Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 55 Elm St
55 Elm St is on a 7.2 m by 25.4 m lot on Elm St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(2308), changes some of the usual rules for this address. The lot also fronts Bay St.
The City has 19 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2026, a development application was filed: "Proposed 18 storey building containing 234 hotel suites and retail space". Status: under review. In 2019, a building permit was filed: "Proposal for the demolition of existing vacant 3 storey former hotel, convenience address is 650 bay street". Status: under review. In 2012, a building permit was filed: "Proposal to construct a roof deck on the 3rd floor of existing hotel building". Status: inspection. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection. There are 2 open orders or by-law investigations on file. Ask the seller what is outstanding and whether it will be fixed before closing.
Within 300 m, 16 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 12 minor variance applications in the last 10 years and approved 92%. TMU station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 2 open orders or by-law investigationsSerious
- 2 building permits open, the oldest since 2011ModerateFree check
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(2308)Moderate
- 16 development applications open within 300 mLowFree check
- Priority retail street: Bay StreetLow
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer, 1 of them serious.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 open orders or by-law investigations
- 2 building permits open, the oldest since 2011
- Work or applications in progress
What this part means for this house, in plain EnglishUnlock
2 open orders or by-law investigations
SeriousCheck before you offerWhat the record shows, what it means for you and what to doUnlock
2 building permits open, the oldest since 2011
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
19 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-05-10 | By-law investigation26 158053 GRA 00 IR | Graffiti | Notice Issued | |
| 2026-05-01 | Zoning review26 101832 PRZ | No description on file | Closed | |
| 2026-01-07 | Development application26 101832 STE 11 OZ | Proposed 18 storey building containing 234 hotel suites and retail space. | Under Review | |
| 2025-12-15 | By-law investigation26 133985 GRA 00 IV | Notice Issued Graffiti | Prosecution Initiated | |
| 2025-12-15 | By-law investigation25 266207 GRA 00 IR | Graffiti | Prosecution Initiated | |
| 2019-05-10 | Building permit19 152566 | Proposal for the demolition of existing vacant 3 storey former hotel, convenience address is 650 Bay Street. | Under Review | |
| 2015-08-27 | Building order15 213901 OTC 00 VI | No description on file | Order Issued | |
| 2015-08-25 | Building order15 213816 OTC 00 VI | No description on file | Order Issued | |
| 2014-02-10 | Zoning review14 115450 LPR | No description on file | Closed | |
| 2012-12-11 | Building permit12 273109 | Proposal to construct a roof deck on the 3rd floor of existing hotel building | Inspection | |
| 2012-05-31 | Building permit11 188652 | HVAC - Make interior alterations | Closed | |
| 2012-02-23 | Building permit12 116347 | permit to replace fire alarm panel and detection devices to existing mixed use hotel and retail / restaurant building. | Closed | |
| 2011-08-10 | Building permit11 245945 | interior alterations to create new restaurant under 30 seats in existing vacant restaurant space - ground floor. Silced Gourmet Inc | Inspection | |
| 2007-11-30 | Building permit07 283177 | Interior alterations to entire existing Hotel. BLD/STRU/HVAC/PLB | Cancelled | |
| 2007-05-18 | Zoning review07 219655 ZSV | No description on file | Closed | |
| 2007-04-02 | Zoning review07 135362 ZPR | No description on file | Closed | |
| 2001-09-13 | Building permit01 144557 | Install window opening in East elevation. | Closed | |
| 2001-06-06 | Zoning review01 035531 ZSV | No description on file | Closed | |
| 2001-04-12 | Zoning review01 127266 000 | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2308)
- Priority retail street: Bay Street
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2308)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Bay Street
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2308)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 7.8 (c2.0; r7.8) SS1 (x2308)
- Height limit
- 61 m
- Corner lot
- Yes, also on Bay St
- Public lane
- None
- House footprint
- 179 m²
- Back yard
- 0.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 16 development applications open within 300 m, up to 85 storeys
- In the College station area
- 12 minor variance decisions within 300 m, 92% approved
What this part means for this house, in plain EnglishUnlock
16 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 8 categories
- Assault: 5.3 times the Toronto median
- Theft over $5,000: 4.6 times the Toronto median
- Robbery: 4.3 times the Toronto median
- Break and enter: 3.2 times the Toronto median
- Homicide: 2.3 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-Bay Corridor neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- TMU StationNearest station5 min walk
- Bay St at Elm StNearest TTC stop1 min walk
- Bay StNearest cycling route1 min walk
- Toronto Metropolitan University - Entr To Business School LobbySchool4 min walk
- Tmu - Heaslip HouseSchool6 min walk
- Toronto Metropolitan University - School of Image ArtsSchool7 min walk
- Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.33361.1
- Robberycity median 69.5300.1
- Homicidecity median 5.312
- Shootingscity median 10.512
- Auto theftcity median 192.6162.1
- Theft over $5,000city median 46.1210.1
- Break and entercity median 172.8552.2
- Theft from vehiclescity median 188.1402.1
Ready emails
Copy and send as they are.
6 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist