HousePrecheckCheck an address

185 Balliol StSouth Eglinton-Davisville, Toronto · City records before you offer

Also 185 Balliol St

Residential · R (d2.0) (x131)≈ 58.9 × 88.3 m4,384 m²on Pailton Crescorner, also on Balliol St

2 things to check before you offer, including building permit open since 2016
N20 m
≈ 58.9 m frontage≈ 88.3 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 185 Balliol St

185 Balliol St is on a 58.9 m by 88.3 m lot on Pailton Cres in South Eglinton-Davisville. The zoning is R. A site-specific exception, 900.2.10(131), changes some of the usual rules for this address. The lot also fronts Balliol St.

The City has 21 records on this lot since 1997. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal to erect a temporary air supported structure on an existing tennis court area. tent to be in place from october 13, 2026 to april 13, 2027". Status: inspection. In 2025, a building permit was filed: "Proposal to erect a temporary air supported structure on an existing tennis court area". Status: closed. In 2022, a building permit was filed: "Install air supported structure above exiting tennis courts in south side yard of property. permission being sought for temporary time only (october 15, 2022…". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 9 development applications are open (the tallest up to 40 storeys). Davisville station is a 8-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2016ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.2.10(131)Moderate
  • No permit for a second unit on fileLowFree check
  • 9 development applications open within 300 mLowFree check
  • 3 City trees in front of this lotLowFree check
  • Yonge-Eglinton Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 6 units · Garden suite

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2016
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2016

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

21 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-10-13Building permit
26 244498
Proposal to erect a temporary air supported structure on an existing tennis court area. Tent to be in place from October 13, 2026 to April 13, 2027Inspection
2026-07-25By-law investigation
26 208735 GRA 00 IR
GraffitiClosed
2025-10-01Building permit
25 229326
Proposal to erect a temporary air supported structure on an existing tennis court area.Closed
2022-10-27Building permit
22 215694
Install air supported structure above exiting tennis courts in south side yard of property. Permission being sought for temporary time only (OCTOBER 15, 2022 through to APRIL 15, 2023. (Same as permits 21 226663 TPS 00 TS, 20 181692 TPS 00 TS, 19 215399 TPS, 18 222972 TPS, 17 245279 TPS, 16 196278 TPS, and 15 225133 TPS)Closed
2022-03-30Zoning review
20 193801 PSP
No description on fileClosed
2021-11-01Building permit
21 226663
Proposal to install an air supported structure above existing tennis courts in the south side yard of the property from October 18th, 2021 through to April 15th, 2022.Closed
2021-08-02Zoning review
20 193619 PRZ
No description on fileClosed
2020-09-15Development application
20 193801 STE 12 SA
INACTIVE Application for Site Plan Approval of a proposed 35-storey mixed rental residential building, with retail at-grade along Pailton Cres, approximately 437 (previously 449 units) and 32.017.60m2 of GFA (previosuly 33,395m2 of GFA)Under Review
2020-09-15Development application
20 193619 STE 12 OZ
Proposal for a 35-storey mixed rental residential building, with retail at-grade along Pailton Cres, with approximately 437 units and 32130m2 of GFA.Council Approved
2020-08-26Building permit
20 181692
Proposal to install an air supported structure above existing tennis courts in the south side yard of the property from October 15th, 2020 through to April 15th, 2021.Closed
2019-09-12Building permit
19 215399
Intstall air supported structure above exiting tennis courts in south side yared of property. Permission beight sought for temporary time only (October 10, 2018 to April 10, 2019)Closed
2018-09-24Building permit
18 222972
Proposal to install an air supported dome structure above existing tennis courts in the south yardbetween October 10, 2018 - April 10, 2019. Duration not to exceed 26 weeks.Closed
2017-10-20Building permit
17 245279
Proposal to install an air supported dome structure over the tennis courts on south side. Oct 15/2017 - April 15/2018Closed
2016-08-30Building permit
16 196278
Proposal to install an air supported dome structure over the tennis courts on south side. Oct 15/2016 - April 15/2017.Closed
2016-07-15Building permit
16 175894
Proposal to install a 1 1/4 inch backflow prevention device.Inspection
2015-10-07Building permit
15 225133
Proposal to install an air supported dome structure over the tennis courts on south side. Oct 15/2015 - April 15/2016.Closed
2015-07-22Building permit
14 268736
Proposal for an air supported dome structure over the tennis courts, to be erected January 2nd, 2015 and removed May 19th 2015Closed
2013-09-03Building permit
13 229736
Proposal for a temporay tent structure (already erected) fronting Balliol St - to be dismantled October 1st, 2014.Cancelled
2000-10-24Minor variance
A485/00TO
Create two new parking stations, one at the front and one on the east side of the tennis club on the property. Each parking station will accommodate six vehicles.Pending
2000-05-01Zoning review
00 145854 000
No description on fileClosed
1997-03-13Zoning review
97 026044 LTO
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.2.10(131)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.2.10(131)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 3 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Yonge-Eglinton Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.2.10(131)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Some

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 6 units: likely fits
  • Garden suite: likely fits
  • Secondary suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 6 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  2. Garden suite

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N20 m
≈ 58.9 m frontage≈ 88.3 m deepon Pailton Cres
Zone
R (d2.0) (x131)
Height limit
38 m
Corner lot
Yes, also on Balliol St
Public lane
None
New house permit
None since 2000
House footprint
2,112 m²
Back yard
12 m
Buildings on the lot
3

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Busy

Building nearby

How much neighbours are building and applying to change within 300 m

  • 9 development applications open within 300 m, up to 40 storeys
  • In the Davisville station area
  • 9 suite and multiplex permits within 300 m in 10 years

What this part means for this house, in plain EnglishUnlock

  1. 9 development applications open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime well below median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 6 of 6 categories

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

South Eglinton-Davisville neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$80,000median $84,500
Households that own their home30%median 54%
Population (2021)22,735median 16,813
Homes built in 1960 or before11%median 29%
Homes needing major repairs3%median 7%

Getting around and schools

  • Davisville StationNearest station8 min walk
  • Davisville Ave at Pailton CresNearest TTC stop3 min walk
  • Kay Gardiner Beltline TrlNearest cycling route2 min walk
  • Davisville & Spectrum SchoolSchool6 min walk
  • Greenwood College SchoolSchool7 min walk
  • Toronto Prep SchoolSchool7 min walk
  • Manor Montessori - de Savery SiteSchool9 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3436
  • Robberycity median 69.524.2
  • Auto theftcity median 192.658.8
  • Theft over $5,000city median 46.120.8
  • Break and entercity median 172.8128
  • Theft from vehiclescity median 188.1100.3

More about South Eglinton-Davisville

Ready emails

Copy and send as they are.

4 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 185 Balliol St

2 things to check at 185 Balliol St before you offer

  • Building permit open since 2016Moderate
  • Work or applications in progressModerate
  • Site-specific exception 900.2.10(131)Moderate
  • No permit for a second unit on fileLow
  • and 4 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 7 steps to take before you offer, so nothing slips
  • What each of the 8 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.