Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 575 Yonge St
575 Yonge St is on a 6.2 m by 38.7 m lot on Yonge St in Church-Wellesley. The zoning is CR. A site-specific exception, 900.11.10(2546), changes some of the usual rules for this address. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.
The City has 18 records on this lot since 2000. That is more than at 99% of Toronto houses. In 2017, a building permit was filed: "Backflow prevention device". Status: closed. In 2016, a building permit was filed: "In conjunction with a two storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy on the first storey…". Status: closed. In 2013, a building permit was filed: "Hvac - proposal for interior renovation to existing basement and ground floor of existing building for a cafe (74.8m2)". Status: inspection. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 22 development applications are open (the tallest up to 76 storeys). Wellesley station is a 1-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2013ModerateFree check
- Heritage property: in a Heritage Conservation District (Part V)Moderate
- Site-specific exception 900.11.10(2546)Moderate
- 2 by-law investigations closed in the last two yearsLow
- 22 development applications open within 300 mLowFree check
- Priority retail street: Yonge StreetLow
- Site and Area Specific Policy 382Low
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2013
- 2 by-law investigations closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Building permit open since 2013
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
2 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
18 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-08-05 | By-law investigation26 215700 GRA 00 IV | Notice Issued Graffiti | Notice Issued | |
| 2026-08-05 | By-law investigation26 214600 GRA 00 IR | Graffiti | Notice Issued | |
| 2026-03-31 | By-law investigation26 136915 GRA 00 IR | Graffiti | Closed | |
| 2025-06-03 | By-law investigation25 205117 PRS 00 IV | Order Issued Property Standards: Equipment/attachment appurtenant to the building is not being maintained in good repair, namely, the (canopy, marquee, sign, awning, screen, grille, stairway, p | Closed | |
| 2025-06-03 | By-law investigation25 170472 PRS 00 IR | Property Standards | Closed | |
| 2017-12-19 | Building permit17 265555 | Backflow prevention device. | Closed | |
| 2016-12-22 | Building permit16 249613 | In conjunction with a two storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy on the first storey west elevation. The proposed sign is 0.94 metres vertically by 3.83 metres horizontally at a height of 4.04 metres above grade.**Gong Cha ** | Closed | |
| 2013-05-24 | Building permit13 119703 | HVAC - Proposal for interior renovation to existing basement and ground floor of existing building for a cafe (74.8m2) | Inspection | |
| 2011-07-27 | Zoning review11 246589 LPR | No description on file | Closed | |
| 2010-02-08 | Zoning review10 115439 LTO | No description on file | Closed | |
| 2010-02-03 | Zoning review10 113566 LTO | No description on file | Closed | |
| 2010-01-25 | Building permit10 107215 | Proposal for interior alterations to existing "National Money Mart" sales area on ground floor and replace exterior glazing (50m2) in existing non-residential building. | Closed | |
| 2009-12-15 | Zoning review09 196699 LTO | No description on file | Closed | |
| 2004-04-27 | Zoning review04 128480 LTO | No description on file | Closed | |
| 2001-04-17 | Zoning review01 012557 LTO | No description on file | Closed | |
| 2001-03-01 | Building permit01 114730 | Make interior alterations to portion of ground floor | Closed | |
| 2001-01-22 | Building permit00 363559 | supply and install h.v.a.c. system on 1st and 2nd floors. see bp#00-371851 | Closed | |
| 2000-12-14 | Building permit00 361851 | To provide interior alterations to existing retail stores on ground floor & office on the second floor | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: in a Heritage Conservation District (Part V)
- Site-specific exception 900.11.10(2546)
- Priority retail street: Yonge Street
What this part means for this house, in plain EnglishUnlock
Heritage property: in a Heritage Conservation District (Part V)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(2546)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Yonge Street
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 382
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2546)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c2.0; r3.0) SS1 (x2546)
- Height limit
- 18 m
- Corner lot
- No
- Public lane
- Chechalk Lane, 6.2 m along it
- House footprint
- 116 m²
- Back yard
- 0.3 m
- Buildings on the lot
- 2
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 22 development applications open within 300 m, up to 76 storeys
- In the Bloor-Yonge station area
- 1 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
22 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 7 categories
- Theft over $5,000: 2.3 times the Toronto median
- Assault: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Church-Wellesley neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Wellesley StationNearest station1 min walk
- Wellesley StationNearest TTC stop1 min walk
- Wellesley St ENearest cycling route1 min walk
- The YMCA Academy Secondary SchoolSchool4 min walk
- The Abelard Centre for EducationSchool5 min walk
- St Joseph's College SchoolSchool6 min walk
- National Ballet School - Maison Staines House & Salle Currie HallSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31264.6
- Robberycity median 69.593.2
- Homicidecity median 5.33.3
- Auto theftcity median 192.646.6
- Theft over $5,000city median 46.1106.5
- Break and entercity median 172.8146.4
- Theft from vehiclescity median 188.1206.3
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist