HousePrecheckCheck an address

55 McBain AveBridle Path-Sunnybrook-York Mills, Toronto · City records before you offer

Residential detached · RD (f9.0; a275)≈ 46.5 × 19.0 m578 m²on McBain Ave

2 things to check before you offer, including building permit open since 2018
N20 m
≈ 46.5 m frontage≈ 19.0 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 55 McBain Ave

55 McBain Ave is on a 46.5 m by 19 m lot on McBain Ave in Bridle Path-Sunnybrook-York Mills. The zoning is RD.

The City has 10 records on this lot since 2012. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Rev 01:revisions to second floor interior alterations and minor changes to exterior facade. proposal for a 2 storey rear addition and interior alterations to…". Status: revision issued. In 2022, a Committee of Adjustment application was filed: "Proposal to construct a two storey rear addition and third storey loft space above existing two-storey detached dwelling". Status: closed. In 2018, a building permit was filed: "Proposal to construct a pool enclosure fence. related to 17-176822, mls inspector requested revision be created (previous permit was closed)". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 4 development applications are open (the tallest up to 34 storeys). Within 300 m, the Committee of Adjustment decided 35 minor variance applications in the last 10 years and approved 94%. Leaside station is a 9-minute walk.

Summary

What the City's records show on this house

  • Building permit open since 2018ModerateFree check
  • Work or applications in progressModerateFree check
  • No permit for a second unit on fileLowFree check
  • 4 development applications open within 300 mLowFree check
  • Yonge-Eglinton Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 4 units · Lot split (severance)

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2018
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2018

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

10 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-09-23Building permit
26 133725
REV 01:Revisions to second floor interior alterations and minor changes to exterior facade. Proposal for a 2 storey rear addition and interior alterations to basement, main, and second floors.Revision Issued
2022-05-10Minor variance
A0139/22NY
Proposal to construct a two storey rear addition and third storey loft space above existing two-storey detached dwelling.Refused
2021-08-04Zoning review
21 193700 ZZC
No description on fileClosed
2018-08-08Building permit
18 201904
Proposal to construct a pool enclosure fence. Related to 17-176822, MLS inspector requested revision be created (previous permit was closed).Closed
2018-07-17Building permit
18 195283
Proposal to trench and add a Domestic Water and Sanitary line for a new cabana.Inspection
2017-06-15Building permit
17 176822
Proposal to install pool fence enclosure.Closed
2013-05-29Building permit
13 167702
Demolish two storey single family dwelling.Closed
2013-05-29Building permit
13 167681
Two storey single family dwelling with integral at grade garage.Closed
2012-12-21Zoning review
12 296933 ZZC
No description on fileClosed
2012-10-02Zoning review
12 256663 000
No description on fileCancelled
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • No heritage listing or designation
  • No site-specific zoning exception

What this part means for this house, in plain EnglishUnlock

  1. Yonge-Eglinton Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Good

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 4 units: allowed
  • Secondary suite: allowed
  • Lot split (severance): possible

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 4 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  2. Lot split (severance)

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N20 m
≈ 46.5 m frontage≈ 19.0 m deepon McBain Ave
Zone
RD (f9.0; a275)
Height limit
10 m
Lot coverage limit
35%
Corner lot
No
Public lane
None
New house permit
2013
House footprint
160 m²
Back yard
4.8 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Active

Building nearby

How much neighbours are building and applying to change within 300 m

  • 4 development applications open within 300 m, up to 34 storeys
  • 35 minor variance decisions within 300 m, 94% approved

What this part means for this house, in plain EnglishUnlock

  1. 4 development applications open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 4 of 7 categories
  • Break and enter: 2.3 times the Toronto median
  • Shootings: 1.6 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Bridle Path-Sunnybrook-York Mills neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$222,000median $84,500
Households that own their home89%median 54%
Population (2021)8,940median 16,813
Homes built in 1960 or before22%median 29%
Homes needing major repairs3%median 7%

Getting around and schools

  • Leaside StationNearest station9 min walk
  • Bayview Ave at Broadway AveNearest TTC stop5 min walk
  • Broadway AveNearest cycling route1 min walk
  • Children's Garden Junior SchoolSchool12 min walk
  • Leaside High SchoolSchool13 min walk
  • Northern Secondary SchoolSchool13 min walk
  • Toronto Stem SchoolSchool13 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3205.9
  • Robberycity median 69.551.5
  • Shootingscity median 10.517.2
  • Auto theftcity median 192.6197.4
  • Theft over $5,000city median 46.134.3
  • Break and entercity median 172.8403.3
  • Theft from vehiclescity median 188.1163

More about Bridle Path-Sunnybrook-York Mills

Ready emails

Copy and send as they are.

4 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 55 McBain Ave

2 things to check at 55 McBain Ave before you offer

  • Building permit open since 2018Moderate
  • Work or applications in progressModerate
  • No permit for a second unit on fileLow
  • 4 development applications open within 300 mLow
  • and 2 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 6 steps to take before you offer, so nothing slips
  • What each of the 6 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.