HousePrecheckCheck an address

752 Glengrove AveYorkdale-Glen Park, Toronto · City records before you offer

Residential detached · RD (f15.0; a550) (x5)17.5 × 40.6 m710 m²on Glengrove Avecorner, also on Capitol Ave

2 things to check before you offer, including building permit open since 2021
N20 m
17.5 m frontage40.6 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 752 Glengrove Ave

752 Glengrove Ave is on a 17.5 m by 40.6 m lot on Glengrove Ave in Yorkdale-Glen Park. The zoning is RD. A site-specific exception, 900.3.10(5), changes some of the usual rules for this address. The lot also fronts Capitol Ave.

The City has 13 records on this lot since 2000. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Proposal for change of use - 1 dwelling unit per floor, and add an exterior stair to second floor at the rear and enclose existing interior stairs with fire…". Status: closed. In 2021, a building permit was filed: "Proposal to construct a garden shed at rear of existing sfd". Status: inspection. In 2018, a building permit was filed: "Revise to the exterior wall change from to another block wall type, remove 2nd floor side balconies, increase side yard setback at rear portion of dwelling…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 32 minor variance applications in the last 10 years and approved 91%. Glencairn station is a 12-minute walk.

Summary

What the City's records show on this house

  • Building permit open since 2021ModerateFree check
  • Records mention multiplexModerateFree check
  • Site-specific exception 900.3.10(5)Moderate
  • 2 by-law investigations closed in the last two yearsLow
  • No house on this lot in the City's 3D modelLow
  • 1 City tree in front of this lotLowFree check
  • 2 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Garden suite

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2021
  • Records mention multiplex
  • 2 by-law investigations closed in the last two years

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2021

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Records mention multiplex

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 2 by-law investigations closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. 2 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

13 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-05-11By-law investigation
26 158365 ZON 00 IR
ZoningClosed
2026-04-24By-law investigation
26 156053 WST 00 IV
Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to bricks and construction wasteClosed
2026-04-24By-law investigation
26 149569 WST 00 IR
WasteClosed
2026-04-15By-law investigation
26 144126 PRS 00 IR
Property StandardsClosed
2025-04-25Building permit
25 108111
Proposal for change of use - 1 dwelling unit per floor, and add an exterior stair to second floor at the rear and enclose existing interior stairs with fire rated wallsClosed
2024-01-08Building permit
24 102371
proposing to construct a new fire escape from the second storey at the rear of the buildingCancelled
2021-10-27Building permit
21 176945
Proposal to construct a garden shed at rear of existing sfdInspection
2018-04-04Building permit
16 222641
Revise to the exterior wall change from to another block wall type, remove 2nd floor side balconies, increase side yard setback at rear portion of dwelling. New two storey dwelling with attached garageClosed
2016-08-02Zoning review
16 199807 ZPR
No description on fileClosed
2012-10-26Zoning review
12 269293 ZZC
No description on fileCancelled
2001-09-11Minor variance
A70/01HY
The applicant is proposing to construct a two-storey detached dwelling on the vacant lot.Refused
2001-03-01Minor variance
A039/01N
This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the construction of a new two storey dwelling on the above noted property. Also proposed is the construction of a front porch and a rear deck.Withdrawn
2000-10-31Building permit
00 350488
CONSTRUCTION OF A NEW TWO STOREY SINGLE FAMILY DWELLING.Cancelled
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.3.10(5)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.3.10(5)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 1 City tree in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.3.10(5)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Limited

Build potential

How much more the rules allow on this lot, beyond what is on record

  • On record: multiplex
  • Garden suite: likely fits
  • No public lane, so no laneway suite

What this part means for this house, in plain EnglishUnlock

  1. Garden suite

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N20 m
17.5 m frontage40.6 m deepon Glengrove Ave
Zone
RD (f15.0; a550) (x5)
Height limit
10 m
Lot coverage limit
35%
Corner lot
Yes, also on Capitol Ave
Public lane
None
New house permit
2018

What you can build

Why, measured on this lot, and the most you could buildUnlock

Quiet

Building nearby

How much neighbours are building and applying to change within 300 m

  • 0 development applications within 300 m in 10 years, none open
  • 18 suite and multiplex permits within 300 m in 10 years
  • 32 minor variance decisions within 300 m, 91% approved

What this part means for this house, in plain EnglishUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime well above median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 1 of 8 categories
  • Theft over $5,000: 6.0 times the Toronto median
  • Shootings: 2.7 times the Toronto median
  • Auto theft: 2.6 times the Toronto median
  • Robbery: 2.1 times the Toronto median
  • Break and enter: 2.0 times the Toronto median
  • Theft from vehicles: 1.9 times the Toronto median
  • Assault: 1.9 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Yorkdale-Glen Park neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$79,000median $84,500
Households that own their home54%median 54%
Population (2021)16,625median 16,813
Homes built in 1960 or before27%median 29%
Homes needing major repairs8%median 7%

Getting around and schools

  • Glencairn StationNearest station12 min walk
  • Glencairn Ave at Capitol AveNearest TTC stop4 min walk
  • Marlee AveNearest cycling route8 min walk
  • Fieldstone Day SchoolSchool5 min walk
  • Fieldstone King's College Secondary SchoolSchool5 min walk
  • St Charles Catholic Elementary SchoolSchool6 min walk
  • Sts Cosmas and Damian Catholic Elementary SchoolSchool9 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.31212.6
  • Robberycity median 69.5146.8
  • Homicidecity median 5.34.7
  • Shootingscity median 10.528.4
  • Auto theftcity median 192.6492.6
  • Theft over $5,000city median 46.1274.7
  • Break and entercity median 172.8341.1
  • Theft from vehiclescity median 188.1360

More about Yorkdale-Glen Park

Ready emails

Copy and send as they are.

5 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 752 Glengrove Ave

2 things to check at 752 Glengrove Ave before you offer

  • Building permit open since 2021Moderate
  • Records mention multiplexModerate
  • Site-specific exception 900.3.10(5)Moderate
  • 2 by-law investigations closed in the last two yearsLow
  • and 3 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 7 steps to take before you offer, so nothing slips
  • What each of the 7 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.