Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 81 Charles St E
81 Charles St E is on a 7.7 m by 49.6 m lot on Charles St E in Church-Wellesley. The zoning is R. A site-specific exception, 900.2.10(874), changes some of the usual rules for this address.
The City has 12 records on this lot since 2015. That is more than at 99% of Toronto houses. In 2024, a building permit was filed: "Proposed interior alterations and exterior cladding to existing rooming house". Status: inspection. In 2022, a building permit was filed: "Proposal to underpin existing rooming house". Status: closed. In 2024, a zoning review was filed. Status: extension granted. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 17 development applications are open (the tallest up to 75 storeys). Wellesley station is a 8-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2024ModerateFree check
- Site-specific exception 900.2.10(874)Moderate
- 2 by-law investigations closed in the last two yearsLow
- No permit for a second unit on fileLowFree check
- A garden suite may lack room for its fire access pathLowFree check
- 17 development applications open within 300 mLowFree check
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units · Laneway suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2024
- 2 by-law investigations closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Building permit open since 2024
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
2 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buying
City files on this lot
12 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-02-24 | By-law investigation26 120984 RMH 00 IR | Rooming House | Closed | |
| 2025-07-23 | By-law investigation25 208503 LGW 00 IV | Notice Issued Long Grass | Closed | |
| 2025-07-23 | By-law investigation25 199137 LGW 00 IR | Long Grass and Weeds | Closed | |
| 2025-03-09 | By-law investigation25 126503 PRS 00 IR | Property Standards | Closed | |
| 2024-04-22 | Zoning review24 138984 ZAP | No description on file | Extension Granted | |
| 2024-02-08 | Building permit23 109217 | Proposed interior alterations and exterior cladding to existing rooming house | Inspection | |
| 2022-11-29 | Building permit22 234493 | Proposed rear and front walkouts | Cancelled | |
| 2022-11-03 | Building permit22 200556 | Proposal to underpin existing rooming house. | Closed | |
| 2022-06-21 | Zoning review22 165629 ZAP | No description on file | Closed | |
| 2019-03-27 | Building permit19 131573 | Proposal for interior alteration (339.39m2) converting existing dormitory to single family dwelling. | Cancelled | |
| 2018-12-23 | Zoning review18 271674 ZPR | No description on file | Closed | |
| 2015-11-12 | Zoning review15 250436 ZPR | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(874)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(874)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(874)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: likely fits
- Garden suite: needs a closer look
- Laneway suite: likely fits
What this part means for this house, in plain EnglishUnlock
A garden suite may lack room for its fire access path
LowCheck if it appliesSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Laneway suite
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x874)
- Height limit
- 30 m
- Corner lot
- No
- Public lane
- Al Sparrow Lane, 7.5 m along it
- New house permit
- None since 2000
- House footprint
- 204 m²
- Back yard
- 16.4 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 17 development applications open within 300 m, up to 75 storeys
- In the Bloor-Yonge station area
- 4 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
17 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 7 categories
- Theft over $5,000: 2.3 times the Toronto median
- Assault: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Church-Wellesley neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Wellesley StationNearest station8 min walk
- Bloor St East at Church StNearest TTC stop4 min walk
- Bloor St ENearest cycling route4 min walk
- Humber College - International Graduate SchoolSchool3 min walk
- The Abelard Centre for EducationSchool4 min walk
- Monsignor Fraser College - Isabella CampusSchool6 min walk
- Monsignor Fraser College - Isabella NorthSchool6 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31264.6
- Robberycity median 69.593.2
- Homicidecity median 5.33.3
- Auto theftcity median 192.646.6
- Theft over $5,000city median 46.1106.5
- Break and entercity median 172.8146.4
- Theft from vehiclescity median 188.1206.3
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist