Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 47 Fraser Ave
47 Fraser Ave is on a 28.2 m by 41.6 m lot on Fraser Ave in South Parkdale. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 8 records on this lot since 2008. That is more than at 98% of Toronto houses. In 2025, a Committee of Adjustment application was filed: "To alter the existing non-residential buildings by increasing the floor space index for commercial/office use, and to reduce the number of parking spaces. this…". Status: closed. In 2021, a development application was filed: "Site plan application to permit phase 2 of development for a new office building at 53 fraser avenue and 8-42 pardee avenue on the eastern portion of the…". Status: under review. In 2021, a development application was filed: "Site plan application to permit a new office building at 39-49 fraser avenue on the western portion of the property facing fraser avenue. the proposal includes…". Status: under review. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 8 development applications are open (the tallest up to 55 storeys). Within 300 m, the Committee of Adjustment decided 9 minor variance applications in the last 10 years and approved 100%. Exhibition GO station is a 8-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2021ModerateFree check
- Heritage property: designated (Part IV)Moderate
- Work or applications in progressModerateFree check
- Zoning not in By-law 569-2013Moderate
- 8 development applications open within 300 mLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
4 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2021
- Work or applications in progress
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Building permit open since 2021
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
8 records on file, more than at 98% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-03-05 | Minor varianceA0016/25TEY | To alter the existing non-residential buildings by increasing the Floor Space Index for commercial/office use, and to reduce the number of parking spaces. This site is currently undergoing two Site Plan Control applications (under File Numbers 21 250 999 STE 10 SA and 21 25 1000 STE 10 SA). | Approved | |
| 2021-12-22 | Development application21 251000 STE 10 SA | Site Plan Application to permit Phase 2 of development for a new office building at 53 Fraser Avenue and 8-42 Pardee Avenue on the eastern portion of the property facing Pardee Avenue. The proposal includes conserving the existing heritage building at 8 Pardee Avenue and adding a new 11-storey office building with a total non-residential gross floor area of 18,029 m2 and retail use of 551 m2. Phase 1 will include bicycle and loading spaces that will be shared with the development in Phase 2.A Rezoning Application (21 160624 STE 10 OZ) for the phased redevelopment of two office buildings is under review. Two separate site plan applications have been submitted for review as the development is a phased project. A concurrent site plan application is under review for Phase 1 (21 250 999 STE 10 SA) to permit a new 10-storey office building along Fraser Avenue. | Under Review | |
| 2021-12-22 | Development application21 250999 STE 10 SA | Site Plan Application to permit a new office building at 39-49 Fraser Avenue on the western portion of the property facing Fraser Avenue. The proposal includes conserving the existing heritage buildings on Fraser Avenue and adding office floors above, to a total height of 10 storeys with a non-residential gross floor area of 14,268 m2.A Rezoning Application (21 160624 STE 10 OZ) for the phased redevelopment of two office buildings is under review. Two separate site plan applications have been submitted for review as the development is a phased project. Phase 1 will include bicycle and loading spaces that will be shared with the development in Phase 2. A concurrent site plan application is under review for Phase 2(21 251000 STE 10 SA) to permit a new 11-storey office building along Pardee Avenue. | Under Review | |
| 2021-05-26 | Development application21 160624 STE 10 OZ | Zoning By-law Amendment application to facilitate the development of the site for two new 10 and 11-storey non-residential buildings on the lot, having a non-residential gross floor area of 30,757 square metres. | Council Approved | |
| 2021-02-03 | Building permit21 103383 | Proposal to repair the existing exterior stair. | Inspection | |
| 2018-05-15 | Building permit18 140436 | Proposal for interior alterations to unit 100 on ground floor of an existing office building. Tenant - "Outsider" | Closed | |
| 2015-01-20 | Building permit14 267124 | interior alterations to office unit 400 | Closed | |
| 2008-06-26 | Building permit08 175450 | Construct new rooftop patio on roof of #49 Fraser ( currently vacant) accessed by 4th floor office employees off Exit Stair of #135 Liberty St and #42 Pardee. | Cancelled |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Zoning not in By-law 569-2013
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 371 m²
- Back yard
- 24.9 m
- Buildings on the lot
- 3
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 8 development applications open within 300 m, up to 55 storeys
- 2 suite and multiplex permits within 300 m in 10 years
- 9 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
8 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 8 categories
- Assault: 1.8 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
South Parkdale neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Exhibition GO StationNearest station8 min walk
- Dufferin St at Liberty StNearest TTC stop4 min walk
- Dufferin StNearest cycling route7 min walk
- Holy Family Catholic Elementary SchoolSchool15 min walk
- Dr Rita Cox - Kina Minagok Public SchoolSchool15 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31140.3
- Robberycity median 69.568.6
- Homicidecity median 5.33.8
- Shootingscity median 10.57.6
- Auto theftcity median 192.672.5
- Theft over $5,000city median 46.145.8
- Break and entercity median 172.8240.3
- Theft from vehiclescity median 188.1205.9
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist