Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 65 Dundas St E
65 Dundas St E is on a 26.1 m by 29.9 m lot on Dundas St E in Downtown Yonge East. The zoning is CR. A site-specific exception, 900.11.10(2153), changes some of the usual rules for this address. The lot also fronts Bond St.
The City has 36 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposed project consists of security system upgrades including cctv coverage throughout both exit stairwells and around the building perimeter, along with…". Status: under review. In 2025, a building permit was filed: "Revision 2 - updated kitchen designrev#1: renovation and conversion of existing hotel building into affordable housing by city of toronto. updated fire…". Status: under review. In 2024, a building permit was filed: "Proposal for renovation and conversion of existing hotel building into affordable housing by city of toronto. scope of work includes renovating the interior…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 12 development applications are open (the tallest up to 71 storeys). Within 300 m, the Committee of Adjustment decided 16 minor variance applications in the last 10 years and approved 94%. TMU station is a 3-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2024ModerateFree check
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(2153)Moderate
- 16 by-law investigations closed in the last two yearsLow
- 12 development applications open within 300 mLowFree check
- Priority retail street: Dundas Street EastLow
- 3 City trees in front of this lotLowFree check
- Downtown Plan Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2024
- Work or applications in progress
- 16 by-law investigations closed in the last two years
What this part means for this house, in plain EnglishUnlock
Building permit open since 2024
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
16 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
36 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-10-06 | Building permit26 250015 | Proposed project consists of security system upgrades including CCTV coverage throughout both exit stairwells and around the building perimeter, along with access control upgrades at stairwell and crossover floor doors. | Under Review | |
| 2026-09-14 | By-law investigation26 238076 PRS 00 IV | Notice Issued Prop Standards | Closed | |
| 2026-09-14 | By-law investigation26 237245 PRS 00 IR | Property Standards | Closed | |
| 2026-09-09 | By-law investigation26 234226 PRS 00 IR | Property Standards | Closed | |
| 2026-05-15 | By-law investigation26 161659 PRS 00 IR | Property Standards | Closed | |
| 2026-03-30 | By-law investigation26 136225 WST 00 IR | Waste | Closed | |
| 2026-03-15 | By-law investigation26 129871 PRS 00 IR | Property Standards | Closed | |
| 2026-03-14 | By-law investigation26 129589 PRS 00 IR | Property Standards | Closed | |
| 2025-12-13 | By-law investigation25 266077 PRS 00 IR | Property Standards | Closed | |
| 2025-12-13 | By-law investigation25 266067 PRS 00 IR | Property Standards | Closed | |
| 2025-11-18 | By-law investigation25 255350 PRS 00 IR | Property Standards | Closed | |
| 2025-08-25 | By-law investigation25 215410 GRA 00 IR | Graffiti | Closed | |
| 2025-06-25 | By-law investigation25 184493 PRS 00 IV | Order Issued Property Standards: Supplied hot water is not provided with a temperature range from 45 degrees Celsius to 60 degrees Celsius. | Closed | |
| 2025-06-25 | By-law investigation25 183852 PRS 00 IR | Property Standards | Closed | |
| 2025-06-11 | By-law investigation25 175353 PRS 00 IR | Property Standards | Closed | |
| 2025-05-12 | By-law investigation25 157762 PRS 00 IR | Property Standards | Closed | |
| 2025-05-12 | Building permit22 217753 | Revision 2 - Updated kitchen designREV#1: Renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Updated fire separation assemblies as per project requirements.PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing. | Under Review | |
| 2025-04-29 | By-law investigation25 151350 PRS 00 IR | Property Standards | Closed | |
| 2025-04-25 | By-law investigation25 149612 PRS 00 IR | Property Standards | Closed | |
| 2025-02-26 | By-law investigation25 122258 PRS 00 IR | Property Standards | Closed | |
| 2024-05-03 | Building permit24 125466 | Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior spaces and finishes and associated Mechanical, Electrical and Plumbing services as per the new program requirements. This application is for Phase 03 work only, which includes the work on Level 13 to Level 18 along with penthouse floor | Closed | |
| 2024-01-31 | Building permit23 120734 | Proposal to design and install the fire protection systems for the 19 storey building being converted to affordable housing. See related permits 22 217753 BLD (Phase 1), and 23 108352 BLD (Phase 2). | Inspection | |
| 2023-10-02 | Building permit23 209817 | * A standpipe system will be installed in accordance with requirements of NBC article 3.2.5.7 to 3.2.5.10.* The standpipe system will be designed, constructed, installed and tested to conform with the requirements of NFPA 14, Installation of Standpipe and Hose System.* A standpipe main feed will be provided for each stairwell located in the northwest and southeast of the building. * A 65mm hose connections will be provided on each stair landing.* A 65mm to 38mm hose valve adapters and fire hoses will be stored in the fire pumps room in basement 2 level. | Approved | |
| 2023-03-06 | Building permit23 108352 | PHASE 2 - Level 8 to Level 12Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing. Refer to Permit 22 217753 BLD 0 BA For Phase 1 (Basement 02 to Level 7). | Closed | |
| 2022-09-21 | Minor varianceA0918/22TEY | To convert the existing hotel building into an apartment building with a total of 280 affordable housing units. | Approved | |
| 2022-08-19 | Zoning review22 192970 ZAP | No description on file | Cancelled | |
| 2022-03-01 | Zoning review22 118489 ZPR | No description on file | Closed | |
| 2014-07-23 | Building permit14 195336 | Proposal to install 2 backflow prevention devices in an existing hotel - "Bond Place Hotel" | Closed | |
| 2013-04-22 | Building permit13 152765 | To erect and display two illuminated wall signs, one on the uppermost storey easterly facing elevation and one between the 17 &18th flr. **Bond Place Hotel** | Closed | |
| 2013-01-16 | Zoning review13 106504 ZSV | No description on file | Closed | |
| 2012-09-07 | Building permit12 226283 | To erect and display two illuminated wall signs, one on the east elevation on Bond St and one on the north elevation on Dundas St. E. Signs are on the first storey and in conjunction with a juice bar & grill.**Pomanar** | Closed | |
| 2011-08-09 | Building permit11 246134 | To erect and display one illuminated wall sign with static copy on the north-easterly facing second storey building wall, 3.53 metres wide by 1.18 metres long, at a height of 6.55 metres and in conjunction with an existing hotel located on the premises. **Bond Place Hotel** | Closed | |
| 2011-05-16 | Zoning review11 195752 ZSV | No description on file | Closed | |
| 2010-12-20 | Building permit10 174846 | REVISION TO EXISTING BUILDING PERMIT - REVISION TO REPLACE EXISTING HOLD OPEN DEVICES ON BASEMENT LEVEL OF EXISTING HOTEL SPACE> Proposal for ground floor demolition/additions (total of 11m2), and interior alterations (32m2) for existing hotel "Bond Place Hotel". Also see WNP file 10-165825. | Closed | |
| 2010-06-21 | Zoning review10 201926 LPR | No description on file | Closed | |
| 2001-04-25 | Zoning review01 035512 ZSV | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2153)
- Priority retail street: Dundas Street East
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2153)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Dundas Street East
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
3 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2153)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.0 (c2.0; r4.0) SS1 (x2153)
- Height limit
- —
- Corner lot
- Yes, also on Bond St
- Public lane
- None
- House footprint
- 485 m²
- Back yard
- 0.2 m
- Buildings on the lot
- 6
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 12 development applications open within 300 m, up to 71 storeys
- In the Dundas station area
- 16 minor variance decisions within 300 m, 94% approved
What this part means for this house, in plain EnglishUnlock
12 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Assault: 3.7 times the Toronto median
- Theft over $5,000: 2.2 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
- Robbery: 2.1 times the Toronto median
- Break and enter: 1.6 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Downtown Yonge East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- TMU StationNearest station3 min walk
- Dundas St East at Church StNearest TTC stop2 min walk
- Shuter StNearest cycling route3 min walk
- St Michael's Choir School - SecondarySchool1 min walk
- St Michael's Choir School - ElementarySchool1 min walk
- St Michael's Choir School - Choral BldgSchool2 min walk
- St Michael's Choir School - Gymnasium BldgSchool2 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32360.8
- Robberycity median 69.5143.3
- Shootingscity median 10.511.9
- Auto theftcity median 192.675.6
- Theft over $5,000city median 46.199.5
- Break and entercity median 172.8274.7
- Theft from vehiclescity median 188.1390.1
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist