HousePrecheckCheck an address

South Eglinton-Davisville

What to check before you buy a house here

South Eglinton-Davisville is a neighbourhood in the former City of Toronto, with 1,156 properties. As of Nov 28, 2026, 240 of them (21%) have at least one item to check before an offer in City of Toronto and TRCA records: 96 have a building permit that was never closed, 20 have an open City order and 55 are on the Heritage Register. 121 development applications are still open here.

Before an offer here

Properties in South Eglinton-Davisville with something to check before an offer in City of Toronto and TRCA records, the same things each house's page lists before you offer. Each page says what it means and how to confirm it.

Getting around, schools and safety

Stations in or near South Eglinton-Davisville

  • Davisville Station
  • Eglinton Station
  • Mount Pleasant Station

Schools in South Eglinton-Davisville

  • Davisville & Spectrum School
  • Eglinton Jr Public School
  • Manor Montessori - de Savery Site
  • The Study Academy School

Police-reported crime, 2025, per 100,000 people

  • Assault436 (Toronto median 636)
  • Robbery24 (Toronto median 70)
  • Auto theft59 (Toronto median 193)
  • Theft over $5,00021 (Toronto median 46)
  • Break and enter128 (Toronto median 173)
  • Theft from vehicles100 (Toronto median 188)

The neighbourhood

$80,000Median household income (2020) · Toronto median neighbourhood $84,500
30%Households that own their home · Toronto median neighbourhood 54%
22,735Population (2021) · Toronto median neighbourhood 16,813
11%Homes built in 1960 or before · Toronto median neighbourhood 29%
3%Homes needing major repairs · Toronto median neighbourhood 7%

Statistics Canada, 2021 Census, through the City's neighbourhood profiles.

What's being built nearby

121 development applications are still open in South Eglinton-Davisville. Check what is planned next to a house.

Latest Committee of Adjustment decisions

  1. 16 Servington CresApprovedAug 19, 2026 · A0486/26TEY

    Alter the existing three- storey detached dwelling (basement level is considered the first storey) by constructing a complete fourth storey addition, a rear two- storey addition (cantilevered at the southwest corner, including a

  2. 20 Soudan AveApprovedAug 19, 2026 · A0463/26TEY

    Alter the development standards for the 38-storey mixed-use building (approved under Site Specific Zoning By-Law 153-2022(OLT)), to permit six obstructed parking spaces with a reduced width (located on parking levels P1 to P5)

  3. 36 Wilfrid AveApprovedAug 12, 2026 · A0454/26TEY

    Alter the existing two-storey detached dwelling by constructing a front (north) two-storey addition with a porch and stairs, a side (west) rotunda staircase, a side (east) second storey balcony, and a rear (south) two-storey addition

  4. 105 Belsize DrApprovedJul 8, 2026 · A0340/26TEY

    Alter the existing two-storey detached dwelling (houseplex) by constructing a front basement walkout, and a front yard parking pad

  5. 26 Carey RdRefusedFeb 4, 2026 · A0924/25TEY

    Construct a new undersized front yard parking pad, abutting Carey Road

  6. 522 Mount Pleasant RdApprovedJan 14, 2026 · A0813/25TEY

    Alter the existing three-storey commercial building by constructing a front entrance accessible ramp, a complete fourth storey addition with a side (south) courtyard, and a staircase enclosure on the rooftop level

  7. 119 Merton StApprovedNov 19, 2025 · A0742/25TEY

    Alter the existing 12-storey apartment building (Building A) by enclosing the double-height opening within Unit 417 (located on the fourth and fifth levels) for additional habitable space

  8. 289 Balliol StApprovedJul 23, 2025 · A0345/25TEY

    Alter the development standards (as approved under Site Specific Zoning By-law 39-2025(OLT)), for a new 31-storey residential building, by increasing the building height from 102.9 m to 104.6 m

How to read a Committee of Adjustment decision. What a minor variance is and what to ask about one before you offer.

If you plan to add a unit or extend

55%where a garden suite likely fits
5garden and laneway suite permits since 2022
80%of 15 minor variances approved, last 2 years
110building permits in the last 12 months

Questions about South Eglinton-Davisville

How many houses in South Eglinton-Davisville are in the TRCA regulated area?
0 of 1,156 properties (0%), as of Nov 28, 2026. Work on these lots may need a TRCA permit as well as a City permit. What a TRCA regulated area means
How many have a building permit that was never closed?
96 properties (8%). Work that never passed its final inspection passes to the buyer at closing. Building permits before buying
Are there heritage houses in South Eglinton-Davisville?
55 properties are on the City of Toronto Heritage Register. Heritage status limits changes to the outside of the house and can slow a permit. The Toronto Heritage Register
What is being built in South Eglinton-Davisville?
121 development applications are open. In the last two years the Committee of Adjustment decided 15 minor variances here and approved 12.
How do I check a specific house in South Eglinton-Davisville?
Enter its address above. The free check shows open City files, restrictions and what is planned nearby. The Pre-offer report ($29 CAD) explains each record and what to ask, and whom, before you offer.

Every street in South Eglinton-Davisville

Counted on Nov 28, 2026 from City of Toronto and TRCA open data. A screening of public records, not a zoning review or legal opinion; confirm what matters with the City. Contains information licensed under the Open Government Licence – Toronto.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.