Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 48 Bude St
48 Bude St is on a 7.6 m by 38.1 m lot on Bude St in Oakwood Village. The zoning is RM. A site-specific exception, 900.6.10(252), changes some of the usual rules for this address.
The City has 6 records on this lot since 2024. That is more than at 95% of Toronto houses. In 2025, a building permit was filed: "Proposal to demolish the rear detached garage and construct a new 2 storey garden suite.see also 25 163303 wnp". Status: inspection. In 2025, a building permit was filed: "Plumbing - proposal to construct a new three-storey multiplex (4 units). existing detached garage to remain in rear yard". Status: closed. In 2025, a building permit was filed: "Proposal to demolish the building". Status: permit issued. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 1 development application is open (the tallest up to 13 storeys). Oakwood station is a 8-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Records mention garden suite, multiplexModerateFree check
- Site-specific exception 900.6.10(252)Moderate
- House demolished in 2025, no new house permit on fileLow
- 1 development application open within 300 mLowFree check
- Minimum frontage 12 mLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- Records mention garden suite, multiplex
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention garden suite, multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buying
City files on this lot
6 records on file, more than at 95% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-09-10 | Building permit25 201208 | Proposal to demolish the rear detached garage and construct a new 2 storey garden suite.See also 25 163303 WNP. | Inspection | |
| 2025-04-11 | Building permit24 243925 | Plumbing - Proposal to construct a new three-storey multiplex (4 units). Existing detached garage to remain in rear yard. | Closed | |
| 2025-04-04 | Building permit24 243982 | Proposal to demolish the building. | Permit Issued | |
| 2025-02-02 | By-law investigation25 134350 WST 00 IV | Notice Issued Waste | Closed | |
| 2025-02-02 | By-law investigation25 111555 WST 00 IR | Waste | Closed | |
| 2024-09-10 | Zoning review24 210501 ZAP | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.6.10(252)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.6.10(252)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.6.10(252)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, garden suite
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
Minimum frontage 12 m
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RM (f12.0; u4; d0.8) (x252)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 13 storeys
- In the Oakwood station area
- 27 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Oakwood Village neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Oakwood StationNearest station8 min walk
- Oakwood Ave at Clovelly AveNearest TTC stop4 min walk
- Winona DrNearest cycling route1 min walk
- J R Wilcox Community SchoolSchool3 min walk
- D'Arcy McGee Catholic Elementary SchoolSchool8 min walk
- Leo Baeck Day School - South CampusSchool8 min walk
- St Thomas Aquinas Catholic Elementary SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3646.7
- Robberycity median 69.512.8
- Shootingscity median 10.54.3
- Auto theftcity median 192.6200
- Theft over $5,000city median 46.112.8
- Break and entercity median 172.8106.4
- Theft from vehiclescity median 188.1140.4
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist