HousePrecheckCheck an address

86 Soudan AveToronto · zoning, lot size and permit records

Open space · O≈ 35.1 × 45.7 m1,140 m²on Dunfield Avecorner, also on Soudan Ave

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 23 158635 (Construction of a new public park which includes a splash pad that requires a STS Permit, 2023, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 12 development applications open within 300 m, up to 70 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: EglintonThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 35.1 m frontage≈ 45.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2023

    Needs a closer look

    Still open in the City's records: 23 158635 (Construction of a new public park which includes a splash pad that requires a STS Permit, 2023, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 70 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit23 158635Inspection

    Construction of a new public park which includes a splash pad that requires a STS Permit.

    Jun 23, 2023 · 86 SOUDAN AVE
  • Development application20 108364 STE 12 CDClosed

    Draft Plan of Standard Condominium to permit 545 residential units and 4 guest suites, within two new residential towers (Tower H: 27-storeys, 236 residential units, 2 guest suites; Tower D: 34-Storeys, 309 residential units, 2 guest suites), with a 3-level shared below-grade garage, on a lot retained through the severance of two lots occupied by two existing apartment buildings.

    Jan 24, 2020 · 88 SOUDAN AVE · City file
  • Building permit18 123493Closeddemolition

    Proposal to demolish existing dwelling in accordance with council decision MM 41.37 , May 22, 2018. These lands will be conveyed to the City at a future date for public parkland purposes.

    Oct 27, 2018 · 86 SOUDAN AVE
  • Development application17 144152 STE 22 SAClosed

    Site Plan Approval application to permit redevelopment of the site, including retention of the two existing rental apartment buildings and construction of two new residential buildings (27 and 34 storeys, with a total 545 new dwelling units). Approximately 42,916 square metres of new residential gross floor area is proposed.

    Apr 13, 2017 · 88 SOUDAN AVE · City file
  • Development application13 211324 STE 22 OZClosed

    Application to permit new 27 and 34 storey residential towers, on a site with two existing 14 storey rental buildings. The total residential gross floor area of all buildings on the site (both new and existing) will be 67,900 square metres. A total 413 vehicular parking spaces and 547 bicycle parking spaces will be provided.

    Jul 26, 2013 · 88 SOUDAN AVE · City file

Lot facts

Area
1,140 m²
Frontage
35.1 mestimated, irregular lot
Depth
45.7 mestimated, irregular lot
Street
Dunfield Ave
Corner lot
Yes, also on Soudan Ave45.7 m along it
Public lane
None
Max height
14 m
Max lot coverage
—
  • Major Transit Station Area: Eglinton. The lot is inside the Eglinton Major Transit Station Area approved by the Province (Site and Area Specific Policy 723). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone O (Open Space). Chapter 90, section 90.10 of the by-law. Source

Around this lot

Minor variances approved
100%24 of 24 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
3
Development applications
31

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal to add retractable glazing to existing condo balcony.

    2181 YONGE ST · Nov 26, 2026 · 182 m away
  • Building permit

    Rev 01: Revision to permit.Proposal for interior alterations to existing office suite at 4th floor

    20 HOLLY ST · Nov 26, 2026 · 116 m away
  • Building permit

    One wall sign***MIDTOWN ORAL & MAXILLOFACIAL SURGERY***

    57 SOUDAN AVE · Nov 23, 2026 · 99 m away
  • Building permit

    Revision 01 - Building renovation including interior alterations at basement level, ground floor lobby level and 3rd floor. Project scope also includes elevator modernization, curtain wall modernization.) All changes bubbled on plans and described in a covering memo.Building renovation including interior alterations at basement level, ground floor lobby level and 3rdfloor. Project scope also includes elevator modernization, curtain wall modernization. No new floorarea is proposed.

    2180 YONGE ST · Nov 23, 2026 · 256 m away
  • Building permit

    Revision #1 - Building renovation including interior demolition, core and shell commercial space, replacement of the east elevation façade and roof repair. Changes bubbled on plans and cover memo outline nature of changes.Proposed building renovation including interior demolition, core and shell commercial space, replacement of the east elevation façade and roof repair. No new floor area is proposed.

    2190 YONGE ST · Nov 23, 2026 · 299 m away
  • Building permit

    Remove and dispose of existing non-compliant guards and handrails, including top landing guards, stair guards, and wall-mounted handrails. Install new code-compliant guards and handrails at two existing staircases.

    50-60 HOLLY ST · Nov 17, 2026 · 151 m away
  • Building permit

    One wall sign***MIDTOWN ORAL & MAXILLOFACIAL SURGERY***

    57 SOUDAN AVE · Nov 16, 2026 · 99 m away
  • Building permit

    1 Wall Sign***AZITA BEAUTY SALON***

    2146 YONGE ST · Nov 12, 2026 · 280 m away
  • Building permit

    Designing and installing a sprinkler modification system

    110 EGLINTON AVE E · Nov 10, 2026 · 294 m away
  • Building permit

    Proposal for interior alterations to an office for a tenant fit up.

    90 EGLINTON AVE E · Nov 4, 2026 · 281 m away

Neighbourhood: South Eglinton-Davisville

About the area around the lot, not the lot itself.

Nearest station
Eglinton Station6 min walk
Nearest TTC stop
Opposite 2190 Yonge St4 min walk
Nearest cycling route
Eglinton Ave ECycle Track, 4 min walk
Nearest traffic count
4,586 vehicles in 14 hSoudan Ave / Lillian St, 150 m away, Jul 22, 2025
Serious collisions within 500 m
32021–2026, killed or seriously injured: 3 fatal, 3 with pedestrians, 0 with cyclists
Parks
Raccoon Park1 min walk
Dunfield Park1 min walk
Hillsdale Avenue Park2 min walk

Schools within 1 km

  • EGLINTON LINC AND ESL CENTRE English Separate 5 min walk
  • CAESAR INTERNATIONAL ACADEMY Private 5 min walk
  • CAREERQUEST Private 5 min walk
  • WILLOWDALE HIGH SCHOOL Private 6 min walk
  • THE STUDY ACADEMY SCHOOL Private 7 min walk
  • EGLINTON JR PUBLIC SCHOOL English Public 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth Eglinton-DavisvilleMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home30%54%
Population (2021)22,73516,813
Homes built in 1960 or before11%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth Eglinton-DavisvilleCity median
Assault436636.3
Robbery24.269.5
Auto theft58.8192.6
Theft over $5,00020.846.1
Break and enter128172.8
Theft from vehicles100.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.