HousePrecheckCheck an address

901 Sheppard Ave WClanton Park, Toronto · City records before you offer

≈ 54.9 × 96.8 m3,263 m²on Sheppard Ave Wcorner, also on Wilson Heights Blvd

2 things to check before you offer, including building permit open since 2020
N20 m
≈ 54.9 m frontage≈ 96.8 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 901 Sheppard Ave W

901 Sheppard Ave W is on a 54.9 m by 96.8 m lot on Sheppard Ave W in Clanton Park. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Wilson Heights Blvd.

The City has 17 records on this lot since 1998. That is more than at 99% of Toronto houses. In 2022, a building permit was filed: "To erect and display two first party illuminated wall signs, displaying static copy.dimensions: 1.74m l x 3.66m w x 0.2m d at the height of 5.60m.****valvoline…". Status: closed. In 2021, a building permit was filed: "To erect and display two illuminated ground signs.***tim horton's***". Status: closed. In 2020, a building permit was filed: "To erect two illuminated wall signs and four wall signs, displaying first party static copy. two overhanging signs are erected on the canopy structure and four…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 1 development application is open. Within 300 m, the Committee of Adjustment decided 14 minor variance applications in the last 10 years and approved 93%. Opposite 1042 Sheppard Ave West- Sheppard West station is a 6-minute walk.

Summary

What the City's records show on this house

  • Building permit open since 2020ModerateFree check
  • Zoning not in By-law 569-2013Moderate
  • 1 development application open within 300 mLowFree check
  • 6 City trees in front of this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2020
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2020

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

17 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2022-02-09Building permit
21 231454
To erect and display two first party illuminated wall signs, displaying static copy.Dimensions: 1.74m L x 3.66m W x 0.2m D at the height of 5.60m.****VALVOLINE GREAT CANADIAN OIL CHANGE***Closed
2021-06-28Building permit
21 169907
To erect and display two illuminated ground signs.***TIM HORTON'S***Closed
2021-04-01Zoning review
21 135197 ZSV
No description on fileClosed
2020-08-12Building permit
20 171875
To erect two illuminated wall signs and four wall signs, displaying first party static copy. Two overhanging signs are erected on the canopy structure and four wall signs on North elevation of onsite builsing.****PETRO CANADA****Closed
2020-07-07Building permit
20 144587
Removing the existing canopy top and replacing it. The existing columns to remain. Petro CanadaClosed
2020-06-16Building permit
20 149067
Petro-Canada - C-Store - Interior and exterior alterations. Exterior alterations consist of -Remove existing ACM panels on the West (store front), South and North elev.'s. -existing garbage enclosure to be removed and new ACM panels -new ACM panels will reduce the bldg footprint by approx. 175+/-.-Add new spandrel panels over the existing glazing and store front door - Canopy replacement which is a separate permit.Inspection
2015-12-02Building permit
15 249563
Proposal to install a backflow prevention device in an existing auto garage - "Oil Changers"Closed
2015-10-27Building permit
15 233727
HVAC - Construct interior alterations for Tim Horton's inside the Esso Gas StationClosed
2015-10-21Building permit
15 240611
To erect and display two illuminated wall signs.**TIM HORTON'S**Cancelled
2013-12-13Zoning review
13 277777 ZPR
No description on fileClosed
2012-12-17Building permit
12 253508
To erect and display two ground signs associated with a drive-through facility, in conjunction with a coffee shop. **Tim Hortons**Closed
2011-07-27Zoning review
11 246616 ZPR
No description on fileClosed
2010-11-22Building permit
10 292949
Install one new Backflow Prevention DevicesClosed - Dormant
2009-09-04Building permit
09 154784
Plumbing - Int alt to tim horton'sClosed - Dormant
2005-08-15Zoning review
05 170680 ZPU
No description on fileCancelled
2003-07-25Zoning review
03 160551 LTO
No description on fileClosed
1998-11-13Building permit
98 089228
EXTEND CANOPYClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Zoning not in By-law 569-2013
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 6 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
≈ 54.9 m frontage≈ 96.8 m deepon Sheppard Ave W
Zone
—
Height limit
—
Corner lot
Yes, also on Wilson Heights Blvd
Public lane
None
House footprint
271 m²
Back yard
48.6 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Some

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 1 development application open within 300 m
    • 4 suite and multiplex permits within 300 m in 10 years
    • 14 minor variance decisions within 300 m, 93% approved

    What this part means for this house, in plain EnglishUnlock

    1. 1 development application open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime near median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 4 of 7 categories
    • Theft over $5,000: 2.0 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Clanton Park neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$88,000median $84,500
    Households that own their home54%median 54%
    Population (2021)17,620median 16,813
    Homes built in 1960 or before25%median 29%
    Homes needing major repairs5%median 7%

    Getting around and schools

    • Opposite 1042 Sheppard Ave West- Sheppard West StationNearest station6 min walk
    • Sheppard Ave West at Wilson Heights BlvdNearest TTC stop1 min walk
    • Wilmington AveNearest cycling route7 min walk
    • William Lyon Mackenzie Collegiate InstituteSchool8 min walk
    • The Toronto Heschel SchoolSchool8 min walk
    • Dublin Heights Elementary & Mdl SchoolSchool13 min walk
    • Yeshiva Or Chaim Bnei Akiva Boys SchoolSchool15 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3584.1
    • Robberycity median 69.595
    • Shootingscity median 10.54.7
    • Auto theftcity median 192.6185.2
    • Theft over $5,000city median 46.190.2
    • Break and entercity median 172.8133
    • Theft from vehiclescity median 188.1194.7

    More about Clanton Park

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 901 Sheppard Ave W

    2 things to check at 901 Sheppard Ave W before you offer

    • Building permit open since 2020Moderate
    • Zoning not in By-law 569-2013Moderate
    • 1 development application open within 300 mLow
    • 6 City trees in front of this lotLow

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 6 steps to take before you offer, so nothing slips
    • What each of the 4 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.