Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 59 Elm St
59 Elm St is on a 4.7 m by 25.4 m lot on Elm St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(1319), changes some of the usual rules for this address. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.
The City has 8 records on this lot since 2008. That is more than at 98% of Toronto houses. In 2026, a development application was filed: "Proposed 18 storey building containing 234 hotel suites and retail space". Status: under review. In 2019, a building permit was filed: "Proposal for the demolition of exisitng 3 storey row/town house building with 1 existing residential unit". Status: under review. In 2014, a building permit was filed: "To erect and display one wall sign and one projecting sign on the easterly elevation of building wall. both signs are illuminated and in conjunction with a…". Status: closed. Nothing on file is open right now.
Within 300 m, 16 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 12 minor variance applications in the last 10 years and approved 92%. TMU station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Heritage property: listedModerate
- Site-specific exception 900.11.10(1319)Moderate
- 1 by-law investigation closed in the last two yearsLow
- 16 development applications open within 300 mLowFree check
- Priority retail street: Bay StreetLow
- 2 City trees in front of this lotLowFree check
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- 1 by-law investigation closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
8 records on file, more than at 98% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-01-07 | Development application26 101832 STE 11 OZ | Proposed 18 storey building containing 234 hotel suites and retail space. | Under Review | |
| 2025-12-15 | By-law investigation26 133985 GRA 00 IV | Notice Issued Graffiti | Prosecution Initiated | |
| 2025-12-15 | By-law investigation25 266207 GRA 00 IR | Graffiti | Prosecution Initiated | |
| 2025-07-25 | By-law investigation25 199712 PRS 00 IR | Property Standards | Closed | |
| 2019-05-10 | Building permit19 152573 | Proposal for the demolition of exisitng 3 storey ROW/TOWN HOUSE building with 1 existing residential unit. | Under Review | |
| 2014-04-15 | Building permit14 133005 | To erect and display one wall sign and one projecting sign on the easterly elevation of building wall. Both signs are illuminated and in conjunction with a hotel. **650 Hotel** | Closed | |
| 2012-03-02 | Building permit12 121620 | To erect and display two illuminated, double-sided projecting signs, one on Elm St. and the other on Bay St, in conjunction with a gourmet restaurant.**Sliced** | Closed | |
| 2008-12-17 | Zoning review08 230388 LPR | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: listed
- Site-specific exception 900.11.10(1319)
- Priority retail street: Bay Street
What this part means for this house, in plain EnglishUnlock
Heritage property: listed
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(1319)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Bay Street
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
2 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(1319)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 7.8 (c2.0; r7.8) SS1 (x1319)
- Height limit
- 61 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 67 m²
- Back yard
- 8.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 16 development applications open within 300 m, up to 85 storeys
- In the College station area
- 12 minor variance decisions within 300 m, 92% approved
What this part means for this house, in plain EnglishUnlock
16 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 8 categories
- Assault: 5.3 times the Toronto median
- Theft over $5,000: 4.6 times the Toronto median
- Robbery: 4.3 times the Toronto median
- Break and enter: 3.2 times the Toronto median
- Homicide: 2.3 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-Bay Corridor neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- TMU StationNearest station5 min walk
- Bay St at Elm StNearest TTC stop1 min walk
- Bay StNearest cycling route1 min walk
- Toronto Metropolitan University - Entr To Business School LobbySchool4 min walk
- Tmu - Heaslip HouseSchool6 min walk
- Toronto Metropolitan University - School of Image ArtsSchool7 min walk
- Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.33361.1
- Robberycity median 69.5300.1
- Homicidecity median 5.312
- Shootingscity median 10.512
- Auto theftcity median 192.6162.1
- Theft over $5,000city median 46.1210.1
- Break and entercity median 172.8552.2
- Theft from vehiclescity median 188.1402.1
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist