Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 890 Yonge St
890 Yonge St is on a 26.7 m by 38.8 m lot on Yonge St in Annex. The zoning is CR. A site-specific exception, 900.11.10(2403), changes some of the usual rules for this address.
The City has 33 records on this lot since 1985. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Proposed interior alterations/lobby renovation to the ground floor office space". Status: closed. In 2024, a building permit was filed: "Interior alterations - office renovation, 11th floor". Status: closed. In 2023, a building permit was filed: "Proposal for interior alterations to this existing office suite 601, located on the 6th floor level for a new medical clinic tenant - 'dr. alex ritza toronto…". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 15 development applications are open (the tallest up to 75 storeys). Within 300 m, the Committee of Adjustment decided 29 minor variance applications in the last 10 years and approved 97%. Yonge station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 2 building permits open, the oldest since 2014ModerateFree check
- Site-specific exception 900.11.10(2403)Moderate
- 15 development applications open within 300 mLowFree check
- Priority retail street: Yonge StreetLow
- Site and Area Specific Policy 211, 225Low
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 building permits open, the oldest since 2014
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
2 building permits open, the oldest since 2014
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
33 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-02-21 | Building permit25 117547 | Proposed interior alterations/lobby renovation to the ground floor office space. | Closed | |
| 2024-08-22 | Building permit24 196801 | Interior alterations - office renovation, 11th floor | Closed | |
| 2023-01-17 | Building permit22 243368 | Proposal for interior alterations to this existing office suite 601, located on the 6th floor level for a new medical clinic tenant - 'Dr. Alex Ritza Toronto Office - Chiropractor'. Work to include construction of new partition, replace door hardware, basic finishes. | Closed | |
| 2021-07-30 | Building permit21 184371 | Interior demolition of partitions, construction of new partition, relocating light fixtures. new plumbing for kitchen, millwork and basic finishes - for 9th and 10th floor | Closed | |
| 2018-11-20 | Building permit18 240768 | Proposal for interior alterations to existing office unit. | Closed | |
| 2018-08-02 | Building permit18 201665 | Proposal to install 1 mag lock on the 8th floor of existing office space in connection to 18 129349 BLD. | Closed | |
| 2018-04-13 | Building permit18 129349 | Interior alterations to existing office on the 8th floor. | Closed | |
| 2017-11-17 | Building permit17 252435 | Proposal for interior alterations to existing office suite 1001 | Closed | |
| 2017-05-24 | Building permit17 150367 | Premise isolation backflow preventor installation | Closed | |
| 2017-05-16 | Building permit17 157983 | In conjunction with a multi-storey building on the premises with retail on the first storey, proposal to erect and display two non-illuminated overhanging structure signs displaying static copy on the first and second storey of the east elevation. One of the proposed sign is 2.61 metres vertically by 4.3 metres horizontally and the other proposed sign is 2.61 metres vertically by 5.68 metres horizontally, both at a height of 6.04 metres above grade.**MARY TRIPI** | Cancelled | |
| 2017-03-16 | Zoning review17 129975 ZPR | No description on file | Closed | |
| 2016-09-07 | Building permit16 215518 | Interior alterations to existing office space on the 2nd floor. Suite 200. | Closed | |
| 2016-08-08 | Building permit16 202867 | Interior alterations for tenant fit up (97.01m2) | Cancelled | |
| 2016-05-20 | Building permit15 215961 | REV 01 - to existing automated smoke exhaust to manual operation | Closed | |
| 2015-11-10 | Building permit15 244059 | Proposal for interior alterations to unit 1001 in existing office - tenant is "Adler" | Closed | |
| 2015-09-18 | Zoning review15 224865 LTO | No description on file | Closed | |
| 2014-12-01 | Building permit14 256899 | Interior alterations to existing office space on the 7th floor. Tenant - "Greybrook Capital Offices". | Inspection | |
| 2014-09-30 | Building permit14 222596 | Proposal to construct interior alterations in suite 402 in the existing office building. | Inspection | |
| 2013-06-19 | Building permit12 294911 | HVAC - Proposal for interior alterations to existing vacant space to convert to Hair Salon on ground floor of existing building Unit 101 "The Private World of Mary Tripi" (250.8m2) | Closed | |
| 2013-06-04 | Building permit13 170782 | Proposal for interior alterations to the 5th and 11th floors of existing office space within the building for the same purposes.(130.4m2). | Closed | |
| 2011-11-24 | Zoning review11 315066 LTO | No description on file | Closed | |
| 2010-12-09 | Building permit10 294238 | This is for interior alterations to create a new dentist office on the ground floor. This proposal includes plumbing and HVAC. | Closed | |
| 2009-04-20 | Zoning review09 127634 LPR | No description on file | Closed | |
| 2009-03-13 | Zoning review09 116846 ZPU | No description on file | Closed | |
| 2004-04-30 | Building permit04 128747 | Install partitions on portion of the 9th floor office. Tenant: Director's Guild Existing & Proposed Use: Office, Restaurant, Retail Store, Personal Grooming Est. & Apt. Bldg. | Closed | |
| 2002-11-21 | Building permit02 190817 | install 4 mag locks and 3 electric strikes in ground floor, one mag lock in 2nd floor, 1 mag lock in P1, 1mag lock in P2 level. | Closed | |
| 1998-07-20 | Building permit98 018785 | RELOCATE PLUMBING FIX. ON 9TH FL: 1 KIT. SINK REFER TO APPLICATION NUMBER: 414377 | Closed - Dormant | |
| 1997-02-07 | Building permit97 013077 | INSTALL NEW FIXTURES ON 5TH FLOOR:9 DENTAL SINKS, 2 1 1\2 VENT TRAPS. BP COST INCL: 394504 | Closed - Dormant | |
| 1993-01-04 | Zoning review93 024589 LTO | No description on file | Closed | |
| 1991-04-29 | Zoning review91 026398 LTO | No description on file | Closed | |
| 1987-08-11 | Zoning review87 030355 LTO | No description on file | Closed | |
| 1986-10-22 | Zoning review86 028452 LTO | No description on file | Closed | |
| 1985-11-12 | Zoning review85 027037 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2403)
- Priority retail street: Yonge Street
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2403)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Yonge Street
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 211, 225
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2403)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.0 (c1.75; r4.0) SS1 (x2403)
- Height limit
- 30 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 339 m²
- Back yard
- 5.7 m
- Buildings on the lot
- 6
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 15 development applications open within 300 m, up to 75 storeys
- In the Rosedale station area
- 29 minor variance decisions within 300 m, 97% approved
What this part means for this house, in plain EnglishUnlock
15 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Theft over $5,000: 2.5 times the Toronto median
- Break and enter: 2.2 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Annex neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Yonge StationNearest station5 min walk
- Yonge St at Davenport RdNearest TTC stop1 min walk
- Yonge StNearest cycling route1 min walk
- McDonald International Academy SchoolSchool2 min walk
- Jesse Ketchum Jr & Sr Public SchoolSchool5 min walk
- Career Quest - TorontoSchool8 min walk
- Humber College - International Graduate SchoolSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.9
- Robberycity median 69.580.5
- Homicidecity median 5.35.2
- Shootingscity median 10.55.2
- Auto theftcity median 192.6116.9
- Theft over $5,000city median 46.1114.3
- Break and entercity median 172.8387.1
- Theft from vehiclescity median 188.1220.9
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist