HousePrecheckCheck an address

565 Bloor St WUniversity, Toronto · City records before you offer

Commercial residential · CR 3.0 (c2.0; r2.5) SS2 (x2395)15.4 × 15.7 m240 m²on Bathurst Stcorner, also on Bloor St W

3 things to check before you offer, including 1 open order or by-law investigation
N10 m
15.4 m frontage15.7 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 565 Bloor St W

565 Bloor St W is on a 15.4 m by 15.7 m lot on Bathurst St in University. The zoning is CR. A site-specific exception, 900.11.10(2395), changes some of the usual rules for this address. The lot also fronts Bloor St W.

The City has 29 records on this lot since 1994. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal for interior alterations tenant-fit 'beauty salon' -". Status: under review. In 2026, a building permit was filed: "2 wall sign2 projecting sign***fresh burger***". Status: examiner's notice sent. In 2025, a building permit was filed: "1 wall sign**vape world**". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection. There is 1 open order or by-law investigation on file. Ask the seller what is outstanding and whether it will be fixed before closing.

Within 300 m, 2 development applications are open (the tallest up to 40 storeys). Bathurst station is a 2-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • 1 open order or by-law investigationSerious
  • Building permit open since 2023ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2395)Moderate
  • 2 development applications open within 300 mLowFree check
  • Priority retail street: Bathurst Street, Bloor Street WestLow
  • 1 City tree in front of this lotLowFree check
  • Site and Area Specific Policy 334, 465Low
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

3 things to check before you offer, 1 of them serious.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Serious

Open City files

How much in the City's records needs answers before an offer

  • 1 open order or by-law investigation
  • Building permit open since 2023
  • Work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. 1 open order or by-law investigation

    SeriousCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Building permit open since 2023

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

29 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-11-09Building permit
26 267720
Proposal for interior alterations tenant-fit 'Beauty Salon' -Under Review
2026-10-26Building permit
26 260302
2 Wall Sign2 Projecting Sign***FRESH BURGER***Examiner's Notice Sent
2026-10-13Building permit
26 253540
Two wall sign***FRESH BURGER***Cancelled
2026-08-23By-law investigation
26 224298 WST 00 IR
WasteClosed
2026-06-29By-law investigation
26 193053 WST 00 IR
WasteClosed
2026-06-19By-law investigation
26 201731 WST 00 IV
Notice Issued Waste: 841-12A(2) an owner who received services during a daytime collection period shall ensure that: (2) empty regulation containers and uncollected garbage, recyclaClosed
2026-06-19By-law investigation
26 188163 WST 00 IR
WasteClosed
2026-05-27By-law investigation
26 168196 WST 00 IR
WasteClosed
2026-03-25By-law investigation
26 134304 WST 00 IR
WasteClosed
2026-01-27By-law investigation
26 109484 GRA 00 IR
GraffitiClosed
2025-07-18Building permit
25 184245
1 wall sign**VAPE WORLD**Closed
2025-06-27By-law investigation
25 190408 WST 00 IV
Notice Issued Waste: Permit refuse to be thrown, dumped, deposited on a highway within the City, namely, but not limited to three green bins.Closed
2025-06-27By-law investigation
25 185209 WST 00 IR
WasteClosed
2025-05-13Building permit
25 158949
5 Wall Signs, illuminated displaying static copy on the 1st storey, north and west elevations. ***The Fancy Burger***Ready for Issuance
2025-03-25Building order
25 134663 SNP 00 VI
Sign No Permit: Signs No permit Unit A Fancy BurgersNotice Issued
2025-02-19By-law investigation
25 118434 GRA 00 IR
GraffitiClosed
2023-09-21Zoning review
23 205113 LTO
No description on fileClosed
2023-05-08Building permit
21 177938
REV 01: Proposed revision for only two (2) separate units instead of creating three individual units - as per drawings. The demising wall at grid line # 2 will not be needed.PROPOSED: INTERIOR RENOVATION OF AN EXISTING RETAIL BUILDING TO CONSTRUCT TWO DEMISING WALLS TO CREATE THREE INDIVIDUAL RETAIL UNITS.Revision Issued
2023-02-08Zoning review
23 111436 LTO
No description on fileClosed
2022-12-14Building permit
22 199846
Application for a permit to erect and display two illuminated wall signs, displaying static copy, on the first storey, each with a face measuring 0.86m vertically by 3.35m at a height of 4.82m. Sign 1 will be located on the north elevation and SIgn 2 on the west elevation.*****FAT BURGER*****Cancelled
2022-05-17Building permit
22 126265
Plumbing - Proposal for interior alterations for new fast food restaurant.Closed
2015-03-27Zoning review
15 133092 LPR
No description on fileClosed
2011-08-23Building permit
11 259871
Proposal to demolish existing Lotto Booth on concourse level (TTC Station) and construct new booth.Closed
2010-03-24Building permit
10 125752
HVAC - Proposal for interior alterations to existing take out restaurant on the concourse level of existing TTC station. "Bakery On The Go".Closed
2009-08-18Building permit
09 154054
Proposal to install a backflow preventor.Closed
2007-06-20Zoning review
07 234795 ZPR
No description on fileClosed
2006-07-26Zoning review
06 160508 LTO
No description on fileClosed
2000-05-17Zoning review
00 012562 LTO
No description on fileClosed
1994-03-29Zoning review
94 024689 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2395)
  • Priority retail street: Bathurst Street, Bloor Street West
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2395)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Bathurst Street, Bloor Street West

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. 1 City tree in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Site and Area Specific Policy 334, 465

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  5. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2395)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
15.4 m frontage15.7 m deepon Bathurst St
Zone
CR 3.0 (c2.0; r2.5) SS2 (x2395)
Height limit
16 m
Corner lot
Yes, also on Bloor St W
Public lane
None
House footprint
213 m²
Back yard
0 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 2 development applications open within 300 m, up to 40 storeys
    • In the Bathurst station area
    • 36 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 2 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Break and enter: 4.2 times the Toronto median
    • Assault: 2.7 times the Toronto median
    • Theft over $5,000: 2.6 times the Toronto median
    • Homicide: 2.3 times the Toronto median
    • Robbery: 1.9 times the Toronto median
    • Theft from vehicles: 1.9 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    University neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$80,000median $84,500
    Households that own their home39%median 54%
    Population (2021)6,435median 16,813
    Homes built in 1960 or before59%median 29%
    Homes needing major repairs11%median 7%

    Getting around and schools

    • Bathurst StationNearest station2 min walk
    • Bathurst St at Bloor St WestNearest TTC stop1 min walk
    • Bloor St WNearest cycling route1 min walk
    • City As School TorontoSchool3 min walk
    • Central Technical SchoolSchool5 min walk
    • Monsignor Fraser College - Annex CampusSchool5 min walk
    • Royal St George's College- Sr SchoolSchool7 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.31740.5
    • Robberycity median 69.5133.9
    • Homicidecity median 5.312.2
    • Auto theftcity median 192.6182.6
    • Theft over $5,000city median 46.1121.7
    • Break and entercity median 172.8730.3
    • Theft from vehiclescity median 188.1353

    More about University

    Ready emails

    Copy and send as they are.

    6 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 565 Bloor St W

    3 things to check at 565 Bloor St W before you offer

    • 1 open order or by-law investigationSerious
    • Building permit open since 2023Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2395)Moderate
    • and 5 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 7 steps to take before you offer, so nothing slips
    • What each of the 9 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.