HousePrecheckCheck an address

751 Don Mills RdFlemingdon Park, Toronto · City records before you offer

≈ 50.8 × 67.4 m2,794 m²on Gateway Blvdcorner, also on Don Mills Rd

2 things to check before you offer, including building permit open since 2011
N20 m
≈ 50.8 m frontage≈ 67.4 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 751 Don Mills Rd

751 Don Mills Rd is on a 50.8 m by 67.4 m lot on Gateway Blvd in Flemingdon Park. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Don Mills Rd.

The City has 27 records on this lot since 2009. That is more than at 99% of Toronto houses. In 2022, a building permit was filed: "Application for a permit to erect and display four illuminated wall signs.*****tim horton's*****". Status: closed. In 2022, a building permit was filed: "Proposal for interior and exterior alterations in the existing tim horton's restaurant". Status: closed. In 2021, a building permit was filed: "To erect and display two illuminated ground signs***tim hortons***". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 1 development application is open. Within 300 m, the Committee of Adjustment decided 2 minor variance applications in the last 10 years and approved 100%. Don Valley station is a 14-minute walk.

Summary

What the City's records show on this house

  • Building permit open since 2011ModerateFree check
  • Zoning not in By-law 569-2013Moderate
  • 1 development application open within 300 mLowFree check
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2011
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2011

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

27 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-05-11By-law investigation
25 157583 SIN 00 IR
SignsClosed
2022-11-28Building permit
22 228846
Application for a permit to erect and display four illuminated wall signs.*****TIM HORTON'S*****Closed
2022-09-12Building permit
22 162908
Proposal for interior and exterior alterations in the existing Tim Horton's Restaurant.Closed
2021-07-06Building permit
21 175104
To erect and display two illuminated ground signs***TIM HORTONS***Closed
2021-03-11Zoning review
21 125965 ZSV
No description on fileClosed
2017-04-04Building permit
16 264241
Constructing interior alterations for Medical office and Pharmacy (88.5 m2)Closed
2014-03-05Building permit
14 123736
Proposed patio at rear of existing Subway restaurant for an additional 10 seats (17.3m2)Closed
2013-08-16Building permit
13 221908
To erect and display two illuminated static copy ground signs. **Tim Hortons**Closed
2012-08-23Zoning review
12 234296 LTO
No description on fileClosed
2012-05-23Zoning review
12 178049 LTO
No description on fileClosed
2012-04-19Building permit
12 148511
To erect and display one illuminated wall sign on the east elevation first storey wall of building in conjunction with a new restaurant. **Convenience Kitchen Food Fair**Closed
2012-03-15Building permit
12 132526
Pita Land - Building 'A' Unit 2 - Int. Alt.Closed
2012-02-21Building permit
12 124507
To erect and display four illuminated, static copy wall signs on the first storey level of building in conjunction with a new restaurant. **Pita Land**Closed
2012-01-18Building permit
11 323665
To erect and display one ground sign identifying several businesses in conjunction with a commercial plaza. **Don Gate Plaza**Closed
2011-09-09Building permit
11 250174
HVAC - Dongate Plaza - Pita Land - Building A - Unit 2Closed
2011-09-02Building permit
11 252242
HVAC - Kff Convenience inc unit 3.Closed
2011-08-11Building permit
11 246239
To erect and display two illuminated wall signs, each with static copy and each at the easterly and westerly facing first storey building wall, in conjunction with a "fast food" restaurant located on the premises of a multi-unit, multi-building commercial development. **Subway**Closed
2011-08-04Building permit
11 205342
Tim Hortons at Dongate PlazaClosed
2011-07-15Building permit
10 261960
Alterations to personal service shop in Unit 4, - Nails for You - Dongate PlazaClosed
2011-06-29Building permit
11 219640
To erect and display three illuminated wall signs, each with static copy and each on the westerly, northerly and southerly first storey building wall in conjunction with a proposed restaurant located on the premises. Also, to erect and display two directional ground signs, one menu board, and one preview menu screen (electronic static copy) for the purposes of a drive-thru facility located on the premises. **Tim Hortons**Closed
2011-06-21Building permit
10 259878
HVAC - Unit 1 - Subway StoreClosed
2011-06-03Building permit
11 154688
Dongate Plaza - Building A - One storey building shell onlyInspection
2011-04-18Building permit
11 146673
Demolition of service repair garage and attached site features. For the proposed retail plaza consisting of two buildings with retail and restaurant uses. A drive-through is proposed as part of the more southerly building on the site. Total proposed gross floor area is 483 square metres (5,200 square feet).Closed
2010-06-23Minor variance
A0085/10NY
This is an application to permit the construction of two buildings (restaurant and retail uses) on the above noted site.The existing building would be demolished.Approved
2010-05-06Zoning review
09 183349 PSP
No description on fileClosed
2009-10-13Development application
09 178258 NNY 26 SA
Proposed retail plaza consisting of two buildings with retail and restaurant uses. A drive-through is proposed as part of the more southerly building on the site. Total proposed gross floor area is 483 square metres (5,200 square feet).Closed
2009-09-02Zoning review
09 165347 ZPR
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Zoning not in By-law 569-2013
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N50 m
≈ 50.8 m frontage≈ 67.4 m deepon Gateway Blvd
Zone
—
Height limit
—
Corner lot
Yes, also on Don Mills Rd
Public lane
None
House footprint
334 m²
Back yard
35.9 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Some

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 1 development application open within 300 m
    • 2 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 1 development application open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 4 of 7 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Flemingdon Park neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$70,000median $84,500
    Households that own their home43%median 54%
    Population (2021)22,530median 16,813
    Homes built in 1960 or before13%median 29%
    Homes needing major repairs8%median 7%

    Getting around and schools

    • Don Valley StationNearest station14 min walk
    • Don Mills Rd at Gateway Blvd (North)Nearest TTC stop1 min walk
    • Gateway BlvdNearest cycling route1 min walk
    • Grenoble Public SchoolSchool5 min walk
    • Valley Park Mdl SchoolSchool7 min walk
    • Gateway Public SchoolSchool7 min walk
    • St John XXIII Catholic Elementary SchoolSchool8 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3596
    • Robberycity median 69.538
    • Shootingscity median 10.511.4
    • Auto theftcity median 192.6235.4
    • Theft over $5,000city median 46.126.6
    • Break and entercity median 172.860.7
    • Theft from vehiclescity median 188.1201.2

    More about Flemingdon Park

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 751 Don Mills Rd

    2 things to check at 751 Don Mills Rd before you offer

    • Building permit open since 2011Moderate
    • Zoning not in By-law 569-2013Moderate
    • 1 development application open within 300 mLow
    • 1 Committee of Adjustment file on this lotLow

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 6 steps to take before you offer, so nothing slips
    • What each of the 4 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.