Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 595 Eglinton Ave E
595 Eglinton Ave E is on a 6.2 m by 17.2 m lot on Eglinton Ave E in Mount Pleasant East. The zoning is R. A site-specific exception, 900.2.10(943), changes some of the usual rules for this address.
The City has 3 records on this lot since 2003. That is more than at 81% of Toronto houses. In 2026, a building permit was filed: "Proposal to demolish 61-65 mann avenue & 589-595 eglinton e and construct 35-storey mixed-use building, including residential and commercial components.see…". Status: permit issued. In 2022, a development application was filed: "Proposal for a 40 storeys mixed-use building, including residential and commercial components. the building will contain a total of 465residential units and…". Status: omb approved. In 2003, a zoning review was filed. Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 20 development applications are open (the tallest up to 46 storeys). Leaside station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.2.10(943)Moderate
- No permit for a second unit on fileLowFree check
- House demolished in 2026, no new house permit on fileLow
- 20 development applications open within 300 mLowFree check
- Yonge-Eglinton Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buying
City files on this lot
3 records on file, more than at 81% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-01-14 | Building permit24 243646 | Proposal to demolish 61-65 Mann Avenue & 589-595 Eglinton E and construct 35-storey mixed-use building, including residential and commercial components.See also 25-111851 BLD 00 NB | Permit Issued | |
| 2022-11-04 | Development application22 225964 NNY 15 OZ | Proposal for a 40 storeys mixed-use building, including residential and commercial components. The building will contain a total of 465residential units and 564 m2 of retail space fronting Eglinton Avenue East. The residential GFA is 27,719.8 m2. resulting 14.36 FSI. Total of 118 parking spaces will be provided. | OMB Approved | |
| 2003-09-08 | Zoning review03 172515 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(943)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(943)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Yonge-Eglinton Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(943)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 4 units: likely fits
- Secondary suite: likely fits
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d2.0) (x943)
- Height limit
- 18 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 20 development applications open within 300 m, up to 46 storeys
- In the Leaside station area
- 10 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
20 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Mount Pleasant East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Leaside StationNearest station2 min walk
- Eglinton Ave East at Bayview AveNearest TTC stop1 min walk
- Broadway AveNearest cycling route5 min walk
- Leaside High SchoolSchool7 min walk
- Children's Garden Junior SchoolSchool7 min walk
- Polaris Learning Centre SchoolSchool10 min walk
- Maurice Cody Jr Public SchoolSchool11 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3336.5
- Robberycity median 69.510.2
- Auto theftcity median 192.6224.4
- Theft over $5,000city median 46.145.9
- Break and entercity median 172.8204
- Theft from vehiclescity median 188.1107.1
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist