Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 497 King St E
497 King St E is on a 19.7 m by 53.6 m lot on King St E in Moss Park. The zoning is CR. A site-specific exception, 900.11.10(340), changes some of the usual rules for this address.
The City has 12 records on this lot since 2008. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Installing a new 45min f.r.r. gyp bd ceiling in the pool room (entry level) of the spa. replacing upright sprinkler heads with pendants heads to suit…". Status: inspection. In 2016, a building permit was filed: "Install backflow device". Status: closed. In 2014, a development application was filed: "Site plan application to permit the construction of a 3-storey addition to the existing 1-storey non-residential building. the building would be used as a…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 8 development applications are open (the tallest up to 55 storeys). The nearest TTC stop is King St East at Sackville St, a 1-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(340)Moderate
- 8 development applications open within 300 mLowFree check
- Priority retail street: King Street EastLow
- King-Parliament Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
12 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-06-25 | Building permit25 174326 | Installing a new 45min f.r.r. gyp bd ceiling in the pool room (entry level) of the spa. Replacing upright sprinkler heads with Pendants heads to suit installation of the new gyp. Bd. Ceiling. | Inspection | |
| 2024-02-29 | Zoning review24 120379 LTO | No description on file | Closed | |
| 2017-05-18 | Zoning review17 162136 LTO | No description on file | Closed | |
| 2016-08-24 | Building permit16 210262 | install backflow device | Closed | |
| 2014-04-10 | Development application14 141250 STE 28 SA | Site plan application to permit the construction of a 3-storey addition to the existing 1-storey non-residential building. The building would be used as a restaurant. | Closed | |
| 2012-09-13 | Building permit12 242067 | To erect and display four non-illuminated projecting signs, between the second and third storey level at the westerly elevation of the building, in conjunction with an existing fitness facility operating on the premises.**Body Blitz** | Cancelled | |
| 2012-07-25 | Zoning review12 218296 LTO | No description on file | Closed | |
| 2011-10-20 | Building permit11 243614 | This is for interior alterations to all floors of this three(3) storey building. The alterations will be for a new spa "BODY BLITZ SPA". | Closed | |
| 2011-09-22 | Building permit11 279849 | Alternative Solution permit for reworking drains and grease traps in existing Day Spa - Personal Grooming Establishment - Body Blitz. | Approved | |
| 2011-03-01 | Zoning review11 135265 ZZC | No description on file | Cancelled | |
| 2010-12-31 | Building permit10 310631 | This is for the interior demolition of all three stories within this building. This is an interior demolition to return to base building for a future tenant fit up. | Closed | |
| 2008-01-15 | Zoning review08 103174 ZAL | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(340)
- Priority retail street: King Street East
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(340)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: King Street East
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
King-Parliament Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(340)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.0 (c1.0; r3.5) SS2 (x340)
- Height limit
- 25 m
- Corner lot
- No
- Public lane
- Virgin Pl, 19 m along it
- House footprint
- 584 m²
- Back yard
- 15.6 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 8 development applications open within 300 m, up to 55 storeys
- In the Corktown station area
- 5 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
8 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Assault: 3.5 times the Toronto median
- Robbery: 2.4 times the Toronto median
- Break and enter: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Moss Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Queen StationNearest station26 min walk
- King St East at Sackville StNearest TTC stop1 min walk
- Cherry StNearest cycling route1 min walk
- Inglenook Community SchoolSchool1 min walk
- St Paul Catholic Elementary SchoolSchool3 min walk
- Liberty Prep SchoolSchool7 min walk
- Nelson Mandela Park Public SchoolSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32226.8
- Robberycity median 69.5166.6
- Homicidecity median 5.33.4
- Shootingscity median 10.53.4
- Auto theftcity median 192.681.6
- Theft over $5,000city median 46.164.6
- Break and entercity median 172.8350.2
- Theft from vehiclescity median 188.1275.4
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist