HousePrecheckCheck an address

556 Church StChurch-Wellesley, Toronto · City records before you offer

Also 558 Church St, 560A Church St, 560 Church St

Commercial residential · CR 3.0 (c1.7; r3.0) SS1 (x2545)15.3 × 26.7 m401 m²on Church Stbacks onto Dapper Lane

1 thing to check before you offer, including work or applications in progress
N10 m
15.3 m frontage26.7 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 556 Church St

556 Church St is on a 15.3 m by 26.7 m lot on Church St in Church-Wellesley. The zoning is CR. A site-specific exception, 900.11.10(2545), changes some of the usual rules for this address.

The City has 16 records on this lot since 1995. That is more than at 99% of Toronto houses. In 2026, a development application was filed: "Combined official plan & zoning by-law amendment for a 36-storey purpose built rental mixed-use tower atop a 5-storey podium with 409 residential rental units…". Status: closed. In 2021, a development application was filed: "Official plan and zoning by-law amendment for 28-storey and 7-storey mixed-use buildings having a non-residential gross floor area of 883.9 square metres, and…". Status: council approved. In 2021, a development application was filed: "1 block". Status: under review. Nothing on file is open right now.

Within 300 m, 24 development applications are open (the tallest up to 75 storeys). Wellesley station is a 4-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2545)Moderate
  • 24 development applications open within 300 mLowFree check
  • Priority retail street: Church StreetLow
  • Site and Area Specific Policy 382Low
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

16 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-09-13By-law investigation
26 236709 GRA 00 IR
GraffitiClosed
2026-02-20Development application
26 119147 STE 13 OZ
Combined Official Plan & Zoning By-law amendment for a 36-storey purpose built rental mixed-use tower atop a 5-storey podium with 409 residential rental units and retail at grade.Closed
2021-11-09Development application
21 235897 STE 13 OZ
Official Plan and Zoning By-law amendment for 28-storey and 7-storey mixed-use buildings having a non-residential gross floor area of 883.9 square metres, and a residential gross floor area of 26017.0 square metres. 369 units are proposed, of which 76 are rental replacement units.Council Approved
2021-11-09Development application
21 235904 STE 13 SB
1 blockUnder Review
2017-08-02Development application
17 210131 STE 27 OZ
A Zoning By-law Amendment and Official Plan Amendment application to redevelop the properties at 64-66 Wellesley St E and 552-570 Church St with a 39-storey mixed-use building (132.6 metres plus mechanical penthouse), containing 442 dwelling units, 4,828 square metres of retail space and a 320 square metre public space at the corner of Church and Wellesley Street. This application is a revision to the previously submitted proposal for a 43-storey mixed-use building (154.3 metres plus 7.0 metre mechanical penthouse), containing 430 residential units as well as 1,400 square metres of street-related retail space and a 260 square metre publicly accessible plaza.Closed
2015-03-27Zoning review
15 133080 LPR
No description on fileClosed
2014-05-02Zoning review
14 150906 LTO
No description on fileClosed
2011-08-02Building permit
11 247682
This is for the installation of a 1 1/2" backflow prevention device within the basement of this multi use/non residential building.Closed
2009-05-26Building permit
09 135893
Proposal to install 1 backflow prevention device to the existing water line.Closed
2008-09-17Zoning review
08 204151 LTO
No description on fileClosed
2006-11-07Zoning review
06 189519 LTO
No description on fileClosed
2006-09-11Zoning review
06 174266 LTO
No description on fileClosed
2006-07-27Zoning review
06 161043 LTO
No description on fileClosed
2006-04-07Building permit
06 123065
New kitchen exhaust system for take out restaurantClosed
2002-06-24Zoning review
02 149925 LTO
No description on fileClosed
1995-09-21Zoning review
95 025632 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2545)
  • Priority retail street: Church Street
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2545)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Church Street

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Site and Area Specific Policy 382

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2545)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
15.3 m frontage26.7 m deepon Church St
Zone
CR 3.0 (c1.7; r3.0) SS1 (x2545)
Height limit
18 m
Corner lot
No
Public lane
Dapper Lane, 15.3 m along it
House footprint
388 m²
Back yard
0.2 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 24 development applications open within 300 m, up to 75 storeys
    • In the Bloor-Yonge station area
    • 4 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 24 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime near median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 7 categories
    • Theft over $5,000: 2.3 times the Toronto median
    • Assault: 2.0 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Church-Wellesley neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$60,400median $84,500
    Households that own their home24%median 54%
    Population (2021)22,320median 16,813
    Homes built in 1960 or before15%median 29%
    Homes needing major repairs5%median 7%

    Getting around and schools

    • Wellesley StationNearest station4 min walk
    • Wellesley St East at Church StNearest TTC stop1 min walk
    • Wellesley St ENearest cycling route1 min walk
    • The Abelard Centre for EducationSchool2 min walk
    • National Ballet School - Maison Staines House & Salle Currie HallSchool3 min walk
    • Jarvis Collegiate InstituteSchool5 min walk
    • Church St Jr & Native Learning CtrSchool5 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.31264.6
    • Robberycity median 69.593.2
    • Homicidecity median 5.33.3
    • Auto theftcity median 192.646.6
    • Theft over $5,000city median 46.1106.5
    • Break and entercity median 172.8146.4
    • Theft from vehiclescity median 188.1206.3

    More about Church-Wellesley

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 556 Church St

    1 thing to check at 556 Church St before you offer

    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2545)Moderate
    • 24 development applications open within 300 mLow
    • Priority retail street: Church StreetLow
    • and 2 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 6 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.