HousePrecheckCheck an address

619 Evans AveAlderwood, Toronto · City records before you offer

Residential townhouse · RT (x70)18.2 × 8.2 m138 m²on Evans Ave

1 thing to check before you offer, including 5 building permits open, the oldest since 2002
N5 m
18.2 m frontage8.2 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 619 Evans Ave

619 Evans Ave is on a 18.2 m by 8.2 m lot on Evans Ave in Alderwood. The zoning is RT. A site-specific exception, 900.5.10(70), changes some of the usual rules for this address.

The City has 78 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2002, a building permit was filed: "Townhouse. unit 35. block 5". Status: closed. In 2002, a building permit was filed: "Townhouse. unit 18. block 3". Status: closed. In 2002, a building permit was filed: "Townhouse. unit 17. block 3". Status: closed. 5 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 3 minor variance applications in the last 10 years and approved 100%. The nearest TTC stop is 620 Evans Ave, a 1-minute walk.

Summary

What the City's records show on this house

  • 5 building permits open, the oldest since 2002ModerateFree check
  • Site-specific exception 900.5.10(70)Moderate
  • No permit for a second unit on fileLowFree check
  • 37 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 4 units

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • 5 building permits open, the oldest since 2002
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. 5 building permits open, the oldest since 2002

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. 37 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

78 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2003-01-09Consent (lot split)
B37/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B36/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B35/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B34/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B33/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B32/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B31/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B30/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B28/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B27/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B26/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B25/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B24/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B23/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B22/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B21/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B20/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B12/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B11/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B10/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B9/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B8/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B7/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B6/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B5/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B3/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B2/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B4/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B18/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B17/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B15/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B14/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B13/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B16/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B19/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B29/03E
To obtain consent to sever the lot into a total of 37 townhouse lots, with various easements/rights-of-ways.Approved
2003-01-09Consent (lot split)
B1/03E
To obtain consent to sever the lot into a total of 37 lots (36 townhouse lots and 1 single family dwelling lot), with various easements/rights-of-ways.Approved
2002-10-25Building permit
02 112369
Townhouse. Unit 35. Block 5.Closed
2002-10-25Building permit
02 112352
Townhouse. Unit 18. Block 3.Closed
2002-10-25Building permit
02 112351
Townhouse. Unit 17. Block 3.Closed
2002-10-25Building permit
02 112350
HVAC - Townhouse. Unit 16. Block 2. - New BuildingClosed
2002-10-25Building permit
02 112349
Townhouse. Unit 15. Block 2.Closed
2002-10-25Building permit
02 112348
Townhouse. Unit 14. Block 2.Closed
2002-10-25Building permit
02 112347
Townhouse. Unit 13. Block 2.Closed
2002-10-25Building permit
02 112346
Townhouse. Unit 12. Block 2.Closed
2002-10-25Building permit
02 112345
Townhouse. Unit 11. Block 2.Closed
2002-10-25Building permit
02 112344
Townhouse. Unit 10. Block 2.Closed
2002-10-25Building permit
02 112343
Townhouse. Unit 9. Block 2.Closed
2002-10-25Building permit
02 112342
Townhouse. Unit 8. Block 1.Closed
2002-10-25Building permit
02 112341
Townhouse. Unit 7. Block 1.Closed
2002-10-25Building permit
02 112340
Townhouse. Unit 6. Block 1.Closed
2002-10-25Building permit
02 112339
Townhouse. Unit 5. Block 1.Closed
2002-10-25Building permit
02 112338
Townhouse. Unit 4. Block 1.Closed
2002-10-25Building permit
02 112337
Townhouse. Unit 3. Block 1.Closed
2002-10-25Building permit
02 112336
Townhouse. Unit 2. Block 1.Closed
2002-10-25Building permit
02 112335
Townhouse. Block 1 units 1-8, LEAD BUILDING FILE FOR ALL CLEARANCES/HOLDS ON PERMITS 02-112335 - 112371Closed
2002-10-25Building permit
02 112371
HVAC - New single family dwelling - New BuildingClosed - Dormant
2002-10-25Building permit
02 112370
HVAC - Townhouse. Unit 36. Block 5. - New BuildingClosed - Dormant
2002-10-25Building permit
02 112368
HVAC - Townhouse. Unit 34. Block 5. - New BuildingClosed - Dormant
2002-10-25Building permit
02 112367
HVAC - Townhouse. Unit 33. Block 5. - New BuildingClosed - Dormant
2002-10-25Building permit
02 112366
HVAC - Townhouse. Unit 32. Block 4. - New BuildingClosed - Dormant
2002-10-25Building permit
02 112365
HVAC - Townhouse. Unit 31. Block 4. - New BuildingClosed - Dormant
2002-10-25Building permit
02 112364
HVAC - Townhouse. Unit 30. Block 4. - New BuildingClosed - Dormant
2002-10-25Building permit
02 112363
HVAC - Townhouse. Unit 29. Block 4. - New BuildingClosed - Dormant
2002-10-25Building permit
02 112362
HVAC - Townhouse. Unit 28.Block 4. - New BuildingClosed - Dormant
2002-10-25Building permit
02 112361
HVAC - Townhouse. Unit 27.Block 3. - New BuildingInspection
2002-10-25Building permit
02 112360
HVAC - Townhouse. Unit 26. Block 3. - New BuildingClosed - Dormant
2002-10-25Building permit
02 112359
HVAC - Townhouse. Unit 25. Block 3. - New BuildingClosed - Dormant
2002-10-25Building permit
02 112358
HVAC - Townhouse. Unit 24. Block 3. - New BuildingInspection
2002-10-25Building permit
02 112357
HVAC - Townhouse. Unit 23. Block 3. - New BuildingInspection
2002-10-25Building permit
02 112356
HVAC - Townhouse. Unit 22. Block 3. - New BuildingInspection
2002-10-25Building permit
02 112355
HVAC - Townhouse. Unit 21. Block 3. - New BuildingInspection
2002-10-25Building permit
02 112354
HVAC - Townhouse. Unit 20. Block 3. - New BuildingClosed - Dormant
2002-10-25Building permit
02 112353
HVAC - Townhouse. Unit 19. Block 3. - New BuildingClosed - Dormant
2002-05-10Building permit
02 118588
Site services for new townhouses.Closed - Dormant
2002-03-28Zoning review
02 122491 ZPR
No description on fileClosed
2002-02-27Building permit
02 113933
Townhouse. Unit 1. Block 1. LEAD FILE.CONTAINS ALL CLEARANCES & HOLDS FOR BLOCK 1, UNITS 1-8.Cancelled
2002-02-06Building permit
02 100481
Demolition of a hotel. (1500sq.m gfa)Closed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.5.10(70)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.5.10(70)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.5.10(70)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Limited

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 4 units: likely fits
  • Secondary suite: likely fits
  • No public lane, so no laneway suite

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 4 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N5 m
18.2 m frontage8.2 m deepon Evans Ave
Zone
RT (x70)
Height limit
—
Lot coverage limit
25%
Corner lot
No
Public lane
None
New house permit
2002
House footprint
70 m²
Back yard
0.2 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Quiet

Building nearby

How much neighbours are building and applying to change within 300 m

  • 0 development applications within 300 m in 10 years, none open
  • 3 minor variance decisions within 300 m, 100% approved

What this part means for this house, in plain EnglishUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 3 of 7 categories
  • Theft over $5,000: 2.3 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Alderwood neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$106,000median $84,500
Households that own their home77%median 54%
Population (2021)12,595median 16,813
Homes built in 1960 or before54%median 29%
Homes needing major repairs5%median 7%

Getting around and schools

  • Long Branch GO StationNearest station34 min walk
  • 620 Evans AveNearest TTC stop1 min walk
  • Etobicoke Creek TrlNearest cycling route12 min walk
  • St Ambrose Catholic Elementary SchoolSchool3 min walk
  • Lanor Jr Mdl SchoolSchool7 min walk
  • Sir Adam Beck Jr SchoolSchool15 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3508.1
  • Robberycity median 69.569.6
  • Shootingscity median 10.57
  • Auto theftcity median 192.6222.7
  • Theft over $5,000city median 46.1104.4
  • Break and entercity median 172.8201.9
  • Theft from vehiclescity median 188.1132.2

More about Alderwood

Ready emails

Copy and send as they are.

2 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 619 Evans Ave

1 thing to check at 619 Evans Ave before you offer

  • 5 building permits open, the oldest since 2002Moderate
  • Site-specific exception 900.5.10(70)Moderate
  • No permit for a second unit on fileLow
  • 37 Committee of Adjustment files on this lotLow

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 6 steps to take before you offer, so nothing slips
  • What each of the 4 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.