Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 96 Gerrard St E
96 Gerrard St E is on a 54.5 m by 85.3 m lot on Gerrard St E in Downtown Yonge East. The zoning is R. A site-specific exception, 900.2.10(7), changes some of the usual rules for this address. The lot also fronts Mutual St.
The City has 20 records on this lot since 1990. That is more than at 99% of Toronto houses. In 2022, a building permit was filed: "Plumbing - proposal to convert existing office to a new restaurant, new kitchen exhaust and make-up air". Status: closed. In 2021, a building permit was filed: "New fire pumps to replace existing, new backflow preventer with bypass and meter; tandem pressure reducing valves; pump feed to the fsp system with new header…". Status: inspection. In 2019, a building permit was filed: "Proposed underground vault room concrete repairs adjacent to an existing apartment building". Status: permit issued. 4 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 6 development applications are open (the tallest up to 60 storeys). College station is a 7-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 4 building permits open, the oldest since 2017ModerateFree check
- Work or applications in progressModerateFree check
- Site-specific exception 900.2.10(7)Moderate
- 3 by-law investigations closed in the last two yearsLow
- No permit for a second unit on fileLowFree check
- 6 development applications open within 300 mLowFree check
- Site and Area Specific Policy 151Low
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 4 building permits open, the oldest since 2017
- Work or applications in progress
- 3 by-law investigations closed in the last two years
What this part means for this house, in plain EnglishUnlock
4 building permits open, the oldest since 2017
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
3 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buying
City files on this lot
20 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-06-22 | By-law investigation26 189435 PRS 00 IR | Property Standards | Closed | |
| 2026-05-10 | By-law investigation26 158050 GRA 00 IR | Graffiti | Notice Issued | |
| 2025-10-13 | By-law investigation25 238984 PRS 00 IR | Property Standards | Closed | |
| 2025-01-22 | By-law investigation25 107527 HEA 00 IR | Adequate Heat | Closed | |
| 2022-05-18 | Building permit22 133881 | Plumbing - Proposal to convert existing office to a new restaurant, new kitchen exhaust and make-up air. | Closed | |
| 2021-02-04 | Building permit21 104931 | New fire pumps to replace existing, new backflow preventer with bypass and meter; tandem pressure reducing valves; pump feed to the FSP system with new header, valves and riser; the city supply to the four sprinkler systems with new common header, valves and risers; and now common or combined FDC with the new check valve and the new combined FDC and Pump Test exterior wall bodies with new label wall plates. | Inspection | |
| 2019-03-27 | Building permit19 121950 | Proposed underground vault room concrete repairs adjacent to an existing apartment building. | Permit Issued | |
| 2019-02-12 | Building permit19 104363 | Proposed upgrade to existing fire alarm system in student residence and hotel | Inspection | |
| 2017-09-08 | Building permit17 211509 | Relpacement of existing deisel generators with a new generator for existing apartment building. | Permit Issued | |
| 2016-12-29 | Development application16 271639 STE 27 OZ | Proposal for a 10-storey building fronting onto Jarvis Street connected to a 25-storey tower fronting onto Mutual Street. A total of 256 residential units are proposed. There are existing heritage buildings on site that are proposed to be shifted and inetgrated into the proposal. | OMB Approved | |
| 2012-05-18 | Building permit12 174515 | Permit to replace all existing hot, cold and recirculation pipings to existing co-op building.- 22 stories. | Closed | |
| 2011-01-05 | Building permit10 319482 | Proposal to install 1 backflow prevention device in an existing multi use building. | Closed | |
| 2009-11-17 | Zoning review09 188719 LTO | No description on file | Closed | |
| 2009-04-09 | Building permit09 119840 | Proposal for the installation of a new fire alrm panel to replace existing. The construction will take place on the basement, ground floor thru to 5th floor, 8th floor, 11th floor, 14th floor, 17th floor, 20th floor and the penthouse. | Closed | |
| 2008-01-18 | Zoning review08 104221 LTO | No description on file | Closed | |
| 2006-02-01 | Zoning review06 106398 LTO | No description on file | Closed | |
| 2005-03-07 | Zoning review05 113519 LTO | No description on file | Closed | |
| 2002-04-19 | Zoning review02 128460 LTO | No description on file | Closed | |
| 1998-05-15 | Building permit98 016348 | SUPPLY AND INSTAL H.V.A.C. SYSTEM AND ALL REALATIVE DUCTWORK IN RESIDENTIAL PORTION OF 1ST FLOOR. FEE $175.00 | Closed | |
| 1990-01-10 | Zoning review90 028070 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(7)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(7)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 151
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(7)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: likely fits
- Secondary suite: likely fits
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d2.0) (x7)
- Height limit
- 13 m
- Corner lot
- Yes, also on Mutual St
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 902 m²
- Back yard
- 1.3 m
- Buildings on the lot
- 5
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 6 development applications open within 300 m, up to 60 storeys
- In the Wellesley station area
- 3 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
6 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Assault: 3.7 times the Toronto median
- Theft over $5,000: 2.2 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
- Robbery: 2.1 times the Toronto median
- Break and enter: 1.6 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Downtown Yonge East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- College StationNearest station7 min walk
- Carlton St at Church StNearest TTC stop3 min walk
- Gerrard St ENearest cycling route1 min walk
- Taie International Institute SchoolSchool3 min walk
- Toronto Metropolitan University - Theatre SchoolSchool3 min walk
- Le College Francais - Carlton CampusSchool4 min walk
- National Ballet School - Margaret McCain Acedemic CentreSchool5 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32360.8
- Robberycity median 69.5143.3
- Shootingscity median 10.511.9
- Auto theftcity median 192.675.6
- Theft over $5,000city median 46.199.5
- Break and entercity median 172.8274.7
- Theft from vehiclescity median 188.1390.1
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist