Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 80 Lamb Ave
80 Lamb Ave is on a 5.9 m by 40.8 m lot on Lamb Ave in Greenwood-Coxwell. The zoning is R. A site-specific exception, 900.2.10(736), changes some of the usual rules for this address.
The City has 5 records on this lot since 2012. That is more than at 93% of Toronto houses. In 2026, a building permit was filed: "Convert a single family dwelling into a duplex , interior alterations to relocate the washroom". Status: inspection. In 2026, a building permit was filed: "Proposal to ocnstruct a new 2 storey laneway suite". Status: inspection. In 2025, a Committee of Adjustment application was filed: "To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground level deck and stairs, and a rear second…". Status: closed. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Greenwood station is a 6-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2012ModerateFree check
- Work or applications in progressModerateFree check
- Records mention laneway suite, multiplex, second unitModerateFree check
- A garden suite may lack room for its fire access pathLowFree check
- 1 City tree in front of this lotLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2012
- Work or applications in progress
- Records mention laneway suite, multiplex, second unit
What this part means for this house, in plain EnglishUnlock
Building permit open since 2012
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention laneway suite, multiplex, second unit
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
5 records on file, more than at 93% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-09-10 | Building permit26 153362 | Convert a single Family Dwelling into a Duplex , interior alterations to relocate the washroom | Inspection | |
| 2026-04-14 | Building permit26 104793 | Proposal to ocnstruct a new 2 storey laneway suite. | Inspection | |
| 2025-05-07 | Minor varianceA0200/25TEY | To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground level deck and stairs, and a rear second storey balcony. Also, to construct a new two-storey ancillary building containing one laneway suite with a rear second storey balcony, and a rooftop equipment area, in the rear yard, abutting the laneway. There will be a total of two residential dwelling units (one unit within the main dwelling and one unit within the ancillary building) on this lot. | Approved | |
| 2024-10-15 | Zoning review24 226497 ZAP | No description on file | Application On Hold | |
| 2012-07-13 | Building permit12 210747 | Rebuild rear det garage. | Inspection |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Exception 900.2.10(736) does not apply to this address
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Exception 900.2.10(736) does not apply to this address
Nothing to doNothing to do: this does not apply to the house.
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, laneway suite, second unit
- Garden suite: needs a closer look
What this part means for this house, in plain EnglishUnlock
A garden suite may lack room for its fire access path
LowCheck if it appliesSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6) (x736)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- Ln W Lamb S Mountjoy, 5.3 m along it
- New house permit
- None since 2000
- House footprint
- 85 m²
- Back yard
- 21.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- In the Greenwood station area
- 6 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 8 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Greenwood-Coxwell neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Greenwood StationNearest station6 min walk
- Greenwood Ave at Mountnoel AveNearest TTC stop4 min walk
- Monarch Park AveNearest cycling route3 min walk
- Michelle-O'Bonsawin Secondary SchoolSchool3 min walk
- St Patrick Catholic Secondary SchoolSchool4 min walk
- St Patrick Catholic Secondary SchoolSchool4 min walk
- Monarch Park Collegiate & School of Life ExperienceSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3671.1
- Robberycity median 69.558.1
- Homicidecity median 5.36.5
- Shootingscity median 10.56.5
- Auto theftcity median 192.6148.4
- Theft over $5,000city median 46.125.8
- Break and entercity median 172.8135.5
- Theft from vehiclescity median 188.1232.3
Ready emails
Copy and send as they are.
6 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist