Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 480 Danforth Ave
480 Danforth Ave is on a 23.2 m by 36.3 m lot on Danforth Ave in Playter Estates-Danforth. The zoning is CR. A site-specific exception, 900.11.10(2426), changes some of the usual rules for this address. The lot also fronts Logan Ave. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.
The City has 13 records on this lot since 2007. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Supply/install six (6) new awnings for td bank". Status: closed. In 2026, a building permit was filed: "A proposal to erect and display 2 wall signs and 2 projecting signs, all displaying static copy.***td***". Status: closed. In 2021, a building permit was filed: "Hvac - proposal for interior alterations 2nd floor "td bank"". Status: closed. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Chester station is a 4-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 3 building permits open, the oldest since 2007ModerateFree check
- Heritage property: listedModerate
- Site-specific exception 900.11.10(2426)Moderate
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 3 building permits open, the oldest since 2007
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
3 building permits open, the oldest since 2007
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
13 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-07-24 | Building permit26 194890 | Supply/install six (6) new awnings for TD Bank | Closed | |
| 2026-07-22 | Building permit26 193311 | A proposal to erect and display 2 Wall Signs and 2 Projecting Signs, all displaying static copy.***TD*** | Closed | |
| 2021-06-02 | Building permit21 148519 | HVAC - PROPOSAL FOR INTERIOR ALTERATIONS 2ND FLOOR "TD BANK" | Closed | |
| 2021-02-09 | Building permit21 107595 | Proposal for interior alteration to an existing ATM room in an existing TD branch to accommodate relocation of one existing ATM machine to exterior wall in order to be used from exterior. | Permit Issued | |
| 2020-10-23 | Zoning review20 210367 ZPR | No description on file | Closed | |
| 2020-02-06 | Building permit20 102986 | Install 3/4" DCVA backflow preventer | Closed | |
| 2018-08-23 | Building permit18 205143 | Proposed interior alterations to an existing bank and eclosing the ABM units on the ground floor. | Cancelled | |
| 2018-08-02 | Building permit18 203842 | Construct interior alterations to all finishes and enclosing ABM units on the ground floor for TD Bank | Cancelled | |
| 2011-03-08 | Building permit11 131596 | Proposal for interior alterations to second floor office space of existing 2 storey bank, "TD Canada Trust". | Inspection | |
| 2010-01-05 | Building permit09 192578 | Proposal to install one back flow prevention device | Closed | |
| 2008-08-07 | Building permit08 190225 | Proposal to erect temp stage for "Taste of the Danforth" on street. Aug7-Aug10/08. | Closed | |
| 2007-08-08 | Building permit07 251186 | To erect a temporary stage erected on Aug 9, 2007 dismantle Aug 12, 2007 | Closed | |
| 2007-04-26 | Building permit07 142417 | Make interior alterations to ground floor single-tenant office. | Inspection |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: listed
- Site-specific exception 900.11.10(2426)
What this part means for this house, in plain EnglishUnlock
Heritage property: listed
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(2426)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2426)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c2.5; r2.5) SS2 (x2426)
- Height limit
- 16 m
- Corner lot
- Yes, also on Logan Ave
- Public lane
- Ln N Danforth W Logan, 31.8 m along it
- House footprint
- 189 m²
- Back yard
- 17.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- In the Chester station area
- 20 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 2 of 7 categories
- Theft from vehicles: 3.8 times the Toronto median
- Assault: 2.2 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Playter Estates-Danforth neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Chester StationNearest station4 min walk
- Danforth Ave at Chester AveNearest TTC stop3 min walk
- Logan AveNearest cycling route1 min walk
- Frankland Community SchoolSchool2 min walk
- Holy Name Catholic Elementary SchoolSchool4 min walk
- Jackman Avenue Jr Public SchoolSchool7 min walk
- Centennial College School - Carlaw CampusSchool12 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31400.3
- Robberycity median 69.559.3
- Shootingscity median 10.511.9
- Auto theftcity median 192.6249.2
- Theft over $5,000city median 46.135.6
- Break and entercity median 172.8237.3
- Theft from vehiclescity median 188.1712
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist