Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 6 Queen's Dr
6 Queen's Dr is on a 13.4 m by 39.4 m lot on Queen's Dr in Weston. The zoning is RD.
The City has 4 records on this lot since 2022. That is more than at 88% of Toronto houses. In 2026, a building permit was filed: "Rev 01: adding fourth unit to basement, the following chances were made and only the revised drawings were sent with this application: 1. the basement was…". Status: revision issued. In 2023, a building permit was filed: "Proposal to construct a garden suite in the back yard". Status: inspection. In 2022, a zoning review was filed. Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 2 development applications are open (the tallest up to 42 storeys). Within 300 m, the Committee of Adjustment decided 32 minor variance applications in the last 10 years and approved 97%. Weston GO station is a 7-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2023ModerateFree check
- Work or applications in progressModerateFree check
- Records mention garden suite, multiplexModerateFree check
- 2 development applications open within 300 mLowFree check
- Site and Area Specific Policy 051Low
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2023
- Work or applications in progress
- Records mention garden suite, multiplex
What this part means for this house, in plain EnglishUnlock
Building permit open since 2023
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention garden suite, multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buying
City files on this lot
4 records on file, more than at 88% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-08-18 | Building permit24 145844 | Rev 01: ADDING FOURTH UNIT TO BASEMENT, THE FOLLOWING CHANCES WERE MADE AND ONLY THE REVISED DRAWINGS WERE SENT WITH THIS APPLICATION: 1. THE BASEMENT WAS DESIGNED TO BE A SEPARATE UNIT FROM THE GROUND FLOOR UNIT, THEREFORE THE REQUIRED FIRE SEPARATIONS, AND MEANS OF EGRESS, WERE ADDED TO THE DESIGN. 2 THE CFM MECH UNITS IN THE BASEMENT WERE INSTALLED ON THE CEILING INSTEAD OF THE WALLS. 3, THE INSULATION ON THE BASEMENT EXTERIOR WALLS ( INSIDE INSULATION) WAS CHANGED TO HIGH DENSITY SPRAY INSULATION. 4, THE CEILING HEIGHT OF THE BASEMENT WAS INCREASED ( THE OVERALL HEIGHT OF THE BUILDING DIDN'T CHANGE) . ALL CHANGES ARE BUBBLED IN THE ATTACHED DRAWINGS . THE REST OF THE DESIGN HAS NOT CHANGED. The proposed addition at the rear, proposed triplex. | Revision Issued | |
| 2023-08-02 | Building permit23 106795 | Proposal to rebuild existing rear addition, basement walkout, second floor balcony, underpin existing basement and construct interior alterations to the existing dwelling. | Cancelled | |
| 2023-07-14 | Building permit23 114421 | Proposal to construct a garden suite in the back yard | Inspection | |
| 2022-07-26 | Zoning review22 182305 ZAP | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Site and Area Specific Policy 051
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, garden suite
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- RD (f12.0; a370; d0.4)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 138 m²
- Back yard
- 19.6 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 2 development applications open within 300 m, up to 42 storeys
- 23 suite and multiplex permits within 300 m in 10 years
- 32 minor variance decisions within 300 m, 97% approved
What this part means for this house, in plain EnglishUnlock
2 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 7 categories
- Shootings: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Weston neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Weston GO StationNearest station7 min walk
- Church St at Grattan StNearest TTC stop5 min walk
- Humber River Recreational TrlNearest cycling route8 min walk
- St John the Evangelist Catholic Elementary SchoolSchool4 min walk
- H J Alexander Community SchoolSchool5 min walk
- Islamic Education Guidance CentreSchool5 min walk
- Gap Academy Secondary SchoolSchool5 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3875.5
- Robberycity median 69.531.6
- Shootingscity median 10.518.1
- Auto theftcity median 192.6239.2
- Theft over $5,000city median 46.136.1
- Break and entercity median 172.8180.5
- Theft from vehiclescity median 188.1135.4
Ready emails
Copy and send as they are.
6 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist