Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 9 Barberry Pl
9 Barberry Pl is on a 43.5 m by 40.8 m lot on Barberry Pl in Bayview Village. The zoning is RD. A site-specific exception, 900.3.10(5), changes some of the usual rules for this address. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 8 records on this lot since 2012. That is more than at 98% of Toronto houses. In 2020, a development application was filed: "Official plan and zoning by law amendment application that proposes to build a new 14 storey mixed use building, with retail and residential uses. the…". Status: under review. In 2018, a development application was filed: "Draft plan of condominium containing 209 units (201 residential and 8 commercial)". Status: closed. In 2012, a development application was filed: "Revised application proposes a mixed use development with building height of 6 to 10 storeys containing 186 dwelling units, 1,676 square metres of grade…". Status: closed. There are 2 open orders or by-law investigations on file. Ask the seller what is outstanding and whether it will be fixed before closing.
Within 300 m, 5 development applications are open (the tallest up to 56 storeys). Within 300 m, the Committee of Adjustment decided 6 minor variance applications in the last 10 years and approved 100%. Bayview station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 2 open orders or by-law investigationsSerious
- Heritage property: designated (Part IV)Moderate
- Work or applications in progressModerateFree check
- Site-specific exception 900.3.10(5)Moderate
- No permit for a second unit on fileLowFree check
- The back yard may be too tight for a garden suiteLowFree check
- 5 development applications open within 300 mLowFree check
- Sheppard East Subway Corridor Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units · Lot split (severance)
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer, 1 of them serious.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 open orders or by-law investigations
- Work or applications in progress
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
2 open orders or by-law investigations
SeriousCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buying
City files on this lot
8 records on file, more than at 98% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-08-17 | By-law investigation26 221246 PRS 00 IV | Order Issued Property Standards: The property is not being kept free of conditions which may encourage infestation.; The property is not being kept free of pests. | Order Issued | |
| 2026-08-17 | By-law investigation26 221172 PRS 00 IR | Property Standards | Order Issued | |
| 2026-06-29 | By-law investigation26 193515 LGW 00 IR | Long Grass and Weeds | Closed | |
| 2025-10-20 | By-law investigation25 242396 LGW 00 IR | Long Grass and Weeds | Closed | |
| 2020-12-23 | Development application20 233673 NNY 17 OZ | Official Plan and Zoning By Law Amendment application that proposes to build a new 14 storey mixed use building, with retail and residential uses. The development will have Gross floor area of 15,096 square metres. The relocation of the Thomas Clark House (heritage building) to the northwest corner of the development site is also proposed. | Under Review | |
| 2018-11-27 | Development application18 261450 NNY 24 CD | Draft Plan of Condominium containing 209 units (201 residential and 8 commercial) | Closed | |
| 2012-12-28 | Development application12 298398 NNY 24 OZ | Revised application proposes a mixed use development with building height of 6 to 10 storeys containing 186 dwelling units, 1,676 square metres of grade related retail space and second floor office space and 265 parking spaces in three levels of underground parking. The application also proposes a replacement place of worship building having a gross floor area of 1,279 square metres. The proposal yields a net density (excluding the place of worship and indoor amenity space) of 3.7 FSI. | Closed | |
| 2012-12-28 | Development application12 298406 NNY 24 SA | Revised Site Plan application proposes a mixed use building with a building height of 6 to 10 storeys containing 186 units, 1,676 square metres of grade related retail space and second floor offices and 265 parking spaces in three levels of underground parking. The development also includes a replacement place of worship building with a gross floor area of 1,279 square metres. An application to amend the Official Plan and Zoning By-law has also been submitted (File No. 12 298398 NNY 24 OZ). | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Site-specific exception 900.3.10(5)
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.3.10(5)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Sheppard East Subway Corridor Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage Register
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.3.10(5)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 4 units: likely fits
- Garden suite: needs a closer look
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
The back yard may be too tight for a garden suite
LowCheck if it appliesSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Lot split (severance)
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RD (f15.0; a550) (x5)
- Height limit
- 10 m
- Lot coverage limit
- 30%
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 276 m²
- Back yard
- 18.6 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 5 development applications open within 300 m, up to 56 storeys
- In the Bayview station area
- 6 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
5 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Bayview Village neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Bayview StationNearest station5 min walk
- Sheppard Ave East at Barberry PlNearest TTC stop1 min walk
- Sheppard Ave ENearest cycling route8 min walk
- St George AcademySchool1 min walk
- North York LincSchool8 min walk
- St Gabriel Catholic Elementary SchoolSchool9 min walk
- Elkhorn Public SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3439.5
- Robberycity median 69.556.6
- Auto theftcity median 192.6139.8
- Theft over $5,000city median 46.149.9
- Break and entercity median 172.8176.4
- Theft from vehiclescity median 188.1169.8
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist