HousePrecheckCheck an address

78 Springhurst AveSouth Parkdale, Toronto · City records before you offer

Residential · R (d1.0)≈ 34.9 × 12.9 m226 m²on Springhurst Avebacks onto Ln E Close N Springhurst

2 things to check before you offer, including 1 open order or by-law investigation
N10 m
≈ 34.9 m frontage≈ 12.9 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 78 Springhurst Ave

78 Springhurst Ave is on a 34.9 m by 12.9 m lot on Springhurst Ave in South Parkdale. The zoning is R.

The City has 12 records on this lot since 2025. That is more than at 99% of Toronto houses. In 2026, a development application was filed: "Site plan approval for an 8-storey supportive housing apartment building with 54 rental units". Status: under review. In 2026, a building permit was filed: "Demolition of the existing two-storey rental residential building to allow for new development". Status: examiner's notice sent. In 2026, a Committee of Adjustment application was filed: "To legalize and maintain a front entrance uncovered accessible ramp which was constructed without an authorized building permit, attached to the front porch of…". Status: closed. There is 1 open order or by-law investigation on file. Ask the seller what is outstanding and whether it will be fixed before closing.

Within 300 m, 3 development applications are open (the tallest up to 8 storeys). Within 300 m, the Committee of Adjustment decided 11 minor variance applications in the last 10 years and approved 100%. The nearest TTC stop is Toronto Rehab - Bickle Centre at 130 Dunn Ave, a 2-minute walk.

Summary

What the City's records show on this house

  • 1 open order or by-law investigationSerious
  • Work or applications in progressModerateFree check
  • No permit for a second unit on fileLowFree check
  • House demolished in 2026, no new house permit on fileLow
  • 3 development applications open within 300 mLowFree check
  • 5 City trees in front of this lotLowFree check
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 6 units · Laneway suite

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer, 1 of them serious.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Serious

Open City files

How much in the City's records needs answers before an offer

  • 1 open order or by-law investigation
  • Work or applications in progress
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. 1 open order or by-law investigation

    SeriousCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

12 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-10-07Zoning review
26 213803 PSP
No description on fileClosed
2026-08-04Development application
26 213803 STE 04 SA
Site Plan Approval for an 8-storey supportive housing apartment building with 54 rental units.Under Review
2026-06-19Zoning review
26 143612 POZ
No description on fileClosed
2026-06-10Building permit
26 182029
Demolition of the existing two-storey rental residential building to allow for new development.Examiner's Notice Sent
2026-05-29By-law investigation
26 198624 LGW 00 IV
Notice Issued Long GrassClosed
2026-05-29By-law investigation
26 170058 LGW 00 IR
Long Grass and WeedsClosed
2026-05-13Minor variance
A0152/26TEY
To legalize and maintain a front entrance uncovered accessible ramp which was constructed without an authorized building permit, attached to the front porch of the existing two-storey detached building (hostel/shelter).Approved
2026-04-14Development application
26 143612 STE 04 OZ
Proposed 8-storey 54-unit supportive housing project. The submission proposes a total GFA of 2,707 sm, including 137 sm (1,483 sf) of indoor amenity area and 120 sm of outdoor amenity area.Council Approved
2025-07-07Building permit
25 189367
Proposed wheelchair accessible ramp.Under Review
2025-06-17By-law investigation
25 178972 LGW 00 IV
Notice Issued Long GrassClosed
2025-06-17By-law investigation
25 178388 LGW 00 IR
Long Grass and WeedsClosed
2025-06-03Building order
25 170680 WNP 00 VI
Order Issued No Permit: Constructed a deck porch and constructed a ramp on the right of way without a permitOrder Issued
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • No heritage listing or designation
  • No site-specific zoning exception

What this part means for this house, in plain EnglishUnlock

  1. 5 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Some

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 6 units: allowed
  • Laneway suite: likely fits
  • Secondary suite: allowed

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 6 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  2. Laneway suite

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N10 m
≈ 34.9 m frontage≈ 12.9 m deepon Springhurst Ave
Zone
R (d1.0)
Height limit
—
Corner lot
No
Public lane
Ln E Close N Springhurst, 22.9 m along it
New house permit
None since 2000

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Active

Building nearby

How much neighbours are building and applying to change within 300 m

  • 3 development applications open within 300 m, up to 8 storeys
  • 8 suite and multiplex permits within 300 m in 10 years
  • 11 minor variance decisions within 300 m, 100% approved

What this part means for this house, in plain EnglishUnlock

  1. 3 development applications open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 5 of 8 categories
  • Assault: 1.8 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

South Parkdale neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$57,200median $84,500
Households that own their home15%median 54%
Population (2021)20,495median 16,813
Homes built in 1960 or before37%median 29%
Homes needing major repairs11%median 7%

Getting around and schools

  • Exhibition GO StationNearest station19 min walk
  • Toronto Rehab - Bickle Centre at 130 Dunn AveNearest TTC stop2 min walk
  • Martin Goodman / Waterfront TrlNearest cycling route3 min walk
  • Dr Rita Cox - Kina Minagok Public SchoolSchool6 min walk
  • Holy Family Catholic Elementary SchoolSchool9 min walk
  • Parkdale Collegiate InstituteSchool11 min walk
  • Mary Mother of God SchoolSchool15 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.31140.3
  • Robberycity median 69.568.6
  • Homicidecity median 5.33.8
  • Shootingscity median 10.57.6
  • Auto theftcity median 192.672.5
  • Theft over $5,000city median 46.145.8
  • Break and entercity median 172.8240.3
  • Theft from vehiclescity median 188.1205.9

More about South Parkdale

Ready emails

Copy and send as they are.

4 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 78 Springhurst Ave

2 things to check at 78 Springhurst Ave before you offer

  • 1 open order or by-law investigationSerious
  • Work or applications in progressModerate
  • No permit for a second unit on fileLow
  • House demolished in 2026, no new house permit on fileLow
  • and 3 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 4 steps to take before you offer, so nothing slips
  • What each of the 7 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.