HousePrecheckCheck an address

60 Soudan AveToronto · zoning, lot size and permit records

Residential · R (d2.0) (x689)5.4 × 30.5 m163 m²on Soudan Avecorner, also on Holly St

Not a home

Raccoon Park Expansion (60 Soudan)

The City of Toronto's real estate inventory lists Raccoon Park Expansion (60 Soudan) here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 25 237906 (Proposal for site servicing in relation to Raccoon Park Extension, 2025); 24 217978 (Demolish the existing two storey dwelling for City Parkland Dedication, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 15 development applications open within 300 m, up to 70 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: EglintonThe City plans more homes around the station: good for transit, and more building over time.
N10 m
5.4 m frontage30.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 237906 (Proposal for site servicing in relation to Raccoon Park Extension, 2025); 24 217978 (Demolish the existing two storey dwelling for City Parkland Dedication, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 15 development applications open within 300 m

    Good to know

    15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 70 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit25 237906Inspection

    Proposal for site servicing in relation to Raccoon Park Extension

    Nov 26, 2025 · 60 SOUDAN AVE
  • By-law investigation25 194384 LGW 00 IRClosed

    Long Grass and Weeds

    Jul 15, 2025 · 60 SOUDAN AVE
  • Building permit24 217978Inspectiondemolition

    Demolish the existing two storey dwelling for City Parkland Dedication

    Jan 22, 2025 · 60 SOUDAN AVE

Check before you build

  • Site-specific exception 900.2.10(689)

    Needs a closer look

    A Chapter 900 exception applies here, but its text was not found in the City's consolidation of the by-law. Read it before relying on the rest of this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(689)Check

The exception text was not found in the City's consolidation.

Lot facts

Area
163 m²
Frontage
5.4 m
Depth
30.5 m
Street
Soudan Ave
Corner lot
Yes, also on Holly St30.5 m along it
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
14 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Eglinton. The lot is inside the Eglinton Major Transit Station Area approved by the Province (Site and Area Specific Policy 723). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d2.0) (x689) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: mountain ash, oak leaf (41 cm), honey locust (41 cm), honey locust (28 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%22 of 22 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
3
Development applications
37

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three- storey detached dwelling (basement level is considered the first storey) by constructing a complete fourth storey addition, a rear two- storey addition (cantilevered at the southwest corner, including a basement addition below), a rear first floor covered (pergola) deck with stairs and a lift, and a rear patio and basement walkout. Also, to convert the existing rear one-storey ancillary building (detached garage) into a storage area with a ground floor deck, a covered (pergola) side (north) entrance, and a complete second storey addition containing one garden suite. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling, and one unit within the ancillary building).

    16 SERVINGTON CRES · Aug 19, 2026 · 371 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a front (north) two-storey addition with a porch and stairs, a side (west) rotunda staircase, a side (east) second storey balcony, and a rear (south) two-storey addition above the integral garage extension (located within the basement level), abutting Wilfrid Avenue.

    36 WILFRID AVE · Aug 12, 2026 · 398 m away
  • Minor varianceRefused

    To construct a new undersized front yard parking pad, abutting Carey Road. The existing three-storey detached dwelling on the lot will be maintained and unaltered.

    26 CAREY RD · Feb 4, 2026 · 309 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear (south) two-storey addition with a deck and stairs, and a side (west) entrance (abutting Duplex Avenue). The existing rear deck will be demolished.

    53 MANOR RD W · Jan 21, 2026 · 444 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front porch, a rear basement walkout, and a rear second level deck.

    78 HILLSDALE AVE E · Jun 11, 2025 · 107 m away

Latest activity nearby

  • Building permit

    Proposal to add retractable glazing to existing condo balcony.

    2181 YONGE ST · Nov 26, 2026 · 130 m away
  • Building permit

    Rev 01: Revision to permit.Proposal for interior alterations to existing office suite at 4th floor

    20 HOLLY ST · Nov 26, 2026 · 58 m away
  • Building permit

    One wall sign***MIDTOWN ORAL & MAXILLOFACIAL SURGERY***

    57 SOUDAN AVE · Nov 23, 2026 · 52 m away
  • Building permit

    Revision 01 - Building renovation including interior alterations at basement level, ground floor lobby level and 3rd floor. Project scope also includes elevator modernization, curtain wall modernization.) All changes bubbled on plans and described in a covering memo.Building renovation including interior alterations at basement level, ground floor lobby level and 3rdfloor. Project scope also includes elevator modernization, curtain wall modernization. No new floorarea is proposed.

    2180 YONGE ST · Nov 23, 2026 · 198 m away
  • Building permit

    Revision #1 - Building renovation including interior demolition, core and shell commercial space, replacement of the east elevation façade and roof repair. Changes bubbled on plans and cover memo outline nature of changes.Proposed building renovation including interior demolition, core and shell commercial space, replacement of the east elevation façade and roof repair. No new floor area is proposed.

    2190 YONGE ST · Nov 23, 2026 · 245 m away
  • Building permit

    Remove and dispose of existing non-compliant guards and handrails, including top landing guards, stair guards, and wall-mounted handrails. Install new code-compliant guards and handrails at two existing staircases.

    50-60 HOLLY ST · Nov 17, 2026 · 126 m away
  • Building permit

    One wall sign***MIDTOWN ORAL & MAXILLOFACIAL SURGERY***

    57 SOUDAN AVE · Nov 16, 2026 · 52 m away
  • Building permit

    1 wall sign + 2 overhanging structure signs**GIORGETTI**

    2112 YONGE ST · Nov 16, 2026 · 290 m away
  • Zoning review

    Not Started

    2128 YONGE ST · Nov 12, 2026 · 248 m away
  • Building permit

    1 Wall Sign***AZITA BEAUTY SALON***

    2146 YONGE ST · Nov 12, 2026 · 225 m away

Neighbourhood: South Eglinton-Davisville

About the area around the lot, not the lot itself.

Nearest station
Eglinton Station5 min walk
Nearest TTC stop
Opposite 2190 Yonge St3 min walk
Nearest cycling route
Eglinton Ave ECycle Track, 4 min walk
Nearest traffic count
15,275 vehicles in 14 hYonge St / Soudan Ave, 180 m away, Oct 6, 2026
Serious collisions within 500 m
52021–2026, killed or seriously injured: 3 fatal, 3 with pedestrians, 0 with cyclists
Parks
Raccoon Park1 min walk
Hillsdale Avenue Park1 min walk
Dunfield Park2 min walk

Schools within 1 km

  • EGLINTON LINC AND ESL CENTRE English Separate 5 min walk
  • CAESAR INTERNATIONAL ACADEMY Private 5 min walk
  • CAREERQUEST Private 6 min walk
  • WILLOWDALE HIGH SCHOOL Private 6 min walk
  • THE STUDY ACADEMY SCHOOL Private 6 min walk
  • THE STUDY ACADEMY Private 7 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth Eglinton-DavisvilleMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home30%54%
Population (2021)22,73516,813
Homes built in 1960 or before11%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth Eglinton-DavisvilleCity median
Assault436636.3
Robbery24.269.5
Auto theft58.8192.6
Theft over $5,00020.846.1
Break and enter128172.8
Theft from vehicles100.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.