Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 54 Kenilworth Ave
54 Kenilworth Ave is on a 4.1 m by 36.7 m lot on Kenilworth Ave in The Beaches. The zoning is R. The lot also fronts Kew Beach Cres.
The City has 10 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal for a rear second floor addition and enclosing the existing front veranda". Status: not started. In 2026, a Committee of Adjustment application was filed: "To legalize and to maintain the existing rear second-storey addition, which was constructed without an authorized building permit. also, to alter the existing…". Status: closed. In 2026, a building permit was filed: "Proposal for plumbing in existing kitchen on ground floor. one kitchen sink and one dishwasher on ground floor, as per plumbing data sheet". Status: inspection. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection. There is 1 open order or by-law investigation on file. Ask the seller what is outstanding and whether it will be fixed before closing.
Within 300 m, 1 development application is open (the tallest up to 6 storeys). Within 300 m, the Committee of Adjustment decided 49 minor variance applications in the last 10 years and approved 92%. The nearest TTC stop is Queen St East at Elmer Ave, a 4-minute walk.
Summary
What the City's records show on this house
- 1 open order or by-law investigationSerious
- Work or applications in progressModerateFree check
- Records mention garden suiteModerateFree check
- 1 development application open within 300 mLowFree check
- 3 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer, 1 of them serious.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 1 open order or by-law investigation
- Work or applications in progress
- Records mention garden suite
What this part means for this house, in plain EnglishUnlock
1 open order or by-law investigation
SeriousCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention garden suite
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
3 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-11-24 | Building permit26 274281 | Proposal for a rear second floor addition and enclosing the existing front veranda | Not Started | |
| 2026-10-21 | Minor varianceA0550/26TEY | To legalize and to maintain the existing rear second-storey addition, which was constructed without an authorized building permit. Also, to alter the existing two-storey townhouse dwelling by constructing a front one-storey addition (verandah enclosure) and a rear ground floor juliette balcony. | Approved | |
| 2026-06-17 | Minor varianceSYS 5860556 | No description on file | Pending | |
| 2026-03-27 | Zoning review26 135711 ZAP | No description on file | Closed | |
| 2026-03-03 | Building permit26 120302 | Proposal for plumbing in existing kitchen on ground floor. One kitchen sink and one dishwasher on ground floor, as per plumbing data sheet. | Inspection | |
| 2026-02-09 | Building order26 115228 WNP 00 VI | Order Issued No Permit: Second floor deck that was removed from main house without permit. Interior and exterior work is being done on property without permit. | Order Issued | |
| 2026-01-28 | Minor varianceA0901/25TEY | To construct a new two-storey detached ancillary building (containing one garden suite with a second storey balcony on the west side), in the rear yard. The existing two-storey detached dwelling will be maintained and unaltered. There will be a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary building). The existing garage will be demolished. | Approved | |
| 2025-10-07 | Zoning review25 236525 ZAP | No description on file | Closed | |
| 2015-11-02 | Building permit15 245837 | Back Water Valve (Sewer only) installation. | Closed | |
| 2002-06-06 | Building permit02 142658 | Install 4" sanitary drain and 2.v.f.d. "PLANS" | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: garden suite
- Multiplex up to 4 units: allowed
- Secondary suite: allowed
What this part means for this house, in plain EnglishUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6)
- Height limit
- 11 m
- Corner lot
- Yes, also on Kew Beach Cres
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 76 m²
- Back yard
- 17.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 6 storeys
- 12 suite and multiplex permits within 300 m in 10 years
- 49 minor variance decisions within 300 m, 92% approved
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
The Beaches neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Danforth GO StationNearest station36 min walk
- Queen St East at Elmer AveNearest TTC stop4 min walk
- Martin Goodman / Waterfront TrlNearest cycling route4 min walk
- Kew Beach Jr Public SchoolSchool2 min walk
- Boardwalk Montessori SchoolSchool4 min walk
- Academy of Thought and Industry TorontoSchool10 min walk
- Glen Ames Sr Public SchoolSchool12 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3525.6
- Robberycity median 69.525.2
- Auto theftcity median 192.6164
- Theft over $5,000city median 46.150.5
- Break and entercity median 172.8151.4
- Theft from vehiclescity median 188.1243.9
Ready emails
Copy and send as they are.
6 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist