Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 626 Manning Ave
626 Manning Ave is on a 7.4 m by 36.9 m lot on Manning Ave in Palmerston-Little Italy. The zoning is R. A site-specific exception, 900.2.10(735), changes some of the usual rules for this address. The lot also fronts Lennox St.
The City has 7 records on this lot since 2020. That is more than at 97% of Toronto houses. In 2025, a building permit was filed: "Proposed laneway suite and plumbing with underground services". Status: work not started. In 2022, a building permit was filed: "Proposed new three storey rear addition, a new rear deck with stairs, a new front yard basement walkout staircase, carry out underpinning of the existing…". Status: work not started. In 2021, a Committee of Adjustment application was filed: "To alter the existing two-and-one-half-storey semi-detached dwelling by constructing: a third floor front addition; a front basement walkout; a rear…". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Christie station is a 4-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2022ModerateFree check
- Work or applications in progressModerateFree check
- Records mention laneway suite, multiplex, second unitModerateFree check
- Site-specific exception 900.2.10(735)Moderate
- Registered short-term rentalModerate
- 1 by-law investigation closed in the last two yearsLow
- 1 City tree in front of this lotLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2022
- Work or applications in progress
- Records mention laneway suite, multiplex, second unit
What this part means for this house, in plain EnglishUnlock
Building permit open since 2022
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention laneway suite, multiplex, second unit
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
Registered short-term rental
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
7 records on file, more than at 97% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-03-31 | By-law investigation26 137311 ZON 00 IR | Zoning | Closed | |
| 2025-02-05 | Building permit22 212252 | Proposed laneway suite and plumbing with underground services | Work Not Started | |
| 2022-07-05 | Building permit22 159928 | Proposed new three storey rear addition, a new rear deck with stairs, a new front yard basement walkout staircase, carry out underpinning of the existing foundation walls and carry out interior alterations throughout the existing dwelling to add a new secondary suite to the existing semi-detached dwelling containing two dwelling units. | Work Not Started | |
| 2021-12-01 | Minor varianceA0799/21TEY | To alter the existing two-and-one-half-storey semi-detached dwelling by constructing: a third floor front addition; a front basement walkout; a rear three-storey addition; and a rear three-storey deck. This dwelling will contain a total of 4 residential units. Also, to construct a two-storey detached ancillary building in the rear yard (abutting the laneway) that will contain a laneway suite. Overall, a total of 5 residential units will be on this lot. | Approved | |
| 2021-05-18 | Zoning review21 156582 ZZC | No description on file | Closed | |
| 2021-04-08 | Zoning review21 137369 ZZC | No description on file | Closed | |
| 2020-10-21 | Zoning review20 209356 ZZC | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(735)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(735)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(735)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, laneway suite, second unit
- Garden suite: likely fits
What this part means for this house, in plain EnglishUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6) (x735)
- Height limit
- 11 m
- Corner lot
- Yes, also on Lennox St
- Public lane
- Rosie Ienco Lane, 7.2 m along it
- New house permit
- None since 2000
- House footprint
- 99 m²
- Back yard
- 19.9 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- In the Christie station area
- 45 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 7 categories
- Robbery: 1.6 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Palmerston-Little Italy neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Christie StationNearest station4 min walk
- Bloor St West at Manning AveNearest TTC stop2 min walk
- Bloor St WNearest cycling route2 min walk
- Harbord Collegiate InstituteSchool4 min walk
- West End Alternative SchoolSchool5 min walk
- City As School TorontoSchool7 min walk
- Montrose Jr & Delta Alternative SrSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3654.6
- Robberycity median 69.5113.8
- Shootingscity median 10.57.1
- Auto theftcity median 192.6113.8
- Theft over $5,000city median 46.128.5
- Break and entercity median 172.8256.2
- Theft from vehiclescity median 188.1142.3
Ready emails
Copy and send as they are.
7 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist