Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 78 Baldwin St
78 Baldwin St is on a 5.9 m by 57.4 m lot on Baldwin St in Kensington-Chinatown. The zoning is R. A site-specific exception, 900.2.10(835), changes some of the usual rules for this address.
The City has 10 records on this lot since 2023. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal for a new 3 storey triplex". Status: inspection. In 2025, a building permit was filed: "Rev 01: revise windows to regular glazing instead of wired glassproposal to construct new 2 storey laneway suite". Status: closed. In 2025, a building permit was filed: "Drain - proposal for a new detached fourplex". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Queen's Park station is a 10-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Records mention laneway suite, multiplexModerateFree check
- Site-specific exception 900.2.10(835)Moderate
- 1 by-law investigation closed in the last two yearsLow
- 1 City tree in front of this lotLowFree check
- Downtown Plan Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- Records mention laneway suite, multiplex
- 1 by-law investigation closed in the last two years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention laneway suite, multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-10-22 | Zoning review26 259019 ZAP | No description on file | Notice Sent | |
| 2026-05-10 | By-law investigation26 158077 GRA 00 IR | Graffiti | Notice Issued | |
| 2026-04-27 | By-law investigation26 150983 PRS 00 IR | Property Standards | Closed | |
| 2026-02-24 | Building permit25 165109 | Proposal for a new 3 storey triplex. | Inspection | |
| 2025-07-31 | Building permit24 127477 | Rev 01: revise windows to regular glazing instead of wired glassProposal to construct new 2 storey laneway suite | Closed | |
| 2025-02-13 | Zoning review25 117106 ZAP | No description on file | Application On Hold | |
| 2025-01-08 | Building permit24 145840 | Drain - Proposal for a new detached fourplex | Closed | |
| 2024-08-28 | Building permit24 145855 | Proposed demolition of the existing semi-detached dwelling | Closed | |
| 2023-09-06 | Minor varianceA0634/23TEY | To construct a new four-storey semi-detached duplex building with a front covered porch and stairs, a rear ground floor deck and stairs, a second storey front balcony, as well as a rear third storey rooftop deck. The existing party wall with the adjacent semi-detached dwelling (municipally known as 76 Baldwin Street) will be maintained. | Approved | |
| 2023-02-16 | Zoning review23 114738 ZAP | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(835)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(835)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(835)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, laneway suite
- Garden suite: likely fits
What this part means for this house, in plain EnglishUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (f4.5; d1.0) (x835)
- Height limit
- 13 m
- Corner lot
- No
- Public lane
- Ln N Baldwin E Huron, 13.3 m along it
- New house permit
- 2026
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 6 development applications within 300 m in 10 years, none open
- In the Queens Park station area
- 50 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Theft over $5,000: 4.8 times the Toronto median
- Theft from vehicles: 4.5 times the Toronto median
- Assault: 3.2 times the Toronto median
- Robbery: 2.8 times the Toronto median
- Break and enter: 2.6 times the Toronto median
- Shootings: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Kensington-Chinatown neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Queen's Park StationNearest station10 min walk
- Spadina Ave at Nassau StNearest TTC stop4 min walk
- Beverley StNearest cycling route2 min walk
- Beverley & Subway Academy TwoSchool1 min walk
- Cornerstone Preparatory School - Main CampusSchool2 min walk
- Heydon Park Secondary SchoolSchool2 min walk
- Braemar College Private Secondary SchoolSchool5 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32017.5
- Robberycity median 69.5193
- Shootingscity median 10.521.9
- Auto theftcity median 192.6118.4
- Theft over $5,000city median 46.1219.3
- Break and entercity median 172.8443
- Theft from vehiclescity median 188.1850.8
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist