Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 724 Dufferin St
724 Dufferin St is on a 5.3 m by 36.9 m lot on Dufferin St in Little Portugal. The zoning is CR. A site-specific exception, 900.11.10(1571), changes some of the usual rules for this address. The lot also fronts College St.
The City has 16 records on this lot since 1986. That is more than at 99% of Toronto houses. In 2019, a building permit was filed: "Proposal for multiple projects to an existing 3 storey mixed use building. scope of work includes a 2 storey rear addition, 2nd floor balcony and interior…". Status: inspection. In 2018, a Committee of Adjustment application was filed: "To alter the existing three-storey mixed-use building by constructing a two-storey rear addition for commercial use, connected to the existing building solely…". Status: closed. In 2012, a building permit was filed: "This is for interior alterations to the ground floor and second floor. this is for a new dental office, dr. reyhanian. this will include hvac and plumbing". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 3 development applications are open (the tallest up to 8 storeys). Within 300 m, the Committee of Adjustment decided 47 minor variance applications in the last 10 years and approved 89%. Dufferin station is a 15-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2019ModerateFree check
- Site-specific exception 900.11.10(1571)Moderate
- 3 development applications open within 300 mLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2019
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
Building permit open since 2019
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
16 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-10-07 | By-law investigation26 256551 GRA 00 IV | Notice Issued Graffiti | Notice Issued | |
| 2026-10-07 | By-law investigation26 250879 GRA 00 IR | Graffiti | Notice Issued | |
| 2026-07-13 | By-law investigation26 205119 GRA 00 IV | Notice Issued Graffiti | Closed | |
| 2026-07-13 | By-law investigation26 201132 GRA 00 IR | Graffiti | Closed | |
| 2026-05-29 | By-law investigation26 169780 GRA 00 IR | Graffiti | Closed | |
| 2026-05-26 | By-law investigation26 167681 GRA 00 IR | Graffiti | Closed | |
| 2026-04-30 | By-law investigation26 157794 GRA 00 IV | Notice Issued Graffiti | Closed | |
| 2026-04-30 | By-law investigation26 152836 GRA 00 IR | Graffiti | Closed | |
| 2019-07-24 | Building permit19 118988 | Proposal for multiple projects to an existing 3 storey mixed use building. Scope of work includes a 2 storey rear addition, 2nd floor balcony and interior alterations. See also 17 252340 ZZC and 18 101065 MV. | Inspection | |
| 2018-06-13 | Minor varianceA0032/18TEY | To alter the existing three-storey mixed-use building by constructing a two-storey rear addition for commercial use, connected to the existing building solely through the basement, and by extending the third storey balcony. | Approved | |
| 2017-10-24 | Zoning review17 252340 ZZC | No description on file | Closed | |
| 2012-09-04 | Building permit12 150182 | This is for interior alterations to the ground floor and second floor. This is for a new dental office, Dr. Reyhanian. This will include HVAC and Plumbing. | Closed | |
| 1995-08-28 | Building permit95 018748 | ALTER PLAN APPROVED UNDER FILE 365204 BY INSTALL NEW STAIR AT FRONT. SEE FILE 370407 FEES COLLECTED UNDER PERMIT 370407 | Closed | |
| 1995-01-11 | Building permit94 019726 | INSTALL HVAC SYSTEM AND DUCTWORK. HOLD FOR BLDG PERMIT 365204 | Closed | |
| 1995-01-11 | Building permit94 020589 | MAKE ALTS TO PORTION OF 1ST & 2ND FLOOR FOR DENTAL OFFICE PURPOSES. CONV. ADDRESS 1111A COLLEGE ST. /LM | Closed | |
| 1986-10-22 | Zoning review86 028453 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(1571)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(1571)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(1571)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 2.5 (c1.0; r2.0) SS2 (x1571)
- Height limit
- 14 m
- Corner lot
- Yes, also on College St
- Public lane
- Ln W Dufferin S College, 14.6 m along it
- House footprint
- 117 m²
- Back yard
- 11.8 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 3 development applications open within 300 m, up to 8 storeys
- 24 suite and multiplex permits within 300 m in 10 years
- 47 minor variance decisions within 300 m, 89% approved
What this part means for this house, in plain EnglishUnlock
3 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 2 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Little Portugal neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Dufferin StationNearest station15 min walk
- College St at Dufferin StNearest TTC stop1 min walk
- College StNearest cycling route1 min walk
- St Helen Catholic Elementary SchoolSchool4 min walk
- Brock Jr Public SchoolSchool7 min walk
- Shirley St Jr & City View AlternativeSchool9 min walk
- St Mary Catholic Academy Secondary SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3726.9
- Robberycity median 69.532.8
- Shootingscity median 10.510.9
- Auto theftcity median 192.6120.2
- Theft over $5,000city median 46.149.2
- Break and entercity median 172.8180.4
- Theft from vehiclescity median 188.1191.3
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist