Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 52 St Clair Ave E
52 St Clair Ave E is on a 9.5 m by 32.6 m lot on St Clair Ave E in Rosedale-Moore Park. The zoning is CR. A site-specific exception, 900.11.10(2405), changes some of the usual rules for this address. The lot also fronts Ferndale Ave.
The City has 7 records on this lot since 1982. That is more than at 97% of Toronto houses. In 2001, a building permit was filed: "Install 4" sanitary drain, install in basement: 4 w.c., 6 showers, 6 w.b., 1 wash machine, 1 wash tub, on 1st floor: 1 w.c., 1 w.b. for new clinic. tenant…". Status: closed. In 2001, a building permit was filed: "Make interior alterations to basement and ground floor for new clinic. tenant: balance wellness clinic. edc". Status: inspection. In 2025, a zoning review was filed. Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 17 development applications are open (the tallest up to 50 storeys). St Clair station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2001ModerateFree check
- Site-specific exception 900.11.10(2405)Moderate
- 17 development applications open within 300 mLowFree check
- Yonge-St. Clair Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2001
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
Building permit open since 2001
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
7 records on file, more than at 97% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-04-01 | Zoning review25 137483 LTO | No description on file | Closed | |
| 2001-05-08 | Building permit01 127272 | install 4" sanitary drain, install in basement: 4 w.c., 6 showers, 6 w.b., 1 wash machine, 1 wash tub, on 1st floor: 1 w.c., 1 w.b. for new clinic. tenant: balance wellness clinic. cost included in 01-127257 P L A N S edc | Closed | |
| 2001-04-19 | Building permit01 127257 | make interior alterations to basement and ground floor for new clinic. tenant: balance wellness clinic. edc | Inspection | |
| 1992-11-04 | Zoning review92 026166 LTO | No description on file | Closed | |
| 1991-03-15 | Zoning review91 026206 LTO | No description on file | Closed | |
| 1983-01-25 | Zoning review83 025511 LTO | No description on file | Closed | |
| 1982-07-06 | Zoning review82 026230 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2405)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2405)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Yonge-St. Clair Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2405)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c2.0; r1.5) SS2 (x2405)
- Height limit
- 16 m
- Corner lot
- Yes, also on Ferndale Ave
- Public lane
- Ln N St Clair W Ferndale, 15.3 m along it
- House footprint
- 272 m²
- Back yard
- 0 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 17 development applications open within 300 m, up to 50 storeys
- In the St Clair station area
- 7 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
17 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 6 categories
- Break and enter: 2.6 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Rosedale-Moore Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St Clair StationNearest station2 min walk
- St Clair StationNearest TTC stop2 min walk
- Avoca AveNearest cycling route2 min walk
- Deer Park Jr & Sr Public SchoolSchool2 min walk
- The Linden SchoolSchool4 min walk
- The York School - Jr CampusSchool7 min walk
- The York School - Mdl and Sr CampusSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.4
- Robberycity median 69.586.8
- Auto theftcity median 192.6199.6
- Theft over $5,000city median 46.165.1
- Break and entercity median 172.8455.6
- Theft from vehiclescity median 188.1182.2
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist