Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 85 Douglas Dr
85 Douglas Dr is on a 13.8 m by 42.8 m lot on Douglas Dr in Rosedale-Moore Park. The zoning is RD. A site-specific exception, 900.3.10(1351), changes some of the usual rules for this address. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.
The City has 6 records on this lot since 2012. That is more than at 95% of Toronto houses. In 2026, a building permit was filed: "Proposal to construct a lower rear deck". Status: not started - express. In 2014, a building permit was filed: "Revision: remove chimney on rear main wall and construct a wind, remove skylight from roof of second floor, alterations to roof layout.proposal for a rear 2…". Status: revision issued. In 2013, a Committee of Adjustment application was filed: "To alter the 2½-storey detached dwelling by converting the attached garage into habitable space and constructing a rear one-storey addition and a rear deck…". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection. There is 1 open order or by-law investigation on file. Ask the seller what is outstanding and whether it will be fixed before closing.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 35 minor variance applications in the last 10 years and approved 97%. The nearest TTC stop is 20 Scholfield Ave - Rosedale Park, a 2-minute walk.
Summary
What the City's records show on this house
- 1 open order or by-law investigationSerious
- Building permit open since 2014ModerateFree check
- Heritage property: in a Heritage Conservation District (Part V)Moderate
- Work or applications in progressModerateFree check
- Site-specific exception 900.3.10(1351)Moderate
- No permit for a second unit on fileLowFree check
- The back yard may be too tight for a garden suiteLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
4 things to check before you offer, 1 of them serious.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 1 open order or by-law investigation
- Building permit open since 2014
- Work or applications in progress
What this part means for this house, in plain EnglishUnlock
1 open order or by-law investigation
SeriousCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Building permit open since 2014
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
6 records on file, more than at 95% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-11-23 | Building permit26 273659 | Proposal to construct a lower rear deck. | Not Started - Express | |
| 2026-10-06 | Building order26 249984 OTC 00 VI | Deck at rear not shown on plans and requires guards and handrails | Order Issued | |
| 2014-04-07 | Building permit13 173997 | REVISION: Remove chimney on rear main wall and construct a wind, remove skylight from roof of second floor, alterations to roof layout.Proposal for a rear 2 storey addition (112.3m2), interior alterations (83.1 m2) and basement finishing (20 m2) to existing detached single family dwelling. | Revision Issued | |
| 2013-03-27 | Minor varianceA0026/13TEY | To alter the 2½-storey detached dwelling by converting the attached garage into habitable space and constructing a rear one-storey addition and a rear deck. Also, to relocate the required parking space from the private garage to the east side yard. | Approved | |
| 2013-02-19 | Zoning review13 121432 ZZC | No description on file | Closed | |
| 2012-10-24 | Zoning review12 267396 ZPR | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: in a Heritage Conservation District (Part V)
- Site-specific exception 900.3.10(1351)
What this part means for this house, in plain EnglishUnlock
Heritage property: in a Heritage Conservation District (Part V)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.3.10(1351)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage Register
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.3.10(1351)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: likely fits
- Garden suite: needs a closer look
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
The back yard may be too tight for a garden suite
LowCheck if it appliesSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RD (f12.0; d0.6) (x1351)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 157 m²
- Back yard
- 16.7 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- 8 suite and multiplex permits within 300 m in 10 years
- 35 minor variance decisions within 300 m, 97% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 6 categories
- Break and enter: 2.6 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Rosedale-Moore Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Summerhill StationNearest station17 min walk
- 20 Scholfield Ave - Rosedale ParkNearest TTC stop2 min walk
- Maclennan AveNearest cycling route2 min walk
- Whitney Jr Public SchoolSchool6 min walk
- Gradale Academy Elementary SchoolSchool8 min walk
- Our Lady of Perpetual Help Catholic Elementary SchoolSchool9 min walk
- Rosedale Jr Public SchoolSchool12 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.4
- Robberycity median 69.586.8
- Auto theftcity median 192.6199.6
- Theft over $5,000city median 46.165.1
- Break and entercity median 172.8455.6
- Theft from vehiclescity median 188.1182.2
Ready emails
Copy and send as they are.
6 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist