Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 635 Sheppard Ave E
635 Sheppard Ave E is on a 16.2 m by 61.9 m lot on Sheppard Ave E in Bayview Village. The zoning is RD. A site-specific exception, 900.3.10(5), changes some of the usual rules for this address.
The City has 6 records on this lot since 2021. That is more than at 95% of Toronto houses. In 2025, a development application was filed: "Official plan amendment and zoning by-law amendment application to permit a 30-storey building with residential and commercial uses. the building proposes 351…". Status: under review. In 2022, a development application was filed: "Site plan application to permit a 12-storey (38.35 metre) mixed use building with 145 residential units, a proposed total gross floor area of 10,731.2 square…". Status: under review. In 2021, a development application was filed: "Zoning by-law amendment and an official plan amendment application to permit a 12-storey (38.35 metre) mixed use building with 145 residential units, a…". Status: closed. Nothing on file is open right now.
Within 300 m, 10 development applications are open (the tallest up to 43 storeys). Within 300 m, the Committee of Adjustment decided 4 minor variance applications in the last 10 years and approved 100%. Bessarion station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.3.10(5)Moderate
- 1 by-law investigation closed in the last two yearsLow
- No permit for a second unit on fileLowFree check
- 10 development applications open within 300 mLowFree check
- 1 City tree in front of this lotLowFree check
- Sheppard East Subway Corridor Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units · Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- 1 by-law investigation closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buying
City files on this lot
6 records on file, more than at 95% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-02-27 | Zoning review25 191848 POZ | No description on file | Closed | |
| 2025-07-10 | Development application25 191848 NNY 17 OZ | Official Plan Amendment and Zoning By-law Amendment application to permit a 30-storey building with residential and commercial uses. The building proposes 351 residential units. Vehicle access is from Greenbriar Road, leading to a three level parking garage, containing 97 parking spaces, including 5 parking spaces shared between visitors and the commercial uses. A total of 274 bicycle parking spaces are proposed including 239 long term and 35 short term spaces. The proposed development provides a total GFA of 22,416.70 square metres and a FSI of 11.23. Additionally, the proposed development provides 637.90 square metres of indoor amenity space and 632.40 square metres of outdoor amenity space. | Under Review | |
| 2025-01-14 | By-law investigation25 104565 ZON 00 IR | Zoning | Closed | |
| 2022-09-16 | Zoning review22 196135 PSP | No description on file | Closed | |
| 2022-08-26 | Development application22 196135 NNY 17 SA | Site Plan application to permit a 12-storey (38.35 metre) mixed use building with 145 residential units, a proposed total Gross Floor Area of 10,731.2 square metres 10,327 square metres of residential GFA and 403.5 square metres of commercial space), and a proposed density of 5.35 times the lot area. A total of 78 vehicular parking spaces in two underground parking levels and 125 bicycle parking spaces at-grade and underground are proposed. | Under Review | |
| 2021-08-26 | Development application21 204643 NNY 17 OZ | Zoning By-law Amendment and an Official Plan Amendment application to permit a 12-storey (38.35 metre) mixed use building with 145 residential units, a proposed total Gross Floor Area of 10,731.2 square metres 10,327 square metres of residential GFA and 403.5 square metres of commercial space), and a proposed density of 5.35 times the lot area. A total of 78 vehicular parking spaces in two underground parking levels and 125 bicycle parking spaces at-grade and underground are proposed. | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.3.10(5)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.3.10(5)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Sheppard East Subway Corridor Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.3.10(5)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 4 units: likely fits
- Garden suite: likely fits
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RD (f15.0; a550) (x5)
- Height limit
- 10 m
- Lot coverage limit
- 30%
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 178 m²
- Back yard
- 29.3 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 10 development applications open within 300 m, up to 43 storeys
- In the Bessarion station area
- 4 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
10 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Bayview Village neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Bessarion StationNearest station5 min walk
- Sheppard Ave East at Greenbriar RdNearest TTC stop1 min walk
- Esther Shiner BlvdNearest cycling route12 min walk
- North York LincSchool2 min walk
- St George AcademySchool5 min walk
- Elkhorn Public SchoolSchool6 min walk
- St Gabriel Catholic Elementary SchoolSchool15 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3439.5
- Robberycity median 69.556.6
- Auto theftcity median 192.6139.8
- Theft over $5,000city median 46.149.9
- Break and entercity median 172.8176.4
- Theft from vehiclescity median 188.1169.8
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist