Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 545 Concord Ave
545 Concord Ave is on a 6.2 m by 37.2 m lot on Concord Ave in Dovercourt Village. The zoning is R.
The City has 14 records on this lot since 2024. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal to construct a 2-storey laneway suite". Status: permit issued. In 2026, a building permit was filed: "Revision - to change second floor balcony guard construction, suite demising wall construction, and rear unit entryproposal to construct a new three storey…". Status: revision issued. In 2026, a building permit was filed: "Revision - to change second floor balcony guard construction, suite demising wall construction, and rear unit entry. proposal for new three storey with…". Status: revision issued. 4 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 1 development application is open (the tallest up to 19 storeys). Within 300 m, the Committee of Adjustment decided 55 minor variance applications in the last 10 years and approved 98%. Ossington station is a 11-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Records mention laneway suite, multiplexModerateFree check
- 1 development application open within 300 mLowFree check
- 5 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- Records mention laneway suite, multiplex
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention laneway suite, multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
5 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
14 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-04-17 | Building permit25 265424 | Proposal to construct a 2-storey laneway suite | Permit Issued | |
| 2026-04-17 | Building permit25 265349 | Proposal to construct a 2-storey laneway suite | Permit Issued | |
| 2026-04-14 | Building permit25 208932 | REVISION - to change second floor balcony guard construction, suite demising wall construction, and rear unit entryProposal to construct a new three storey with basement detached fourplex | Revision Issued | |
| 2026-04-14 | Building permit25 208817 | REVISION - to change second floor balcony guard construction, suite demising wall construction, and rear unit entry. Proposal for new three storey with basement detached fourplex | Revision Issued | |
| 2025-11-12 | Building permit25 208851 | Proposl for demolishing the existing single family dwelling | Closed | |
| 2025-04-09 | Consent (lot split)B0075/24TEY | To obtain consent to sever the lot into two residential lots. | Approved | |
| 2025-04-09 | Minor varianceA1076/24TEY | To construct a new three-storey detached dwelling (fourplex) with a covered front porch and stairs, front and rear second floor covered balconies, and a rear basement walkout with a patio. Also, to construct a rear two-storey ancillary building containing one laneway suite. There will be a total of five residential dwelling units on this lot (four units within the main dwelling and one unit within the ancillary building). | Approved | |
| 2025-04-09 | Minor varianceA1074/24TEY | To construct a new three-storey detached dwelling (fourplex) with a covered front porch and stairs, front and rear second floor covered balconies, and a rear basement walkout with a patio. Also, to construct a rear two-storey ancillary building containing one laneway suite. There will be a total of five residential dwelling units on this lot (four units within the main dwelling and one unit within the ancillary building). | Approved | |
| 2024-12-20 | Minor varianceSYS 5559158 | PART 2 - Proposal to construct new laneway suite in the rearyard of a proposed fourplex | Pending | |
| 2024-12-19 | Minor varianceSYS 5558620 | No description on file | Pending | |
| 2024-10-28 | Zoning review24 232055 ZAP | No description on file | Closed | |
| 2024-10-28 | Zoning review24 232054 ZAP | No description on file | Application On Hold | |
| 2024-10-28 | Zoning review24 232053 ZAP | No description on file | Closed | |
| 2024-10-28 | Zoning review24 232047 ZAP | No description on file | Application On Hold |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, laneway suite
- Garden suite: likely fits
What this part means for this house, in plain EnglishUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6)
- Height limit
- 13 m
- Corner lot
- No
- Public lane
- Ln W Ossington S Dupont, 6.2 m along it
- New house permit
- 2026
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 19 storeys
- 51 suite and multiplex permits within 300 m in 10 years
- 55 minor variance decisions within 300 m, 98% approved
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
- Assault: 1.5 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Dovercourt Village neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Ossington StationNearest station11 min walk
- Ossington Ave at Hallam StNearest TTC stop1 min walk
- Hallam StNearest cycling route1 min walk
- Uchenna AcademySchool5 min walk
- Sacre Coeur Catholic Elementary SchoolSchool7 min walk
- Essex Jr Sr & Hawthorne Two BilingualSchool9 min walk
- Dovercourt Jr Public SchoolSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3974.9
- Robberycity median 69.568.6
- Auto theftcity median 192.6129.5
- Theft over $5,000city median 46.122.9
- Break and entercity median 172.8236.1
- Theft from vehiclescity median 188.1144.7
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist