Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 5607 Yonge St
5607 Yonge St is on a 7.6 m by 29.5 m lot on Yonge St in Newtonbrook East. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Finch Ave E.
The City has 22 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2021, a building permit was filed: "Proposal to add two sinks and gi to restaurant and tie in to existing sanitary drain". Status: permit issued. In 2018, a building permit was filed: "In conjunction with a one storey building on the premises, proposal to erect and display six illuminated wall signs, all displaying static copy, located on the…". Status: closed. In 2017, a building permit was filed: "Proposal for interior alterations for basil box restaurant.related to 17 118822 zzc 00 zr". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 2 development applications are open (the tallest up to 25 storeys). Within 300 m, the Committee of Adjustment decided 4 minor variance applications in the last 10 years and approved 100%. Finch station is a 1-minute walk.
Summary
What the City's records show on this house
- 2 building permits open, the oldest since 2011ModerateFree check
- Zoning not in By-law 569-2013Moderate
- 2 by-law investigations closed in the last two yearsLow
- 2 development applications open within 300 mLowFree check
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 building permits open, the oldest since 2011
- 2 by-law investigations closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
2 building permits open, the oldest since 2011
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
2 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
22 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-04-20 | By-law investigation26 150525 PRS 00 IV | Order Issued Property Standards: Exterior yard surface and/or similar areas not maintained | Closed | |
| 2026-04-20 | By-law investigation26 147171 PRS 00 IR | Property Standards | Closed | |
| 2025-09-15 | By-law investigation25 225866 SIN 00 IR | Signs | Closed | |
| 2021-11-15 | Zoning review21 237615 LTO | No description on file | Closed | |
| 2021-07-12 | Building permit21 175217 | Proposal to add two sinks and GI to restaurant and tie in to existing sanitary drain | Permit Issued | |
| 2019-09-30 | Zoning review19 228993 LPR | No description on file | Closed | |
| 2018-05-03 | Building permit18 122359 | In conjunction with a one storey building on the premises, proposal to erect and display six illuminated wall signs, all displaying static copy, located on the north, south, east and west elevations. The proposed sign on the west elevation (Sign #1) is 1.12 metres vertically by 4.09 metres horizontally. The proposed sign on the north elevation (Sign #3) is 1.6 metres vertically by 2.67 metres horizontally. The proposed sign on the east elevation (Sign #4) is 0.92 metres vertically by 1.52 metres horizontally. The proposed signs on the south elevation are 2.22 metres vertically by 1.68 metres horizontally (Sign #5), 1.12 metres vertically by 4.08 metres horizontally (Sign #6), and 2.34 metres vertically by 1.73 metres horizontally (Sign #7).*****BASIL BOX***** | Closed | |
| 2017-11-08 | Zoning review17 259747 ZPR | No description on file | Closed | |
| 2017-10-05 | Zoning review17 244060 ZPR | No description on file | Closed | |
| 2017-10-04 | Building permit17 226057 | Proposal for interior alterations for Basil box restaurant.related to 17 118822 ZZC 00 ZR | Closed | |
| 2017-08-30 | Zoning review17 225542 ZPR | No description on file | Cancelled | |
| 2017-07-20 | Minor varianceA0466/17NY | To permit a reduced number of parking spaces for the proposed restaurant. | Approved | |
| 2017-02-19 | Zoning review17 118822 ZZC | No description on file | Closed | |
| 2016-10-14 | Zoning review16 237674 LPR | No description on file | Closed | |
| 2016-10-05 | Zoning review16 233563 ZPR | No description on file | Closed | |
| 2015-12-11 | Zoning review15 264055 ZSV | No description on file | Closed | |
| 2012-03-06 | Building permit12 125597 | To erect and display one illuminated, static copy wall sign on the northerly elevation first storey wall, in conjunction with an existing commercial bank operating on the premises. **Scotia Bank** | Closed | |
| 2011-10-13 | Building permit11 283637 | Scotiabank - Relocate ABM machine and exterior ramp | Inspection | |
| 2009-12-08 | Building permit09 188946 | Installation of backflow preventor - boiler room - Scotia Bank | Closed | |
| 2001-09-27 | Building permit01 166032 | INTERTIOR ALTERTIONS FOR BANKS | Closed - Dormant | |
| 2001-08-23 | Minor varianceA029/01U | This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the construction of a tower addition attached to the front and south side walls of the existing commercial building located on the above noted property. | Withdrawn | |
| 2001-08-21 | Building permit01 168991 | INSTALL NEW PLUMBING FIXTURES IN BANK TO ORIG. PERMITNO. 01-166032 | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- Yes, also on Finch Ave E
- Public lane
- None
- House footprint
- 166 m²
- Back yard
- 6.3 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 2 development applications open within 300 m, up to 25 storeys
- 4 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
2 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Newtonbrook East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Finch StationNearest station1 min walk
- Finch Ave East at Yonge St East SideNearest TTC stop1 min walk
- Finch Corridor TrlNearest cycling route4 min walk
- TfsSchool1 min walk
- Daryk HighSchool4 min walk
- St Cyril Catholic Elementary SchoolSchool6 min walk
- McKee Public SchoolSchool12 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3554
- Robberycity median 69.560.3
- Auto theftcity median 192.6252.3
- Theft over $5,000city median 46.149.4
- Break and entercity median 172.8170
- Theft from vehiclescity median 188.1170
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist