Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 98 Dawes Rd
98 Dawes Rd is on a 13.4 m by 35.1 m lot on Dawes Rd in Taylor-Massey. The zoning is RD.
The City has 9 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2022, a building permit was filed: "Proposal to convert a multi unit dwelling to single family dwelling. interior alterations on all floors". Status: permit issued. In 2004, a building permit was filed: "Construct two storey front addition and first floor rear addition see c. of a. decision". Status: closed. In 2003, a Committee of Adjustment application was filed: "The applicant is seeking permission to construct a two storey addition to the front of the existing converted house containing four dwelling units and also, a…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 1 development application is open (the tallest up to 8 storeys). Main Street station is a 7-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2022ModerateFree check
- No permit for a second unit on fileLowFree check
- 1 development application open within 300 mLowFree check
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units · Garden suite · Lot split (severance)
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2022
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
Building permit open since 2022
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
9 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2022-09-19 | Building permit22 200307 | Proposal to convert a multi unit dwelling to single family dwelling. Interior alterations on all floors. | Permit Issued | |
| 2004-01-19 | Building permit03 187741 | CONSTRUCT TWO STOREY FRONT ADDITION AND FIRST FLOOR REAR ADDITION SEE C. OF A. DECISION | Closed | |
| 2003-09-10 | Minor varianceA0409/03TEY | The applicant is seeking permission to construct a two storey addition to the front of the existing converted house containing four dwelling units and also, a rear one storey addition. The front addition will have dimensions of 1.42 by 5.59 metres and will contain a floor area of 15.14 square metres and the rear addition will have dimensions of 3.25 by 3.22 metres and will contain a floor area of 10.465 square metres. The existing use as a converted house containing four dwelling units is legal non-conforming and any enlargement or extension of that use requires permission from the Committee of Adjustment under Section 45(2a) of the Planning Act. | Approved | |
| 2003-06-04 | Zoning review03 140023 ZPR | No description on file | Closed | |
| 2003-04-01 | Building permit01 185067 | installation of new hvac system | Closed | |
| 2001-10-17 | Building permit01 155837 | 2-4 pce bathroom on second floor 1-2 pce bathroom on first floor | Closed | |
| 2001-10-03 | Building permit01 185066 | installation of new hvac system | Cancelled | |
| 2001-06-12 | Minor varianceTE 2001 0067 | LEGALIZE 4 DWELLING UNIT HOUSE, INTERIOR & EXTERIOR ALTERATIONS, AND BRING UNITS TO O.B.C. REQUIREMENTS. | Approved with conditions | |
| 2001-04-10 | Zoning review01 035491 ZSV | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: allowed
- Garden suite: likely fits
- Secondary suite: allowed
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
Lot split (severance)
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RD (f6.0; a185; d0.75)
- Height limit
- 8.5 m
- Lot coverage limit
- 35%
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 146 m²
- Back yard
- 13.3 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 8 storeys
- In the Main Street station area
- 7 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 2 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Taylor-Massey neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Main Street StationNearest station7 min walk
- Dawes Rd at Dentonia Park AveNearest TTC stop1 min walk
- Dawes RdNearest cycling route1 min walk
- William J McCordic SchoolSchool3 min walk
- Community Life Christian SchoolSchool4 min walk
- Secord Elementary SchoolSchool6 min walk
- Danforth LincSchool11 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3788.7
- Robberycity median 69.578.3
- Auto theftcity median 192.6192.7
- Theft over $5,000city median 46.124.1
- Break and entercity median 172.8144.5
- Theft from vehiclescity median 188.1210.7
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist