Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 895 Jane St
895 Jane St is on a 38.1 m by 53.1 m lot on Jane St in Rockcliffe-Smythe. The zoning is CR. The lot also fronts Dalrymple Dr. 100% of the lot is in the area TRCA regulates for flooding and erosion. Building or grading in that part usually needs a TRCA permit.
The City has 11 records on this lot since 2006. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "2 ground sign". Status: permit issued. In 2020, a building permit was filed: "The proposal contains two illuminated electronic ground signs, displaying electronic static copy associated with the "tim horton's" drive-through facility. one…". Status: closed. In 2019, a building permit was filed: "To erect and display one illuminated wall signs measuring 5.34 meters horizontally by 1.07 meters vertically at the height of 4.74 meters from the grade on…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 7 minor variance applications in the last 10 years and approved 86%. The nearest TTC stop is Jane St at Alliance Ave, a 1-minute walk.
Summary
What the City's records show on this house
- TRCA regulated area (100% of lot)ModerateFree check
- Work or applications in progressModerateFree check
- 1 by-law investigation closed in the last two yearsLow
- 3 City trees in front of this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- 1 by-law investigation closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
11 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-04-28 | Building permit26 147514 | 2 Ground Sign | Permit Issued | |
| 2026-01-29 | Zoning review26 110532 ZSV | No description on file | Re-Examined | |
| 2025-05-26 | By-law investigation25 165486 PRS 00 IR | Property Standards | Closed | |
| 2020-07-03 | Building permit19 226163 | The proposal contains two illuminated electronic ground signs, displaying electronic static copy associated with the "Tim Horton's" drive-through facility. One sign is 1.07 m x 0.63m at a height of 1.84m and the other sign is 1.07m x 1.88m at a height of 1.84m. ****TIM HORTON'S**** | Closed | |
| 2020-01-10 | Zoning review20 103261 ZSV | No description on file | Closed | |
| 2019-12-24 | Building permit19 227729 | To erect and display one illuminated wall signs measuring 5.34 meters horizontally by 1.07 meters vertically at the height of 4.74 meters from the grade on west elevation.****TIM HORTON'S**** | Closed | |
| 2019-08-02 | Building permit19 176998 | HVAC - Proposal for interior and exterior alteration to an existing Tim Hortons restaurant. Work to include new equipment, furnature, interior and exterior finishes. | Closed | |
| 2013-11-01 | Building permit13 249076 | To erect and display two illuminated, directional ground signs for a drive-thru coffee shop. **Tim Hortons** | Closed | |
| 2009-11-12 | Building permit09 176135 | interior renovations to existing Tim Horton's | Closed | |
| 2007-01-30 | Zoning review07 105720 ZPR | No description on file | Closed | |
| 2006-06-16 | Zoning review06 147531 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
3 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- TRCA regulated area (100% of lot)
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
TRCA regulated area (100% of lot)
ModerateCheck before you offerSee the ravine lot check for this house
What the record shows, what it means for you and what to doUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 2.0 (c2.0; r2.0) SS2
- Height limit
- 15 m
- Corner lot
- Yes, also on Dalrymple Dr
- Public lane
- None
- House footprint
- 262 m²
- Back yard
- 18.9 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- 1 suite and multiplex permits within 300 m in 10 years
- 7 minor variance decisions within 300 m, 86% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 7 categories
- Shootings: 1.6 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Rockcliffe-Smythe neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Mount Dennis StationNearest station23 min walk
- Jane St at Alliance AveNearest TTC stop1 min walk
- Black Creek TrlNearest cycling route2 min walk
- The Haney Centre SchoolSchool9 min walk
- Roselands Jr Public SchoolSchool9 min walk
- Frank Oke Secondary SchoolSchool9 min walk
- Rockcliffe Mdl SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3742.7
- Robberycity median 69.574.7
- Shootingscity median 10.516.6
- Auto theftcity median 192.6157.7
- Theft over $5,000city median 46.137.3
- Break and entercity median 172.8132.8
- Theft from vehiclescity median 188.1224
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist