Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 64 Prince Arthur Ave
64 Prince Arthur Ave is on a 26.9 m by 45.1 m lot on Prince Arthur Ave in Annex. The zoning is R. A site-specific exception, 900.2.10(110), changes some of the usual rules for this address.
The City has 15 records on this lot since 2005. That is more than at 99% of Toronto houses. In 2025, a Committee of Adjustment application was filed: "To alter the development standards for a 13-storey mixed-use building with a three-level underground garage (approved by site specific zoning by-law…". Status: closed. In 2025, a building permit was filed: "Proposal to demolish a two storey commercial building to facilitate a new building development of a residential apartment builidng". Status: permit issued. In 2024, a development application was filed: "Zoning by-law amendment application to lift the hold ('h') to by-law 1144-2023". Status: closed. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 6 development applications are open (the tallest up to 36 storeys). St George station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 2 building permits open, the oldest since 2005ModerateFree check
- Work or applications in progressModerateFree check
- Site-specific exception 900.2.10(110)Moderate
- 4 by-law investigations closed in the last two yearsLow
- No permit for a second unit on fileLowFree check
- House demolished in 2025, no new house permit on fileLow
- 6 development applications open within 300 mLowFree check
- 2 City trees in front of this lotLowFree check
- Downtown Plan Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units · Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 building permits open, the oldest since 2005
- Work or applications in progress
- 4 by-law investigations closed in the last two years
What this part means for this house, in plain EnglishUnlock
2 building permits open, the oldest since 2005
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
4 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
15 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-11-12 | Minor varianceA0545/25TEY | To alter the development standards for a 13-storey mixed-use building with a three-level underground garage (approved by Site Specific Zoning By-Law 1144-2023), by increasing the number of storeys and building height from 13-storeys (43 m) to 15-storeys (55 m), increasing the permitted gross floor area, as well as reducing setbacks, minimum separations distances, and the number of parking spaces. A type "C" loading space will be provided and parking space access will be provided by a vehicular elevator. There will be a total of 40 residential dwelling units within the building on the lot. | Approved | |
| 2025-08-18 | By-law investigation25 212426 PRS 00 IV | Order Issued Property Standards: The fence, screen and/or other enclosure around or on the property is not being maintained in good repair.; The yards and /or other part of property is not being kept clean and free from accumulation of junk, rubbish, brush, refuse, litter, garbage and/or other debris | Closed | |
| 2025-08-18 | By-law investigation25 211760 PRS 00 IR | Property Standards | Closed | |
| 2025-05-15 | By-law investigation25 160172 PRS 00 IR | Property Standards | Closed | |
| 2025-05-06 | By-law investigation25 154571 PRS 00 IR | Property Standards | Closed | |
| 2025-05-06 | Zoning review25 154670 ZAP | No description on file | Notice Sent | |
| 2025-04-22 | Building permit24 235775 | Proposal to demolish a two storey commercial building to facilitate a new building development of a residential apartment builidng. | Permit Issued | |
| 2024-04-29 | Development application24 141761 STE 11 OZ | Zoning By-law Amendment application to lift the hold ('H') to By-law 1144-2023. | Closed | |
| 2023-07-28 | Zoning review23 175768 POZ | No description on file | Closed | |
| 2023-07-17 | Development application23 175768 STE 11 OZ | Official Plan and Zoning By-law Amendment application to permit a 13-storey residential building, containing 95 dwelling units. An Official Plan Amendment was requested to ensure the conformity of the proposed built form but was deemed unnecessary. | Closed | |
| 2018-06-13 | Zoning review18 177307 ZPR | No description on file | Closed | |
| 2017-09-08 | Zoning review17 226254 PRZ | No description on file | Closed | |
| 2017-08-31 | Development application17 226254 STE 20 OZ | Zoning By-law Amendment application to facilitate the redevelopment of the site for a 19-storey residential building (height 73 metres): 178 dwelling units, 13,052 sq. m. RGFA, 149 parking spaces. | Closed | |
| 2016-08-03 | Building permit16 197123 | Install one backflow preventor in existing basement mechanical room. | Permit Issued | |
| 2005-04-15 | Building permit05 101330 | Alter plans 05-101330 by making further interior alterations in existing office building. | Inspection |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(110)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(110)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(110)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: likely fits
- Garden suite: likely fits
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d2.0) (x110)
- Height limit
- 14 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 6 development applications open within 300 m, up to 36 storeys
- In the Spadina station area
- 6 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
6 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Theft over $5,000: 2.5 times the Toronto median
- Break and enter: 2.2 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Annex neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St George StationNearest station2 min walk
- St George Station - Northbound PlatformNearest TTC stop2 min walk
- Prince Arthur AveNearest cycling route1 min walk
- The Shire SchoolSchool3 min walk
- Munk School of Global Affairs at the Observatory - U of T, Bldg 89School3 min walk
- School of Continuing Studies - U of T, Bldg 103School5 min walk
- Huron Street Jr Public SchoolSchool5 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.9
- Robberycity median 69.580.5
- Homicidecity median 5.35.2
- Shootingscity median 10.55.2
- Auto theftcity median 192.6116.9
- Theft over $5,000city median 46.1114.3
- Break and entercity median 172.8387.1
- Theft from vehiclescity median 188.1220.9
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist