising wall removed from orig. proposal.Proposal for interior alterations to return the exist. single tenant restaurant space on the ground floor & 2nd floor levels to base building condition. Scope incl. constructing a demising wall at the gf level to separate & create 2 new vacant units. Occupancy permits req'd for gf+bsmnt & 2nd flr levels. Exterior Alterations for modifications to the exist. storefront at the gf level (reduction in NRGFA).Revision Issued
1998-10-02Building permit
98 022018
ALTER 2ND FLOOR WINDOW TO MAKE INTO DOOR WITH NO ACCESS TO EXTERIOR. EDC (APPLICANT TO BRING IN SURVEY).Closed
1995-09-08Building permit
95 020034
ALTER STOREFRONT. FEES COLLECTED UNDER PERMIT 375500Closed
1993-10-28Zoning review
93 025737 LTO
No description on fileClosed
1993-01-28Zoning review
93 024685 LTO
No description on fileClosed
1983-02-10Zoning review
83 025580 LTO
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(554)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(554)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Yonge-Eglinton Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(554)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
5.5 m frontage26.3 m deepon Yonge St
Zone
CR SS2 (x554)
Height limit
25.5 m
Corner lot
No
Public lane
None
House footprint
100 m²
Back yard
6 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 13 development applications open within 300 m, up to 48 storeys
    • In the Davisville station area
    • 7 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 13 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 6 of 6 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    South Eglinton-Davisville neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$80,000median $84,500
    Households that own their home30%median 54%
    Population (2021)22,735median 16,813
    Homes built in 1960 or before11%median 29%
    Homes needing major repairs3%median 7%

    Getting around and schools

    • Davisville StationNearest station5 min walk
    • Yonge St at Belsize DrNearest TTC stop1 min walk
    • Yonge StNearest cycling route4 min walk
    • The Study AcademySchool2 min walk
    • The Study Academy SchoolSchool2 min walk
    • Davisville & Spectrum SchoolSchool4 min walk
    • Manor Montessori - de Savery SiteSchool10 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3436
    • Robberycity median 69.524.2
    • Auto theftcity median 192.658.8
    • Theft over $5,000city median 46.120.8
    • Break and entercity median 172.8128
    • Theft from vehiclescity median 188.1100.3

    More about South Eglinton-Davisville

    Ready emails

    Copy and send as they are.

    5 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 1995 Yonge St

    2 things to check at 1995 Yonge St before you offer

    • Building permit open since 2024Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(554)Moderate
    • 1 by-law investigation closed in the last two yearsLow
    • and 2 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 8 steps to take before you offer, so nothing slips
    • What each of the 6 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.