HousePrecheckCheck an address

965 Glencairn AveYorkdale-Glen Park, Toronto · City records before you offer

Residential detached · RD (f9.0; a275) (x1463)10.2 × 39.4 m400 m²on Glencairn Ave

4 things to check before you offer, including 2 open orders or by-law investigations
N20 m
10.2 m frontage39.4 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 965 Glencairn Ave

965 Glencairn Ave is on a 10.2 m by 39.4 m lot on Glencairn Ave in Yorkdale-Glen Park. The zoning is RD. A site-specific exception, 900.3.10(1463), changes some of the usual rules for this address.

The City has 16 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2023, a building permit was filed: "Renovate existing ancillary building into a garden suite". Status: revocation pending. In 2021, a building permit was filed: "Revision 03 - to maintain existing rear detached garage and construct stairs to roof top terrace over garagefilling in an open area on the ground floor /…". Status: examiner's notice sent. In 2020, a Committee of Adjustment application was filed: "To legalize and maintain the existing dwelling". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection. There are 2 open orders or by-law investigations on file. Ask the seller what is outstanding and whether it will be fixed before closing.

No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 29 minor variance applications in the last 10 years and approved 90%. Glencairn station is a 12-minute walk.

Summary

What the City's records show on this house

  • 2 open orders or by-law investigationsSerious
  • Building permit open since 2023ModerateFree check
  • Work or applications in progressModerateFree check
  • Records mention garden suiteModerateFree check
  • Site-specific exception 900.3.10(1463)Moderate
  • 1 City tree in front of this lotLowFree check
  • 3 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 4 units

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

4 things to check before you offer, 1 of them serious.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Serious

Open City files

How much in the City's records needs answers before an offer

  • 2 open orders or by-law investigations
  • Building permit open since 2023
  • Work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. 2 open orders or by-law investigations

    SeriousCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Building permit open since 2023

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  4. Records mention garden suite

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  5. 3 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

16 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2023-11-17Building permit
23 196361
Renovate Existing Ancillary Building into a Garden SuiteRevocation Pending
2021-11-02Building permit
15 133565
Revision 03 - to maintain existing rear detached garage and construct stairs to roof top terrace over garageFilling in an open area on the ground floor / garage level (previously open to basement below) and adding new deck at the "first floor level", which is above the ground floor / garage level.Examiner's Notice Sent
2020-08-20Minor variance
A0223/20NY
To legalize and maintain the existing dwelling.Approved
2019-07-08Zoning review
19 184905 ZPR
No description on fileClosed
2015-09-08Building permit
15 134326
To demolish an existing one storey single family detached dwelling.Closed
2014-10-01Minor variance
A046/14NY
To construct a new two-storey detached dwelling with an integral, at grade, two car garage. The existing dwelling and detached garage would be demolished. Please be advised this application went before the Committee of Adjustment on April 30, 2014. It was the decision of the Committee to DEFER the application SINE DIE at the request of the applicant in order to revise their plans.Approved
2014-07-03Zoning review
14 184001 ZZC
No description on fileClosed
2014-05-14Zoning review
14 156891 ZPR
No description on fileClosed
2013-11-05Zoning review
13 261207 ZPR
No description on fileClosed
2013-06-10Zoning review
13 184706 ZPR
No description on fileClosed
2009-12-31Zoning review
09 200850 ZAL
No description on fileCancelled
2009-03-20By-law investigation
09 119235 PRS 00 IV
Order Issued Property Standards: Chimney, smoke stack or supporting member is not maintained in good repair and/or free from defects. Namely spalding bricks and missing mortar.Order Issued
2009-03-20By-law investigation
09 118600 PRS 00 IR
Property StandardsOrder Issued
2003-04-17Building permit
03 124848
To expand the existing detached garage in the rear.Closed
2002-12-03Minor variance
A345/02HY
To construct a one storey addition attached to the west side of the existing detached garage.Approved
2002-08-19Zoning review
02 165033 ZPR
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.3.10(1463)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.3.10(1463)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 1 City tree in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.3.10(1463)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Limited

Build potential

How much more the rules allow on this lot, beyond what is on record

  • On record: garden suite
  • Multiplex up to 4 units: likely fits
  • Secondary suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 4 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N20 m
10.2 m frontage39.4 m deepon Glencairn Ave
Zone
RD (f9.0; a275) (x1463)
Height limit
10 m
Lot coverage limit
35%
Corner lot
No
Public lane
None
New house permit
2021
House footprint
87 m²
Back yard
21.6 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

  • Multiplex up to 4 units

    Likely fits
  • Secondary suite

    Likely fits
  • Garden suite

    On record

    Already permitted: 23 196361 (revocation pending).

  • Laneway suite

    Not possible

Why, measured on this lot, and the most you could buildUnlock

Quiet

Building nearby

How much neighbours are building and applying to change within 300 m

  • 0 development applications within 300 m in 10 years, none open
  • 14 suite and multiplex permits within 300 m in 10 years
  • 29 minor variance decisions within 300 m, 90% approved

What this part means for this house, in plain EnglishUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime well above median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 1 of 8 categories
  • Theft over $5,000: 6.0 times the Toronto median
  • Shootings: 2.7 times the Toronto median
  • Auto theft: 2.6 times the Toronto median
  • Robbery: 2.1 times the Toronto median
  • Break and enter: 2.0 times the Toronto median
  • Theft from vehicles: 1.9 times the Toronto median
  • Assault: 1.9 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Yorkdale-Glen Park neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$79,000median $84,500
Households that own their home54%median 54%
Population (2021)16,625median 16,813
Homes built in 1960 or before27%median 29%
Homes needing major repairs8%median 7%

Getting around and schools

  • Glencairn StationNearest station12 min walk
  • Glencairn Ave at Capitol AveNearest TTC stop1 min walk
  • Marlee AveNearest cycling route9 min walk
  • Sts Cosmas and Damian Catholic Elementary SchoolSchool8 min walk
  • Fieldstone Day SchoolSchool9 min walk
  • Fieldstone King's College Secondary SchoolSchool9 min walk
  • St Charles Catholic Elementary SchoolSchool11 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.31212.6
  • Robberycity median 69.5146.8
  • Homicidecity median 5.34.7
  • Shootingscity median 10.528.4
  • Auto theftcity median 192.6492.6
  • Theft over $5,000city median 46.1274.7
  • Break and entercity median 172.8341.1
  • Theft from vehiclescity median 188.1360

More about Yorkdale-Glen Park

Ready emails

Copy and send as they are.

8 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 965 Glencairn Ave

4 things to check at 965 Glencairn Ave before you offer

  • 2 open orders or by-law investigationsSerious
  • Building permit open since 2023Moderate
  • Work or applications in progressModerate
  • Records mention garden suiteModerate
  • and 3 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 7 steps to take before you offer, so nothing slips
  • What each of the 7 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.