Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 9 Raglan Ave
9 Raglan Ave is on a 6.8 m by 37.8 m lot on Raglan Ave in Humewood-Cedarvale. The zoning is RA. A site-specific exception, 900.7.10(777), changes some of the usual rules for this address.
The City has 4 records on this lot since 2015. That is more than at 88% of Toronto houses. In 2021, a development application was filed: "*** draft plan of condominium for 170 units.there is a olt approved zoning by-law amendment application. there is a concurrent site plan control application…". Status: under review. In 2021, a development application was filed: "Draft by-law amendment application to facilitate the redevelopment of the sites for a 28-storey residential building having a gross floor area of 15407.2…". Status: closed. In 2021, a development application was filed: "Site plan approval application to facilitate the redevelopment of the sites for a 28-storey residential building having a gross floor area of 15407.2 square…". Status: noac issued. Nothing on file is open right now.
Within 300 m, 16 development applications are open (the tallest up to 40 storeys). St Clair West station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.7.10(777)Moderate
- 16 development applications open within 300 mLowFree check
- Site and Area Specific Policy 038Low
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
4 records on file, more than at 88% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2021-11-01 | Development application21 232987 STE 12 CD | *** Draft Plan of Condominium for 170 units.There is a OLT approved Zoning By-law Amendment application. There is a concurrent Site Plan Control application which is currently under review. | Under Review | |
| 2021-11-01 | Development application21 232980 STE 12 OZ | Draft By-law Amendment application to facilitate the redevelopment of the sites for a 28-storey residential building having a gross floor area of 15407.2 square metres. A total of 210 dwelling units are proposed. | Closed | |
| 2021-11-01 | Development application21 232984 STE 12 SA | Site plan Approval application to facilitate the redevelopment of the sites for a 28-storey residential building having a gross floor area of 15407.2 square metres. A total of 210 dwelling units are proposed. | NOAC Issued | |
| 2015-03-09 | Development application15 125200 STE 21 OZ | St Clair Ave W and Bathurst Street Area Planning Framework Study - On January 30, 2019 City Council requested the Chief Planner and Executive Director, City Planning, to modify the Official Plan Policy review for the Raglan Avenue/Vaughan Road area (initiated in a staff report dated May 27, 2015 and adopted by City Council on July 27, 2015), by expanding the study boundary and focusing on built form, land use, and community services. | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.7.10(777)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.7.10(777)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 038
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.7.10(777)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- RA (x777)
- Height limit
- 24 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 92 m²
- Back yard
- 15.2 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 16 development applications open within 300 m, up to 40 storeys
- In the St Clair West station area
- 9 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
16 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Humewood-Cedarvale neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St Clair West StationNearest station5 min walk
- St Clair Ave West at Bathurst St West SideNearest TTC stop1 min walk
- Vaughan RdNearest cycling route2 min walk
- St Michael's College SchoolSchool3 min walk
- Holy Rosary Catholic Elementary SchoolSchool7 min walk
- Hillcrest Community SchoolSchool9 min walk
- Humewood Community SchoolSchool13 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3471.6
- Robberycity median 69.542.3
- Shootingscity median 10.512.1
- Auto theftcity median 192.6133
- Theft over $5,000city median 46.118.1
- Break and entercity median 172.8211.6
- Theft from vehiclescity median 188.1108.8
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist