HousePrecheckCheck an address

8 Elm StYonge-Bay Corridor, Toronto · City records before you offer

Also 10A Elm St, 10B Elm St

Commercial residential · CR 6.0 (c2.0; r6.0) SS1 (x395)17.3 × 33.3 m568 m²on Elm St

3 things to check before you offer, including building permit open since 2023
N20 m
17.3 m frontage33.3 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 8 Elm St

8 Elm St is on a 17.3 m by 33.3 m lot on Elm St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(395), changes some of the usual rules for this address. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.

The City has 22 records on this lot since 1991. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Alternative solution for single exit condition for the group of rooms located on the southwest portion of level 2". Status: approved. In 2026, a building permit was filed: "Alternative solution for dead-end corridors conditions within levels 5-8". Status: approved. In 2026, a building permit was filed: "Alternative solution for installing fire hose connections in stairwells". Status: approved. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 18 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 14 minor variance applications in the last 10 years and approved 93%. TMU station is a 3-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2023ModerateFree check
  • Heritage property: designated (Part IV)Moderate
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(395)Moderate
  • 18 development applications open within 300 mLowFree check
  • Priority retail street: Elm StreetLow
  • Downtown Plan Secondary PlanLow
  • 3 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

3 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2023
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2023

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 3 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

22 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-07-29Building permit
26 210928
Alternative Solution for single exit condition for the group of rooms located on the southwest portion of Level 2.Approved
2026-07-29Building permit
26 210923
Alternative Solution for dead-end corridors conditions within levels 5-8,Approved
2026-07-28Building permit
26 210054
Alternative solution for installing fire hose connections in stairwellsApproved
2026-07-28Building permit
26 210050
Alternative Solution or installing fire hose connections in stairwells related to 22 216196 BLD 00 NBCancelled
2025-03-31Building permit
22 216196
Conditional Permit - Proposal to construct one 69 storey residential building consisting of 819 units, mixed use on the ground floor together with community space and 3 levels of underground parking. (22 216041 BLD 00 BA). 19-204479 PBClosed
2024-06-19Consent (lot split)
B0013/24TEY
To obtain consent to sever the property into two lots, as well as maintaining existing easements/rights-of-way.Approved
2024-02-26Zoning review
24 118837 ZAP
No description on fileNotice Sent
2023-01-10Building permit
22 216041
Structural Facade retention, and demolition of portions of the building.Inspection
2022-07-27Minor variance
A0408/22TEY
To permit the reduction of residential parking spaces provided within the 68-storey mixed-use building, currently under review by Site Plan Control Application (File Number 21 214195 STE 11 SA). There will be a total of 807 residential dwelling units within this building.Approved
2022-04-29Building permit
22 135743
Interior alterations of exisitng ground floor space only for sales officeClosed
2022-04-11Zoning review
21 214195 PSP
No description on fileClosed
2021-09-17Development application
21 214195 STE 11 SA
Site Plan Approval for a 68-storey mixed-use building having a non-residential gross floor area of 304 square metres, and a residential gross floor area of 49936 square metres. A total of 819 residential dwelling units are proposed.Closed
2021-09-17Development application
21 214202 STE 11 CD
Draft Plan of Condominium for 819 units.Draft Plan Approved
2021-06-29Zoning review
16 189782 PRZ
No description on fileClosed
2020-09-02Consent (lot split)
B0046/20TEY
To obtain consent to create an easement/right-of-way for vehicular and pedestrian access for emergency purposes only.Approved
2016-07-29Building permit
16 189008
install backflow preventerClosed
2016-07-13Development application
16 189782 STE 27 OZ
Rezoning Application for proposed 68-storey mixed-use building containing819 residential units and retail/office space on the first, second and third floors. This application is under appeal to LPAT.Closed
2003-04-04Building permit
01 183454
Alter plans as approved under file 01 - 183454 and 01 - 183454 - 01 by extending rear addition to roof level (stair enclosure) HISTORICALClosed
2002-05-02Building permit
02 125978
mech. distribution---in connection with bp#01-183454Closed
2001-12-12Zoning review
01 201829 ZPU
No description on fileClosed
2001-08-07Zoning review
01 166129 000
No description on fileClosed
1991-02-05Zoning review
91 026069 LTO
No description on fileClosed
Some

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: designated (Part IV)
  • Site-specific exception 900.11.10(395)
  • Priority retail street: Elm Street

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: designated (Part IV)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Site-specific exception 900.11.10(395)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. Priority retail street: Elm Street

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(395)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
17.3 m frontage33.3 m deepon Elm St
Zone
CR 6.0 (c2.0; r6.0) SS1 (x395)
Height limit
46 m
Corner lot
No
Public lane
None
House footprint
360 m²
Back yard
11.6 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 18 development applications open within 300 m, up to 85 storeys
    • In the College station area
    • 14 minor variance decisions within 300 m, 93% approved

    What this part means for this house, in plain EnglishUnlock

    1. 18 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 8 categories
    • Assault: 5.3 times the Toronto median
    • Theft over $5,000: 4.6 times the Toronto median
    • Robbery: 4.3 times the Toronto median
    • Break and enter: 3.2 times the Toronto median
    • Homicide: 2.3 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Yonge-Bay Corridor neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$68,500median $84,500
    Households that own their home32%median 54%
    Population (2021)12,645median 16,813
    Homes built in 1960 or before2%median 29%
    Homes needing major repairs2%median 7%

    Getting around and schools

    • TMU StationNearest station3 min walk
    • Yonge St at Elm StNearest TTC stop1 min walk
    • Gerrard St WNearest cycling route2 min walk
    • Tmu - Heaslip HouseSchool4 min walk
    • Toronto Metropolitan University - Entr To Business School LobbySchool4 min walk
    • Toronto Metropolitan University - School of Image ArtsSchool4 min walk
    • Toronto Metropolitan University - Theatre SchoolSchool5 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.33361.1
    • Robberycity median 69.5300.1
    • Homicidecity median 5.312
    • Shootingscity median 10.512
    • Auto theftcity median 192.6162.1
    • Theft over $5,000city median 46.1210.1
    • Break and entercity median 172.8552.2
    • Theft from vehiclescity median 188.1402.1

    More about Yonge-Bay Corridor

    Ready emails

    Copy and send as they are.

    5 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 8 Elm St

    3 things to check at 8 Elm St before you offer

    • Building permit open since 2023Moderate
    • Heritage property: designated (Part IV)Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(395)Moderate
    • and 4 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 9 steps to take before you offer, so nothing slips
    • What each of the 8 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.