HousePrecheckCheck an address

83 Yonge StDowntown Yonge East, Toronto · City records before you offer

Commercial residential · CR 12.0 (c8.0; r11.7) SS1 (x2325)≈ 15.6 × 40.4 m452 m²on Yonge St

2 things to check before you offer, including heritage property: designated (Part IV)
N10 m
≈ 15.6 m frontage≈ 40.4 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 83 Yonge St

83 Yonge St is on a 15.6 m by 40.4 m lot on Yonge St in Downtown Yonge East. The zoning is CR. A site-specific exception, 900.11.10(2325), changes some of the usual rules for this address. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.

The City has 20 records on this lot since 1993. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "1 projecting sign *** convivium ***". Status: not started. In 2025, a building permit was filed: "Rev 03 - eliminated the washroom on ground floor. eliminated the fire system from this permit. made revision to scope of work on 3rd floor, framing and…". Status: closed. In 2025, a building permit was filed: "1 wall sign**convivium dining community**". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 14 development applications are open (the tallest up to 80 storeys). Within 300 m, the Committee of Adjustment decided 11 minor variance applications in the last 10 years and approved 100%. King station is a 2-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Heritage property: designated (Part IV)Moderate
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2325)Moderate
  • 14 development applications open within 300 mLowFree check
  • Priority retail street: Yonge StreetLow
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

20 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-06-29Building permit
26 192949
1 Projecting Sign *** CONVIVIUM ***Not Started
2026-05-14By-law investigation
26 160756 SIN 00 IR
SignsClosed
2025-06-12Building permit
24 242147
Rev 03 - Eliminated the washroom on ground floor. Eliminated the fire system from this permit. Made revision to scope of work on 3rd floor, Framing and Rough-ins only.Rev 02 - revision to separate the third floor from the original building permit, as the basement, ground, and second floors will be used as a restaurant, while the third floor will be designated for office use. Proposal for Interior alterations.Closed
2025-05-30Building permit
25 155179
1 wall sign**CONVIVIUM DINING COMMUNITY**Closed
2025-04-25Building permit
25 141931
Upgrad fire alarm panel and devises.Inspection
2025-04-11Building permit
25 143293
1 wall sign + 1 projecting sign**CONVIVIUM DINING COMMUNITY**Cancelled
2025-04-03Building permit
25 138981
1 wall sign + 1 projecting sign**CONVIVIUM DINING COMMUNITY**Cancelled
2024-09-02Zoning review
24 206934 ZAP
No description on fileNotice Sent
2019-03-26Building permit
19 121454
To erect and display one illuminated wall sign displaying static copy on the first storey of the westerly elevation, measuring 4.24 m by 0.86 m at a height of 4.15 m. ****BASIL BOX****Closed
2019-03-07Building permit
19 104205
REV 01 - Proposed revision to occupant load per OBC reference (3.1.17.1) [Patron Area = 131.22 M.SQ., Occupant Load: 131.22/1.10 = 119 Persons]Interior alterations to Basil Box restaurantClosed
2018-04-23Building permit
18 139423
Interior alterations - 3rd Floor - RFA DevelopmentsClosed
2017-12-28Building permit
17 271969
Proposed interior alterations to existing office space on the 3rd floor of existing multiple-unit building.Closed
2016-10-25Building permit
16 220291
In conjunction with a restaurant on the premises, proposal to erect and display three wall signs on the rear of the building. One of the proposed wall signs are on the east elevation, non-illuminated and painted, measuring 1.37 metres vertically by 1.49 metres horizontally at a height of 2.37 metres above grade. One of the proposed wall signs located on the north elevation is non-illuminated, containing static copy, measuring 0.47 metres vertically by 0.91 metres horizontally at a height of 2.13 above grade. The other proposed wall sign located on the north elevation is illuminated, containing static copy and measuring 0.25 metres vertically by 2.6 metres horizontally at a height of 3.15 metres above grade. **Potbelly** Closed
2016-08-16Building permit
16 183015
Proposal to install a 1.5 inch backflow prevention valve.Closed
2016-08-12Building permit
16 189067
In conjunction with a two storey building on the premises, proposal to erect and display two illuminated wall signs and one illuminated projecting sign, all displaying static copy on the first storey west elevation wall. One of the proposed wall signs is 0.63 metres vertically by 3.43 metres horizontally at a height of 3.73 metres above grade. The other proposed wall sign is 0.31 metres vertically by 4.24 metres horizontally at a height of 3.1 metres above grade. The proposed projecting sign is 0.61 metres vertically by 0.61 metres horizontally at a height of 3.24 metres above grade. **POT BELLY**Closed
2016-06-08Building permit
16 146566
Proposal for interior alterations to basement and main floor for a restaurant, seating to also be provided on exterior patio, "Pot Belly"Closed
2015-02-13Building permit
14 265401
Proposal for interior alterations to the ground floor for new restauant with 30 seats - "Cargo Cafe"Cancelled
2008-10-17Building permit
08 211600
HVAC - Proposal for interior alterations to second storey of office building. Tenant to be "Buchan Foundation".Closed
2004-05-06Building permit
03 162315
Revision to staircaseClosed
1993-10-20Zoning review
93 025705 LTO
No description on fileClosed
Some

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: designated (Part IV)
  • Site-specific exception 900.11.10(2325)
  • Priority retail street: Yonge Street

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: designated (Part IV)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Site-specific exception 900.11.10(2325)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. Priority retail street: Yonge Street

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2325)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
≈ 15.6 m frontage≈ 40.4 m deepon Yonge St
Zone
CR 12.0 (c8.0; r11.7) SS1 (x2325)
Height limit
76 m
Corner lot
No
Public lane
None
House footprint
242 m²
Back yard
0.3 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 14 development applications open within 300 m, up to 80 storeys
    • In the Queen station area
    • 11 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 14 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • King StationNearest station2 min walk
    • King Station - Northbound PlatformNearest TTC stop1 min walk
    • Adelaide St ENearest cycling route2 min walk
    • Victoria Street LincSchool2 min walk
    • Keystone International SchoolsSchool3 min walk
    • St Michael's Choir School - Gymnasium BldgSchool9 min walk
    • St Michael's Choir School - Choral BldgSchool10 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    3 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 83 Yonge St

    2 things to check at 83 Yonge St before you offer

    • Heritage property: designated (Part IV)Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2325)Moderate
    • 14 development applications open within 300 mLow
    • and 2 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 5 steps to take before you offer, so nothing slips
    • What each of the 6 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.