Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 501 Palmerston Blvd
501 Palmerston Blvd is on a 10.1 m by 42.5 m lot on Palmerston Blvd in Palmerston-Little Italy. The zoning is R. A site-specific exception, 900.2.10(735), changes some of the usual rules for this address.
The City has 16 records on this lot since 2021. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Rev 01: revision to permit to add a fourth storey and interior alterations (as bubbled)proposal to demolish existing building and construct a new 3 storey…". Status: not started. In 2026, a Committee of Adjustment application was filed: "To construct a new four-storey apartment building with front and rear basement walkouts, front and rear ground floor landings with stairs, front and rear…". Status: closed. In 2026, a building permit was filed: "Construction of a 2-storey garden suite with basement". Status: permit issued. 4 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 1 development application is open (the tallest up to 40 storeys). Bathurst station is a 6-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Records mention garden suite, multiplexModerateFree check
- Site-specific exception 900.2.10(735)Moderate
- 1 development application open within 300 mLowFree check
- 1 City tree in front of this lotLowFree check
- 5 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- Records mention garden suite, multiplex
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention garden suite, multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
5 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
16 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-11-16 | Building permit26 165118 | REV 01: Revision to permit to add a fourth storey and interior alterations (as bubbled)Proposal to demolish existing building and construct a new 3 storey residential apartment building with 12 units. | Not Started | |
| 2026-09-23 | Minor varianceA0580/26TEY | To construct a new four-storey apartment building with front and rear basement walkouts, front and rear ground floor landings with stairs, front and rear balconies located on the second and third storeys, and front and rear fourth storey rooftop decks. There will be a total of three short-term bicycle parking spaces at the rear of the main building. Also, to construct a new rear two-storey detached ancillary building (containing one garden suite), including stairs at the west side of the ancillary building. There will be a total of 13 residential dwelling units on this lot (12 dwelling units occupying the apartment building, and one unit occupying the ancillary building). | Approved | |
| 2026-09-23 | Building permit26 174854 | Construction of a 2-storey garden suite with basement. | Permit Issued | |
| 2026-08-21 | Zoning review26 223621 ZAP | No description on file | Closed | |
| 2026-07-18 | By-law investigation26 204496 WST 00 IR | Waste | Closed | |
| 2026-04-16 | Building permit25 178742 | REV 01: TO INCREASE THE OVERALL BUILDING FOOTPRINT AND ALTER THE EXTENTS OF THE REAR WALKOUT/PORCHProposal for demolition of existing building and constructing a new fourplex | Revision Issued | |
| 2026-03-18 | Minor varianceA0092/26TEY | To construct a new three-storey apartment building with front and rear ground floor entrance stairs, front and rear balconies located on the second and third levels, front and rear basement walkouts, and rooftop staircase access enclosures. Also, to construct a new rear two-storey detached ancillary building (containing one garden suite) with stairs at the west side of the ancillary building. There will be a total of nine residential dwelling units on the lot (eight dwelling units within the apartment building and one dwelling unit within the ancillary building). | Approved | |
| 2025-11-12 | Minor varianceA0714/25TEY | To construct a new three-storey apartment building with front and rear ground floor stairs (for three front and three rear entrances), two front and two rear second floor balconies, two front and two rear third floor balconies, two side (north) basement walkouts, and rooftop staircase access enclosure. Also, to convert the existing rear one-storey ancillary building (garage) into one garden suite by constructing a second story addition, a two-storey addition at the southwest portion of the building (with a complete basement addition below), and stairs at the west side of the building. There will be a total of 11 residential dwelling units on the lot (ten dwelling units within the apartment building and one dwelling unit within the garden suite). | Refused | |
| 2025-10-30 | Building permit25 178765 | Proposal for demolition of existing building and constructing a new fourplex | Permit Issued | |
| 2025-09-21 | By-law investigation25 228440 WST 00 IR | Waste | Closed | |
| 2025-09-21 | By-law investigation25 228438 LGW 00 IR | Long Grass and Weeds | Closed | |
| 2025-06-02 | Zoning review25 169432 ZAP | No description on file | Closed | |
| 2025-06-02 | Zoning review25 169401 ZAP | No description on file | Application On Hold | |
| 2025-03-16 | By-law investigation25 129724 GRA 00 IR | Graffiti | Closed | |
| 2023-06-14 | Consent (lot split)B0022/23TEY | To obtain consent to create a new easement/right-of-way. | Approved | |
| 2021-10-08 | Consent (lot split)B0075/21TEY | To obtain consent for a technical severance to re-establish two residential lots which merged on title. | Approved |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(735)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(735)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(735)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, garden suite
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- R (d0.6) (x735)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- None
- New house permit
- 2026
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 40 storeys
- In the Bathurst station area
- 51 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 7 categories
- Robbery: 1.6 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Palmerston-Little Italy neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Bathurst StationNearest station6 min walk
- Bathurst St at Lennox StNearest TTC stop3 min walk
- Palmerston BlvdNearest cycling route1 min walk
- City As School TorontoSchool2 min walk
- Harbord Collegiate InstituteSchool4 min walk
- Central Technical SchoolSchool5 min walk
- Monsignor Fraser College - Annex CampusSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3654.6
- Robberycity median 69.5113.8
- Shootingscity median 10.57.1
- Auto theftcity median 192.6113.8
- Theft over $5,000city median 46.128.5
- Break and entercity median 172.8256.2
- Theft from vehiclescity median 188.1142.3
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist