HousePrecheckCheck an address

65 Dundas St EDowntown Yonge East, Toronto · City records before you offer

Commercial residential · CR 4.0 (c2.0; r4.0) SS1 (x2153)26.1 × 29.9 m774 m²on Dundas St Ecorner, also on Bond St

2 things to check before you offer, including building permit open since 2024
N20 m
26.1 m frontage29.9 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 65 Dundas St E

65 Dundas St E is on a 26.1 m by 29.9 m lot on Dundas St E in Downtown Yonge East. The zoning is CR. A site-specific exception, 900.11.10(2153), changes some of the usual rules for this address. The lot also fronts Bond St.

The City has 36 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposed project consists of security system upgrades including cctv coverage throughout both exit stairwells and around the building perimeter, along with…". Status: under review. In 2025, a building permit was filed: "Revision 2 - updated kitchen designrev#1: renovation and conversion of existing hotel building into affordable housing by city of toronto. updated fire…". Status: under review. In 2024, a building permit was filed: "Proposal for renovation and conversion of existing hotel building into affordable housing by city of toronto. scope of work includes renovating the interior…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 12 development applications are open (the tallest up to 71 storeys). Within 300 m, the Committee of Adjustment decided 16 minor variance applications in the last 10 years and approved 94%. TMU station is a 3-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2024ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2153)Moderate
  • 16 by-law investigations closed in the last two yearsLow
  • 12 development applications open within 300 mLowFree check
  • Priority retail street: Dundas Street EastLow
  • 3 City trees in front of this lotLowFree check
  • Downtown Plan Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2024
  • Work or applications in progress
  • 16 by-law investigations closed in the last two years

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2024

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 16 by-law investigations closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

36 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-10-06Building permit
26 250015
Proposed project consists of security system upgrades including CCTV coverage throughout both exit stairwells and around the building perimeter, along with access control upgrades at stairwell and crossover floor doors.Under Review
2026-09-14By-law investigation
26 238076 PRS 00 IV
Notice Issued Prop StandardsClosed
2026-09-14By-law investigation
26 237245 PRS 00 IR
Property StandardsClosed
2026-09-09By-law investigation
26 234226 PRS 00 IR
Property StandardsClosed
2026-05-15By-law investigation
26 161659 PRS 00 IR
Property StandardsClosed
2026-03-30By-law investigation
26 136225 WST 00 IR
WasteClosed
2026-03-15By-law investigation
26 129871 PRS 00 IR
Property StandardsClosed
2026-03-14By-law investigation
26 129589 PRS 00 IR
Property StandardsClosed
2025-12-13By-law investigation
25 266077 PRS 00 IR
Property StandardsClosed
2025-12-13By-law investigation
25 266067 PRS 00 IR
Property StandardsClosed
2025-11-18By-law investigation
25 255350 PRS 00 IR
Property StandardsClosed
2025-08-25By-law investigation
25 215410 GRA 00 IR
GraffitiClosed
2025-06-25By-law investigation
25 184493 PRS 00 IV
Order Issued Property Standards: Supplied hot water is not provided with a temperature range from 45 degrees Celsius to 60 degrees Celsius.Closed
2025-06-25By-law investigation
25 183852 PRS 00 IR
Property StandardsClosed
2025-06-11By-law investigation
25 175353 PRS 00 IR
Property StandardsClosed
2025-05-12By-law investigation
25 157762 PRS 00 IR
Property StandardsClosed
2025-05-12Building permit
22 217753
Revision 2 - Updated kitchen designREV#1: Renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Updated fire separation assemblies as per project requirements.PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.Under Review
2025-04-29By-law investigation
25 151350 PRS 00 IR
Property StandardsClosed
2025-04-25By-law investigation
25 149612 PRS 00 IR
Property StandardsClosed
2025-02-26By-law investigation
25 122258 PRS 00 IR
Property StandardsClosed
2024-05-03Building permit
24 125466
Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior spaces and finishes and associated Mechanical, Electrical and Plumbing services as per the new program requirements. This application is for Phase 03 work only, which includes the work on Level 13 to Level 18 along with penthouse floorClosed
2024-01-31Building permit
23 120734
Proposal to design and install the fire protection systems for the 19 storey building being converted to affordable housing. See related permits 22 217753 BLD (Phase 1), and 23 108352 BLD (Phase 2).Inspection
2023-10-02Building permit
23 209817
* A standpipe system will be installed in accordance with requirements of NBC article 3.2.5.7 to 3.2.5.10.* The standpipe system will be designed, constructed, installed and tested to conform with the requirements of NFPA 14, Installation of Standpipe and Hose System.* A standpipe main feed will be provided for each stairwell located in the northwest and southeast of the building. * A 65mm hose connections will be provided on each stair landing.* A 65mm to 38mm hose valve adapters and fire hoses will be stored in the fire pumps room in basement 2 level.Approved
2023-03-06Building permit
23 108352
PHASE 2 - Level 8 to Level 12Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing. Refer to Permit 22 217753 BLD 0 BA For Phase 1 (Basement 02 to Level 7).Closed
2022-09-21Minor variance
A0918/22TEY
To convert the existing hotel building into an apartment building with a total of 280 affordable housing units.Approved
2022-08-19Zoning review
22 192970 ZAP
No description on fileCancelled
2022-03-01Zoning review
22 118489 ZPR
No description on fileClosed
2014-07-23Building permit
14 195336
Proposal to install 2 backflow prevention devices in an existing hotel - "Bond Place Hotel"Closed
2013-04-22Building permit
13 152765
To erect and display two illuminated wall signs, one on the uppermost storey easterly facing elevation and one between the 17 &18th flr. **Bond Place Hotel**Closed
2013-01-16Zoning review
13 106504 ZSV
No description on fileClosed
2012-09-07Building permit
12 226283
To erect and display two illuminated wall signs, one on the east elevation on Bond St and one on the north elevation on Dundas St. E. Signs are on the first storey and in conjunction with a juice bar & grill.**Pomanar**Closed
2011-08-09Building permit
11 246134
To erect and display one illuminated wall sign with static copy on the north-easterly facing second storey building wall, 3.53 metres wide by 1.18 metres long, at a height of 6.55 metres and in conjunction with an existing hotel located on the premises. **Bond Place Hotel**Closed
2011-05-16Zoning review
11 195752 ZSV
No description on fileClosed
2010-12-20Building permit
10 174846
REVISION TO EXISTING BUILDING PERMIT - REVISION TO REPLACE EXISTING HOLD OPEN DEVICES ON BASEMENT LEVEL OF EXISTING HOTEL SPACE> Proposal for ground floor demolition/additions (total of 11m2), and interior alterations (32m2) for existing hotel "Bond Place Hotel". Also see WNP file 10-165825.Closed
2010-06-21Zoning review
10 201926 LPR
No description on fileClosed
2001-04-25Zoning review
01 035512 ZSV
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2153)
  • Priority retail street: Dundas Street East
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2153)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Dundas Street East

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. 3 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2153)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
26.1 m frontage29.9 m deepon Dundas St E
Zone
CR 4.0 (c2.0; r4.0) SS1 (x2153)
Height limit
—
Corner lot
Yes, also on Bond St
Public lane
None
House footprint
485 m²
Back yard
0.2 m
Buildings on the lot
6

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 12 development applications open within 300 m, up to 71 storeys
    • In the Dundas station area
    • 16 minor variance decisions within 300 m, 94% approved

    What this part means for this house, in plain EnglishUnlock

    1. 12 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • TMU StationNearest station3 min walk
    • Dundas St East at Church StNearest TTC stop2 min walk
    • Shuter StNearest cycling route3 min walk
    • St Michael's Choir School - SecondarySchool1 min walk
    • St Michael's Choir School - ElementarySchool1 min walk
    • St Michael's Choir School - Choral BldgSchool2 min walk
    • St Michael's Choir School - Gymnasium BldgSchool2 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    5 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 65 Dundas St E

    2 things to check at 65 Dundas St E before you offer

    • Building permit open since 2024Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2153)Moderate
    • 16 by-law investigations closed in the last two yearsLow
    • and 5 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 8 steps to take before you offer, so nothing slips
    • What each of the 9 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.