This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 46 Tenth St
46 Tenth St is on a 7.6 m by 34.4 m lot on Tenth St in New Toronto. The zoning is RD.
The City has 6 records on this lot since 2023. That is more than at 95% of Toronto houses. In 2025, a building permit was filed: "Rev : proposed revsion for structural, floor layout and opening changes on all levels. proposal for a second storey addition, front porch rear deck walk out…". Status: revision issued. In 2025, a Committee of Adjustment application was filed: "To maintain the existing front porch that is currently uncer construction". Status: closed. In 2024, a building permit was filed: "Proposal to replace the single car garage with a double car garage". Status: inspection. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 70 minor variance applications in the last 10 years and approved 87%. The nearest TTC stop is Lake Shore Blvd West at Tenth St, a 5-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2024ModerateFree check
- Work or applications in progressModerateFree check
- No permit for a second unit on fileLowFree check
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units · Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2024
- Work or applications in progress
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Building permit open since 2024
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
6 records on file, more than at 95% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-12-05 | Building permit24 240608 | REV : Proposed revsion for structural, floor layout and opening changes on all levels. Proposal for a second storey addition, front porch rear deck walk out and interior alterations to the existing dwelling. | Revision Issued | |
| 2025-11-06 | Minor varianceA0373/25EYK | To maintain the existing front porch that is currently uncer construction. | Approved | |
| 2024-09-19 | Zoning review24 215097 ZAP | No description on file | Application On Hold | |
| 2024-05-29 | Building permit24 114496 | Proposal to replace the single car garage with a double car garage | Inspection | |
| 2024-01-18 | Minor varianceA0446/23EYK | To construct a second storey addition above the existing dwelling and to legalize and to maintain a detached garage in the rear yard currently under construction. | Approved | |
| 2023-09-22 | Zoning review23 205621 ZAP | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 4 units: allowed
- Garden suite: likely fits
- Secondary suite: allowed
What this part means for this house, in plain EnglishUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RD (f7.5; a230; d0.4)
- Height limit
- 9.5 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 82 m²
- Back yard
- 17.4 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- 13 suite and multiplex permits within 300 m in 10 years
- 70 minor variance decisions within 300 m, 87% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Theft over $5,000: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
New Toronto neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Mimico GO StationNearest station38 min walk
- Lake Shore Blvd West at Tenth StNearest TTC stop5 min walk
- Lake Shore DrNearest cycling route2 min walk
- St Josaphat Catholic Elementary SchoolSchool4 min walk
- Children's Urban Enrichment StudioSchool6 min walk
- Seventh Street Jr SchoolSchool7 min walk
- Father John Redmond Catholic Secondary SchoolSchool12 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3903.2
- Robberycity median 69.576.5
- Shootingscity median 10.515.3
- Auto theftcity median 192.6145.4
- Theft over $5,000city median 46.191.9
- Break and entercity median 172.8183.7
- Theft from vehiclescity median 188.1244.9
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.