Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 4885 Yonge St
4885 Yonge St is on a 17.3 m by 29.7 m lot on Yonge St in Yonge-Doris. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Greenfield Ave.
The City has 11 records on this lot since 2000. That is more than at 99% of Toronto houses. In 2022, a building permit was filed: "To erect and display two illuminated wall signs, displaying static copy at the first storey with the following details:sign a: with a face measuring 1.04m…". Status: closed. In 2013, a building permit was filed: "Revise plans by adding new delivery elevator to convert office to retail store - h mart". Status: revision issued. In 2013, a building permit was filed: "To erect and display eight illuminated wall signs on the southerly and westerly elevation of first storey, in conjunction with a supermarket. **m2m asian food…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 7 minor variance applications in the last 10 years and approved 71%. Sheppard station is a 3-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2013ModerateFree check
- Zoning not in By-law 569-2013Moderate
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2013
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
Building permit open since 2013
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
11 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-04-10 | By-law investigation25 142486 WST 00 IR | Waste | Closed | |
| 2025-03-21 | By-law investigation25 132506 WST 00 IR | Waste | Closed | |
| 2022-08-16 | Building permit22 129346 | To erect and display two illuminated wall signs, displaying static copy at the first storey with the following details:Sign A: with a face measuring 1.04m vertically by 5.16m horizontally, at the height of 4.37m on the east elevation.Sign B: with a face measuring 0.86m vertically by 4.52m horizontally, at the height of 4.50m on the south elevation.*****H MART***** | Closed | |
| 2016-06-07 | Zoning review16 169090 LTO | No description on file | Closed | |
| 2013-05-31 | Building permit12 174061 | Revise plans by adding new delivery elevator to Convert office to retail store - H Mart | Revision Issued | |
| 2013-05-23 | Building permit13 162743 | To erect and display eight illuminated wall signs on the southerly and westerly elevation of first storey, in conjunction with a supermarket. **M2M Asian Food Inc** | Closed | |
| 2012-08-15 | Minor varianceA490/12NY | This is an application to permit the conversion of the existing office space into a convenience store. | Refused | |
| 2012-05-03 | Zoning review12 165907 ZPR | No description on file | Cancelled | |
| 2003-10-16 | Zoning review03 186227 ZPU | No description on file | Closed | |
| 2000-03-08 | Building permit00 122636 | INTERIOR ALTERATION ON THE 1ST & 2ND FLOOR & RE-CLADDING OF WALLS 'OFFICE' | Closed | |
| 2000-03-07 | Building permit00 122644 | INSTALLING NEW ROOF TOP UNITS OF OFFICE BUILDING. bldg#122636 | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- Yes, also on Greenfield Ave
- Public lane
- Ln E Yonge N Greenfield Ave, 25.8 m along it
- House footprint
- 289 m²
- Back yard
- 7.8 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- 7 minor variance decisions within 300 m, 71% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-Doris neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Sheppard StationNearest station3 min walk
- Yonge St at Elmhurst AveNearest TTC stop1 min walk
- Sheppard Ave ENearest cycling route6 min walk
- ELPIS COLLEGE TORONTO (temporarily moved)School1 min walk
- Cardinal Carter Academy for the ArtsSchool2 min walk
- Rutherford Private School and DaycareSchool4 min walk
- Claude Watson School for the ArtsSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3510.7
- Robberycity median 69.570.6
- Auto theftcity median 192.699.6
- Theft over $5,000city median 46.158.1
- Break and entercity median 172.858.1
- Theft from vehiclescity median 188.1224.2
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist