HousePrecheckCheck an address

63 Spencer AveSouth Parkdale, Toronto · City records before you offer

Also 63A Spencer Ave

Residential · R (d2.0) (x811)≈ 19.0 × 61.5 m680 m²on Spencer Ave

4 things to check before you offer, including 1 open order or by-law investigation
N20 m
≈ 19.0 m frontage≈ 61.5 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 63 Spencer Ave

63 Spencer Ave is on a 19 m by 61.5 m lot on Spencer Ave in South Parkdale. The zoning is R. A site-specific exception, 900.2.10(811), changes some of the usual rules for this address.

The City has 18 records on this lot since 1993. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Proposal for interior alterations - removal of non load bearing wall". Status: examiner's notice sent. In 2025, a building permit was filed: "Proposal for interior alteration and construct (new fire separated front vestibule enclosure) in the ground floor for this residential care facility". Status: permit issued. In 2019, a building permit was filed: "Revision #01 - changes to partition walls, exterior wall assemblies, basement partition removed, strucural upgrades for new double studded wall in basement and…". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection. There is 1 open order or by-law investigation on file. Ask the seller what is outstanding and whether it will be fixed before closing.

Within 300 m, 3 development applications are open (the tallest up to 10 storeys). Within 300 m, the Committee of Adjustment decided 21 minor variance applications in the last 10 years and approved 100%. Exhibition GO station is a 15-minute walk.

Summary

What the City's records show on this house

  • 1 open order or by-law investigationSerious
  • Building permit open since 2018ModerateFree check
  • Multi-tenant (rooming) house licence: ActiveModerate
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.2.10(811)Moderate
  • 7 by-law investigations closed in the last two yearsLow
  • No permit for a second unit on fileLowFree check
  • 3 development applications open within 300 mLowFree check
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 6 units · Garden suite

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

4 things to check before you offer, 1 of them serious.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Serious

Open City files

How much in the City's records needs answers before an offer

  • 1 open order or by-law investigation
  • Building permit open since 2018
  • Multi-tenant (rooming) house licence: Active

What this part means for this house, in plain EnglishUnlock

  1. 1 open order or by-law investigation

    SeriousCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Building permit open since 2018

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. Multi-tenant (rooming) house licence: Active

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  4. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  5. 7 by-law investigations closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  6. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  7. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

18 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-08-28Building order
26 227793 WNP 00 VI
Order Issued No Permit: Sprinkler system installed without a building permitOrder Issued
2026-06-11By-law investigation
26 183284 RMH 00 IV
Notice Issued Rooming HouseClosed
2026-06-11By-law investigation
26 182344 RMH 00 IR
Rooming HouseClosed
2025-10-31By-law investigation
25 255092 PRS 00 IV
Order Issued Property Standards: The floor and every appurtenance, surface cover and finish is not maintained. Namely: 3 tiles cracked. Door entering 2nd floor. Another door leading to room 1, ; The floor and every appurtenance, surface cover and finish is not maintained. Namely: tile cracked, door leading to main floor rooms, 3 tiles cracked.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.Namely: Beside room 13. Wall, tile cracked and hole.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.Namely: stairs leading to 2nd floor, right side of the wall.Closed
2025-10-31By-law investigation
25 247747 PRS 00 IR
Property StandardsClosed
2025-07-11By-law investigation
25 192608 PRS 00 IR
Property StandardsClosed
2025-02-18By-law investigation
25 117936 RMH 00 IR
Rooming HouseClosed
2025-01-30Building permit
25 110795
Proposal for interior alterations - removal of non load bearing wall.Examiner's Notice Sent
2025-01-24Building permit
24 145557
Proposal for interior alteration and construct (new fire separated front vestibule enclosure) in the ground floor for this residential care facilityPermit Issued
2024-12-24By-law investigation
24 253341 PRS 00 IR
Property StandardsClosed
2019-08-02Building permit
18 231080
Revision #01 - Changes to partition walls, exterior wall assemblies, basement partition removed, strucural upgrades for new double studded wall in basement and new single joist instead of double joists to single joists on all floors. Proposal for interior alterations to convert existing residential building to 22-unit, residential care facility. Scope also includes stairs.Closed
2018-09-05Building permit
17 272932
Proposal for interior alterations to convert existing residential building at rear to 15-unit, 3-storey residential care facility. Scope also includes exterior fire escape stairs. Convenience address is 63 A Spencer Ave.Inspection
2017-03-01Minor variance
A1148/16TEY
To convert the existing residential building and the existing coach house into residential care facilities.Approved
2016-09-20Zoning review
16 225833 ZPR
No description on fileCancelled
2016-07-26Zoning review
16 197066 ZPR
No description on fileClosed
2016-05-12Zoning review
16 154533 ZZC
No description on fileCancelled
2002-11-21Building permit
02 107548
accepted application under the parkdale pilot project PRINTED CARDClosed
1993-07-09Building permit
93 015676
MAKE ALTERATIONS. FEES COLLECTED UNDER PERMIT 324626Closed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.2.10(811)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.2.10(811)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.2.10(811)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Some

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 6 units: likely fits
  • Garden suite: likely fits
  • Secondary suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 6 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  2. Garden suite

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N20 m
≈ 19.0 m frontage≈ 61.5 m deepon Spencer Ave
Zone
R (d2.0) (x811)
Height limit
23 m
Corner lot
No
Public lane
None
New house permit
None since 2000
House footprint
172 m²
Back yard
24 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Busy

Building nearby

How much neighbours are building and applying to change within 300 m

  • 3 development applications open within 300 m, up to 10 storeys
  • 24 suite and multiplex permits within 300 m in 10 years
  • 21 minor variance decisions within 300 m, 100% approved

What this part means for this house, in plain EnglishUnlock

  1. 3 development applications open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 5 of 8 categories
  • Assault: 1.8 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

South Parkdale neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$57,200median $84,500
Households that own their home15%median 54%
Population (2021)20,495median 16,813
Homes built in 1960 or before37%median 29%
Homes needing major repairs11%median 7%

Getting around and schools

  • Exhibition GO StationNearest station15 min walk
  • King St West at Spencer AveNearest TTC stop3 min walk
  • Dufferin StNearest cycling route8 min walk
  • Dr Rita Cox - Kina Minagok Public SchoolSchool7 min walk
  • Holy Family Catholic Elementary SchoolSchool8 min walk
  • Parkdale Collegiate InstituteSchool10 min walk
  • Parkdale Jr & Sr Public SchoolSchool15 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.31140.3
  • Robberycity median 69.568.6
  • Homicidecity median 5.33.8
  • Shootingscity median 10.57.6
  • Auto theftcity median 192.672.5
  • Theft over $5,000city median 46.145.8
  • Break and entercity median 172.8240.3
  • Theft from vehiclescity median 188.1205.9

More about South Parkdale

Ready emails

Copy and send as they are.

9 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 63 Spencer Ave

4 things to check at 63 Spencer Ave before you offer

  • 1 open order or by-law investigationSerious
  • Building permit open since 2018Moderate
  • Multi-tenant (rooming) house licence: ActiveModerate
  • Work or applications in progressModerate
  • and 5 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 8 steps to take before you offer, so nothing slips
  • What each of the 9 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.