Building permits on a Toronto house: what to check before you buy

You can search building permits on a Toronto house for free in the City's Building Permit Application & Inspection Status tool. It shows active permits up to 10 years old and permits closed or cancelled within the last month. For an official record of permits, inspections and outstanding orders, the City sells a Property Information Report for $214.79.

What an open permit means

A building permit stays open until the required inspections are done and Toronto Building closes it. The work may still be under way. Or it was finished years ago and nobody booked the final inspection, which is the case a buyer should notice.

According to the City, the current owner is responsible for outstanding permits, including permits a previous owner took out. Open permits may delay a sale or a mortgage, because buyers and lenders can ask for proof that the work was inspected.

To close a permit, the owner books a final inspection. Work that was never inspected along the way may also need a report from an engineer or architect. When the work never started, the owner can ask Toronto Building to revoke the permit. Permits more than 18 months old with no inspection requested can get a Notice of Intention to Revoke. Check a house for open building permits.

Work done without a permit

Common projects that need a permit in Toronto include an addition, a deck more than 60 cm above the ground, adding or removing walls, new or larger window and door openings, plumbing or heating changes, and a change of use, such as a house with one unit becoming a house with several. Finishing a basement needs a permit if the work includes structural changes, new plumbing, underpinning, a basement entrance or a second suite. A basement finished without any of those does not. Check if a basement apartment has a permit on file.

When unpermitted work comes to light, the City can charge a "work without permit" fee of 50% of the permit fees, and the work may have to be changed or removed. The homeowner pays, even if a contractor said no permit was needed. After closing, that is you.

Where to look, side by side

SourceWhat it showsCostTime
Building Permit Application & Inspection StatusActive permits up to 10 years old, plus permits closed or cancelled in the last month. Updated to the previous business dayFreeRight away
Inspection Status ReportFor one permit: which inspection stages passed, did not pass or are outstanding. Needs the permit number$92.46Online request
Property Information ReportIssued permits on file, inspection status, outstanding orders under the Building Code, Zoning By-law and Property Standards By-law$214.79About 5 business days
Toronto Building records disclosurePlans and records from earlier permit applications$76.98 per disclosureTarget of 30 business days
City of Toronto ArchivesPermit application stubs for the former City of Toronto, up to 1970Research visit in personIn person

How to check a house before you offer

  1. Search the address in the City's permit status tool. Note each permit number, what the permit is for and its status. "Inspection" means the permit was issued and is under active inspection.
  2. Look at the dates. An application from years ago that is still under inspection deserves a question. Open permits older than 10 years will not show up in this tool.
  3. Compare the listing with the file. When a listing mentions a finished basement, a basement apartment, a new deck or an addition, look for a permit that matches. A missing permit is a question for the seller, not proof of a problem.
  4. Go further back with open data. Toronto's open data portal has active and cleared building permits, refreshed daily, though records for applications made before October 1, 1999 are likely incomplete. Permit stubs for the former City of Toronto up to 1970 sit at the City Archives.
  5. Order formal records when you need them. With a permit number, an Inspection Status Report shows which stages passed. A Property Information Report covers the whole address; you order it with the City's form or by email to bldapplications@toronto.ca. Old plans come through Toronto Building's records disclosure, and some of them need the owner's written consent.

Questions to raise before you offer

Ask the seller, through your agent:

  • What renovations were done while they owned the house, and were permits taken out?
  • For each open permit: what work was done, and which inspections did it pass?
  • Will they book the final inspection and close open permits before closing?
  • Was the advertised basement apartment or second suite built under a permit, and what is the permit number?

Your home inspector cannot confirm permits but can point at newer work worth asking about: a finished basement, a deck, an added room, a removed wall.

Ask your lawyer whether to order the Property Information Report before closing and how to deal with an open permit in the agreement. According to the City, the report is often required before a property transfer. For the other records to check before an offer, see our pre-offer checklist.

How common is it in Toronto?

In our count of 464,752 Toronto houses in November 2026, 29,508 (6.3%) had a building permit still open and 13,679 (2.9%) had work or applications in progress. Another 15,797 houses (3.4%) show an item to check before the offer: no permit for a second unit is on file. That matters if the listing advertises a second unit.

Check a house in one place

HousePrecheck reads the City's open data on active and cleared building permits and shows the permits on file for any Toronto house, next to zoning, heritage, TRCA and by-law records. Check an address for free. The $29 pre-offer report explains each open permit in plain English, lists what to ask the seller, drafts the emails to your agent and lawyer, and watches the address until closing.

FAQ

How do I search building permits by address in Toronto?

Use the City's Building Permit Application & Inspection Status search. It covers active permits up to 10 years old and permits closed or cancelled within the last month, updated to the previous business day. HousePrecheck also shows permits from the City's open data for any Toronto house.

Is an open building permit a problem when buying a house?

It can be. An open permit means the required inspections were not completed or the permit was never closed. Under City rules, the current owner is responsible for outstanding permits, even ones a previous owner took out. Ask the seller to close it, and ask your lawyer how to handle it.

What is a Property Information Report in Toronto?

A City report for one address listing issued building permits, the status of inspections and outstanding orders under the Ontario Building Code, the Zoning By-law and the Property Standards By-law. It costs $214.79, takes about five business days and does not say what uses are permitted.

How do I order a Property Information Report?

Fill in the City's application form and email it to bldapplications@toronto.ca with "Property Information Report or Compliance letters" in the subject line.

How can I see permits older than 10 years?

Try the City's open data on cleared permits, a records request to Toronto Building, or the City Archives for the former City of Toronto up to 1970.

Does a finished basement need a permit in Toronto?

It depends on the work. You need one when finishing includes structural changes, new plumbing or heating, underpinning, a basement entrance or a second suite.

Updated October 17, 2026. HousePrecheck is a screening tool, not legal advice. Confirm anything that matters with Toronto Building or your lawyer.