Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 87 Front St E
87 Front St E is on a 10.6 m by 27 m lot on Front St E in St Lawrence-East Bayfront-The Islands. The zoning is CR. A site-specific exception, 900.11.10(2109), changes some of the usual rules for this address. The lot also fronts Market St. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 18 records on this lot since 2008. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Proposal for interior renovation to the 2nd floor office suite. renovation of the existing washrooms on 2nd and third floors. enlarging office on 4th floor". Status: closed. In 2023, a building permit was filed: "Masonry wall repairs". Status: permit issued. In 2022, a building permit was filed: "Proposal for interior alterations to a portion of the existing 4th floor level for office tenant - 'dilawri'". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 4 development applications are open (the tallest up to 46 storeys). Within 300 m, the Committee of Adjustment decided 6 minor variance applications in the last 10 years and approved 100%. King station is a 7-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2023ModerateFree check
- Heritage property: designated (Part IV)Moderate
- Site-specific exception 900.11.10(2109)Moderate
- 4 development applications open within 300 mLowFree check
- Priority retail street: Front Street East, Market StreetLow
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2023
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
Building permit open since 2023
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
18 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-02-07 | Building permit24 253917 | Proposal for interior renovation to the 2nd floor office suite. Renovation of the existing washrooms on 2nd and third floors. Enlarging office on 4th floor. | Closed | |
| 2023-11-27 | Building permit23 219417 | Masonry Wall Repairs | Permit Issued | |
| 2022-12-20 | Building permit22 234300 | Proposal for interior alterations to a portion of the existing 4th floor level for office tenant - 'Dilawri'. | Closed | |
| 2017-05-05 | Building permit17 149688 | Interior alterations to existing office on the third and forth floor. Tenant: Dilawri Executive Offices. | Closed | |
| 2017-01-11 | Building permit16 261714 | Proposal to convert an existing retail unit to a restaurant, less than 30 seats - Unit 8, "Bar Cru". Patio on city property.Convenience address is 20 Market St. | Closed | |
| 2016-10-12 | Zoning review16 235963 LPR | No description on file | Closed | |
| 2015-12-03 | Building permit15 252154 | Proposal to install a bi-fold door into a masonry wall of an existing mixed use, non res building. | Cancelled | |
| 2014-02-04 | Building permit10 174522 | REVISION 4- Alterations to building to allow for revised duct work. | Closed | |
| 2013-12-04 | Building permit13 264713 | To erect and display one non-illuminated wall sign. **LCBO** | Closed | |
| 2013-11-29 | Zoning review13 271922 LTO | No description on file | Closed | |
| 2013-10-17 | Building permit13 236411 | proposal for 3 maglocks on the ground floor (retail) of existing mixed-use (non-res) building | Closed | |
| 2013-08-26 | Building permit13 221191 | Proposal for interior alterations to base building for restaurant >30 seats (84 seats) on the lower level of building with address 26 Market Street | Closed | |
| 2012-12-07 | Building permit12 280599 | To erect and display, all non-illuminated static copy, three signs at the northerly elevationand one sign at the easterly elevation, in conjunction with an existing LCBO store operating on the premises. **LCBO** | Closed | |
| 2012-04-19 | Building permit12 149373 | Proposal for interior alterations for retail unit for "LCBO" (1146m2). | Closed | |
| 2011-10-06 | Building permit11 285840 | Interior alterations to existing office space on the 3rd floor. | Closed | |
| 2010-09-01 | Building permit10 243305 | Proposal for interior alterations to existing office space on the 4th floor. Tenant is "Covington Capital Corporation". | Closed | |
| 2009-06-11 | Zoning review09 148786 ZAL | No description on file | Cancelled | |
| 2008-01-11 | Building permit07 289469 | interior alterations to existing office space - floor 2 - suite 200 - ECU Silver Mining Inc | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Site-specific exception 900.11.10(2109)
- Priority retail street: Front Street East, Market Street
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(2109)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Front Street East, Market Street
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2109)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.0 (c3.0; r4.0) SS1 (x2109)
- Height limit
- 23 m
- Corner lot
- Yes, also on Market St
- Public lane
- None
- House footprint
- 252 m²
- Back yard
- 0.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 4 development applications open within 300 m, up to 46 storeys
- In the King station area
- 6 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
4 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 7 categories
- Theft over $5,000: 1.7 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
St Lawrence-East Bayfront-The Islands neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- King StationNearest station7 min walk
- The Esplanade at Lower Jarvis StNearest TTC stop2 min walk
- The EsplanadeNearest cycling route1 min walk
- Downtown Alternative SchoolSchool3 min walk
- St Michael Catholic Elementary School - Bldg 1School4 min walk
- George Brown College - St James CampusSchool5 min walk
- Keystone International SchoolsSchool6 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31059.7
- Robberycity median 69.596.3
- Shootingscity median 10.54.5
- Auto theftcity median 192.624.6
- Theft over $5,000city median 46.178.4
- Break and entercity median 172.8163.5
- Theft from vehiclescity median 188.1163.5
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist